← Back
Two stories - detached, small or mid-size
1530 WEST 4 STREET
BROOKLYN · BIN 3174465
💬 Discuss this project
1925Year Built
2Stories
A1Building Class
R4-1Zoning
1,146 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 2,000 sf lot · 0.57 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanical
Cellar6p · 1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/01/2024$780K—Private party → —$681/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NIC 88 CORP211/25/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BASIC GROUPS403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CUBE BUILDERS GROUP NYGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NIC 88 CORP8371211/25/2024
Building Lifecycle
All (22)Filed (2)Permit Issued (1)Signed Off (1)Special Inspection (18)
11/26/2024
Signed off — Alteration
INTERIOR RENOVATION OF CELLAR, 1ST & 2ND FLOOR OF EXISTING 2 STORY BUILDING. DEMOLITION WORK AND CONSTRUCTION WORK AS PER PLAN. PARTITION, FLOORING, CEILING AND PAINTING THROUGHOUT, NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B01099614-I1
11/26/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
Eric Sun
11/26/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Eric Sun
11/26/2024
Special inspection requirement — Final
Eric Sun
11/26/2024
Special inspection requirement — Interior lighting power
Eric Sun
11/26/2024
Special inspection requirement — Air barrier - visual inspection
Eric Sun
11/26/2024
Special inspection requirement — HVAC-R and service water heating equipment
Eric Sun
11/26/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Eric Sun
11/26/2024
Special inspection requirement — Insulation placement and R values
Eric Sun
11/26/2024
Special inspection requirement — HVAC-R and service water heating system controls
Eric Sun
11/25/2024
Filed — Alteration
INTERIOR RENOVATION OF CELLAR, 1ST & 2ND FLOOR OF EXISTING 2 STORY BUILDING. DEMOLITION WORK AND CONSTRUCTION WORK AS PER PLAN. PARTITION, FLOORING, CEILING AND PAINTING THROUGHOUT, NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B01099614-P1
11/11/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Eric Sun
11/11/2024
Special inspection requirement — Final
Eric Sun
11/11/2024
Special inspection requirement — Air barrier - visual inspection
Eric Sun
11/11/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
Eric Sun
11/11/2024
Special inspection requirement — Interior lighting power
Eric Sun
11/11/2024
Special inspection requirement — HVAC-R and service water heating system controls
Eric Sun
11/11/2024
Special inspection requirement — HVAC-R and service water heating equipment
Eric Sun
11/11/2024
Special inspection requirement — Insulation placement and R values
Eric Sun
11/11/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Eric Sun
09/12/2024
Permit issued — General Construction
B01099614-I1-GC
09/05/2024
Filed — Alteration
INTERIOR RENOVATION OF CELLAR, 1ST & 2ND FLOOR OF EXISTING 2 STORY BUILDING. DEMOLITION WORK AND CONSTRUCTION WORK AS PER PLAN. PARTITION, FLOORING, CEILING AND PAINTING THROUGHOUT, NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B01099614-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offCUBE BUILDERS GROUP NY09/12/2024
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
11/26/2024Fenestration and door U-factor and product ratingsEric Sunenergy_progress
11/26/2024Fire-Resistant Penetrations and JointsEric Sunspecial
11/26/2024FinalEric Sunprogress
11/26/2024Interior lighting powerEric Sunenergy_progress
11/26/2024Air barrier - visual inspectionEric Sunenergy_progress
11/26/2024HVAC-R and service water heating equipmentEric Sunenergy_progress
11/26/2024HVAC-R and service water piping design and insulationEric Sunenergy_progress
11/26/2024Insulation placement and R valuesEric Sunenergy_progress
11/26/2024HVAC-R and service water heating system controlsEric Sunenergy_progress
11/11/2024Fire-Resistant Penetrations and JointsEric Sunspecial
11/11/2024FinalEric Sunprogress
11/11/2024Air barrier - visual inspectionEric Sunenergy_progress
11/11/2024Fenestration and door U-factor and product ratingsEric Sunenergy_progress
11/11/2024Interior lighting powerEric Sunenergy_progress
11/11/2024HVAC-R and service water heating system controlsEric Sunenergy_progress
11/11/2024HVAC-R and service water heating equipmentEric Sunenergy_progress
11/11/2024Insulation placement and R valuesEric Sunenergy_progress
11/11/2024HVAC-R and service water piping design and insulationEric Sunenergy_progress
▾Documents — 20 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/24/2026B01099614-P1Request digital key ↗
08/24/2026B01099614-I1Request digital key ↗
▸Seals & Professional Certifications16
▸DOB NOWProgress Inspector Seal & Signature12
08/28/2026B01099614-I1Open ↗
08/28/2026B01099614-I1Open ↗
08/28/2026B01099614-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/24/2026B01099614-I1Open ↗
08/24/2026B01099614-P1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/28/2026B01099614-I1Open ↗
08/23/2026B01099614-P1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/24/2026B01099614-P1Open ↗
08/24/2026B01099614-I1Open ↗