← Back
Over six families without stores
1531 68 STREET
BROOKLYN · Bensonhurst · BIN 3327618
💬 Discuss this project
1925Year Built
4Stories
C1Building Class
R5Zoning
48,000 sfGross Floor Area
64Units
Rent Stabilized21 Open Violations ▸FDNY Report ↗
Over six families without stores · Owner of record: 68TH STREET LLC · 12,000 sf lot · 4 FAR built · Flood zone X
Locations of Work
Plumbing
Cellar2p · 1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
68TH ST LLC303/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/29/2024$5.1M—STELNICK 68 LLC → MULTISTATE MANAGEMENT LLC$106/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GREGORY V. PEROTTO, P.E.307/14/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PEROTTO GROUP603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KINGS PLAZA P & H INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
GREGORY V. PEROTTO, P.E.947307/14/2020
Building Lifecycle
All (26)Filed (3)Permit Issued (2)Violation (9)Special Inspection (12)
11/09/2022
Violation issued (HPD, closed)
I
04/16/2021
Violation issued (HPD, closed)
A
07/14/2020
Filed — Alteration
REPLACE BOILER AND BURNER. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00366943-P1
07/14/2020
Special inspection requirement — Maintenance information
Gregory Perotto
07/14/2020
Special inspection requirement — Fire-Resistant Penetrations and Joints
Gregory Perotto
07/14/2020
Special inspection requirement — Heating Systems
Gregory Perotto
07/14/2020
Special inspection requirement — Lowest Floor Elevation
Gregory Perotto
07/14/2020
Special inspection requirement — HVAC and service water heating equipment
Gregory Perotto
07/14/2020
Special inspection requirement — HVAC and service water heating system controls
Gregory Perotto
07/11/2020
Special inspection requirement — Fire-Resistant Penetrations and Joints
Gregory Perotto
07/11/2020
Special inspection requirement — Heating Systems
Gregory Perotto
07/11/2020
Special inspection requirement — Lowest Floor Elevation
Gregory Perotto
07/11/2020
Special inspection requirement — Maintenance information
Gregory Perotto
07/11/2020
Special inspection requirement — HVAC and service water heating system controls
Gregory Perotto
07/11/2020
Special inspection requirement — HVAC and service water heating equipment
Gregory Perotto
07/10/2020
Permit issued — Plumbing
B00366970-I1-PL
07/10/2020
Permit issued — Boiler Equipment
B00366943-I1-BE
07/08/2020
Filed — Alteration
REPLACE BOILER AND BURNER. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00366943-I1
07/08/2020
Filed — Alteration
B00366970-I1
03/22/2020
Violation issued (HPD, open)
A
03/22/2020
Violation issued (HPD, closed)
C
10/27/2005
Violation issued (ECB, closed)
Construction
05/04/1998
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/01/1994
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/16/1993
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/01/1993
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedKINGS PLAZA P & H INC07/10/2020
DOB NOWBoiler EquipmentSigned-offS.J. FUEL CO., INC07/10/2020
1 project · most recent 07/10/2020
Boiler Controls
FiledStatusContractorScope
07/10/2020Permit IssuedBRANDL ELECTRIC INC.Boiler Controls
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
07/14/2020Maintenance informationGregory Perottoenergy_progress
07/14/2020Fire-Resistant Penetrations and JointsGregory Perottospecial
07/14/2020Heating SystemsGregory Perottospecial
07/14/2020Lowest Floor ElevationGregory Perottoprogress
07/14/2020HVAC and service water heating equipment Gregory Perottoenergy_progress
07/14/2020HVAC and service water heating system controls Gregory Perottoenergy_progress
07/11/2020Fire-Resistant Penetrations and JointsGregory Perottospecial
07/11/2020Heating SystemsGregory Perottospecial
07/11/2020Lowest Floor ElevationGregory Perottoprogress
07/11/2020Maintenance informationGregory Perottoenergy_progress
07/11/2020HVAC and service water heating system controls Gregory Perottoenergy_progress
07/11/2020HVAC and service water heating equipment Gregory Perottoenergy_progress
▾Documents — 24 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch - Boiler Equipment2
09/02/2026B00366943-I1Request digital key ↗
08/15/2026B00366943-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
09/02/2026B00366970-I1Request digital key ↗
▸Seals & Professional Certifications15
▸DOB NOWProgress Inspector Seal & Signature8
08/27/2026B00366943-P1Open ↗
08/27/2026B00366943-P1Open ↗
08/27/2026B00366943-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/27/2026B00366943-P1Open ↗
08/27/2026B00366943-P1Open ↗
08/26/2026B00366943-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/13/2026B00366970-I1Open ↗
08/13/2026B00366943-P1Open ↗
08/13/2026B00366943-I1Open ↗
▸Safety & Tenant Protection3
▸DOB NOWTenant Protection Plan3
08/13/2026B00366970-I1Open ↗
08/13/2026B00366943-I1Open ↗
08/13/2026B00366943-P1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/13/2026B00366943-P1Open ↗
08/13/2026B00366970-I1Open ↗
08/13/2026B00366943-I1Open ↗