← Back
Four families
1532 WEST 10 STREET
BROOKLYN · Bensonhurst · BIN 3174101
💬 Discuss this project
1927Year Built
2Stories
C3Building Class
R4-1Zoning
3,600 sfGross Floor Area
4Units
Rent Stabilized6 Open Violations ▸FDNY Report ↗
Four families · 2,650 sf lot · 1.36 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 28p · 2 filings · 12 docs
Floor 16p · 2 filings · 12 docs
Cellar9p · 2 filings · 12 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/22/2022$1.8M—Private party → Private party$490/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
G ENGINEERING PC401/26/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ECDESIGN STUDIO803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TT&T CONSTRUCTION INCGeneral Contractor203/21/2026
CATMAN PLUMBING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
G ENGINEERING PC7778201/26/2023
Building Lifecycle
All (29)Filed (4)Permit Issued (2)Signed Off (2)Violation (11)Inspection (4)Special Inspection (6)
05/06/2026
Violation issued (HPD, open)
A
06/11/2025
Violation issued (HPD, open)
A
04/12/2024
Violation issued (HPD, open)
A
11/17/2023
Violation issued (HPD, closed)
I
04/04/2023
Signed off — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH PLUMBING WORK:REPLACE KITCHEN AND BATHROOM FIXTURES; NEW BOILERS AND HOT WATER HEATERS ON CELLAR; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B08041825-I1
04/04/2023
Signed off — Alteration
B08041820-I1
03/30/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
03/27/2023
Violation issued (HPD, open)
A
03/09/2023
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
01/27/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIONGCAI GU
01/27/2023
Special inspection requirement — Energy Code Compliance Inspections
XIONGCAI GU
01/27/2023
Special inspection requirement — Fire-Resistance Rated Construction
XIONGCAI GU
01/26/2023
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH PLUMBING WORK:REPLACE KITCHEN AND BATHROOM FIXTURES; NEW BOILERS AND HOT WATER HEATERS ON CELLAR; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B08041825-P1
01/26/2023
Filed — Alteration
B08041820-P1
01/26/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIONGCAI GU
01/26/2023
Special inspection requirement — Energy Code Compliance Inspections
XIONGCAI GU
01/26/2023
Special inspection requirement — Fire-Resistance Rated Construction
XIONGCAI GU
01/18/2023
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
01/18/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/22/2022
Permit issued — Plumbing
B08041825-I1-PL
11/22/2022
Permit issued — General Construction
B08041820-I1-GC
11/18/2022
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH PLUMBING WORK:REPLACE KITCHEN AND BATHROOM FIXTURES; NEW BOILERS AND HOT WATER HEATERS ON CELLAR; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B08041825-I1
11/18/2022
Filed — Alteration
B08041820-I1
11/04/2022
Violation issued (HPD, closed)
I
03/02/2022
Violation issued (HPD, open)
A
04/13/2021
Violation issued (HPD, closed)
A
10/14/2015
Violation issued (HPD, closed)
I
08/19/1985
Violation issued (HPD, open)
B
01/20/1982
Violation issued (HPD, closed)
A
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offCATMAN PLUMBING INC11/22/2022
DOB NOWGeneral ConstructionSigned-offTT&T CONSTRUCTION INC11/22/2022
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
03/30/2023Pass-Final General Construction Non-Directive 14PassView ↗
03/09/2023Fail-Final General Construction Non-Directive 14FailView ↗
01/18/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
01/18/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
01/27/2023Fire-Resistant Penetrations and JointsXIONGCAI GUspecial
01/27/2023Energy Code Compliance InspectionsXIONGCAI GUprogress
01/27/2023Fire-Resistance Rated ConstructionXIONGCAI GUprogress
01/26/2023Fire-Resistant Penetrations and JointsXIONGCAI GUspecial
01/26/2023Energy Code Compliance InspectionsXIONGCAI GUprogress
01/26/2023Fire-Resistance Rated ConstructionXIONGCAI GUprogress
▾Documents — 12 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/28/2026B08041820-P1Request digital key ↗
08/28/2026B08041820-I1Request digital key ↗
08/27/2026B08041825-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications8
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/27/2026B08041825-I1Open ↗
08/27/2026B08041825-P1Open ↗
08/13/2026B08041820-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
09/01/2026B08041820-P1Open ↗
08/26/2026B08041820-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026B08041820-P1Open ↗
08/26/2026B08041820-I1Open ↗