← Back
BuildNYC
Two stories - detached, small or mid-size
1533 NEW YORK AVENUE
BROOKLYN · BIN 3114071
💬 Discuss this project
1915Year Built
2.5Stories
A1Building Class
R6Zoning
1,754 sfGross Floor Area
1Units
5 Active Violations ▸FDNY Report ↗
Two stories - detached, small or mid-size · 4,000 sf lot · 0.44 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofProposed 6 Story Residential BuildingUnder Construction12p · 1 filing · 20 docs
BulkheadProposed 6 Story Residential BuildingUnder Construction5p · 1 filing · 20 docs
Floor 6Proposed 6 Story Residential BuildingUnder Construction12p · 1 filing · 20 docs
Floor 5Proposed 6 Story Residential BuildingUnder Construction10p · 1 filing · 20 docs
Floor 4Proposed 6 Story Residential BuildingUnder Construction10p · 1 filing · 20 docs
Floor 3Proposed 6 Story Residential BuildingUnder Construction10p · 1 filing · 20 docs
Floor 2Proposed 6 Story Residential BuildingUnder Construction14p · 1 filing · 20 docs
Floor 1Proposed 6 Story Residential BuildingUnder Construction13p · 1 filing · 20 docs
Site & exteriorProposed 6 Story Residential BuildingUnder Construction72p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Black Steel Developers1211/10/2026
BS New York Properties210/13/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/15/2026$1.3M—Private party → BS NEW YORK AVE PROPERTIES LLC$745/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Mje Professional Services108/18/2026
Structure 22 Engineering307/27/2026
Vasilios Artemiou PE306/17/2026
Leandro Nils Dickson Architect303/27/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Expediting 4 U203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MJH ConstructionScaffold208/20/2026
MJH ConstructionGeneral Contractor109/12/2026
MJH Constructionspecialty_contractor111/10/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF Services5616507/27/2026
Building Lifecycle
11/02/2026
Permit issued — Mechanical Systems
B01361090-S4-MS
10/06/2026
At the time of my inspection, i observed housekeeping in operation. Workers and dump trucks taking out demolition materials and garbage. Two flag…
ECB violation · open
10/06/2026
At the time of my inspection, i observed housekeeping in operation. Workers and dump trucks taking out demolition materials and garbage across the…
ECB violation · open
10/06/2026
At the time of my inspection, i observed housekeeping in operation. Workers and dump trucks taking out demolition materials and garbage with jersey…
ECB violation · open
09/22/2026
At the time of inspection of a 3-story building, i observed building demolition to the grade. Piles of construction debris, garbage, sheetrock,…
ECB violation · open
68 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedMJH Construction11/02/2026
DOB NOWFull DemolitionPermit IssuedMJH Construction09/10/2026
DOB NOWConstruction FencePermit IssuedMJH Construction08/19/2026
DOB NOWConstruction FencePermit IssuedMJH Construction08/11/2026
1 project · most recent 07/27/2026
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScope
07/27/2026Permit IssuedMJH ConstructionAir Conditioning Systems, Heating Systems, Ventilation Systems
1 project · most recent 07/27/2026
Sprinkler System
FiledStatusContractorScope
07/27/2026——Sprinkler System
1 project · most recent 07/27/2026
Storm Water/Sanitary
FiledStatusContractorScope
07/27/2026——Storm, Water/Sanitary
2 projects · most recent 10/06/2026
General Wiring
FiledStatusContractorScope
10/06/2026Permit IssuedPower Direct ElectricGeneral Wiring
12/17/2025Permit IssuedForsure Electric NYGeneral Wiring
1 project · most recent 07/27/2026
Concrete
FiledStatusContractorScope
07/27/2026Permit IssuedMJH ConstructionConcrete
2 projects · most recent 08/18/2026
Fence
FiledStatusContractorScope
08/18/2026Permit IssuedMJH ConstructionFence
07/27/2026Permit IssuedMJH ConstructionFence
▾Special Inspection Requirements (DOB NOW) — 37
DateRequirementInspectorRole
07/22/2026Excavations - Sheeting, Shoring, and Bracing—special
07/22/2026Subgrade Inspections—special
07/22/2026Subsurface Conditions – Fill Placement & In-Place Density—special
07/16/2026Subgrade Inspections—special
07/16/2026Subsurface Investigations (Borings/Test Pits)—special
07/16/2026Concrete - Cast-In-Place—special
07/01/2026Concrete - Cast-In-Place—special
06/10/2026Post-installed Anchors—special
06/10/2026Fire-Resistant Penetrations and Joints—special
05/13/2026HVAC-R and service water heating equipment—energy_progress
05/13/2026HVAC-R and service water heating system controls—energy_progress
05/13/2026Fire-Resistant Penetrations and Joints—special
05/13/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation—special
05/13/2026HVAC-R and service water piping design and insulation—energy_progress
05/13/2026Maintenance information—energy_progress
05/03/2026Air barrier — testing —energy_progress
03/09/2026Final—progress
03/09/2026Sprinkler Systems—special
03/09/2026Final—progress
03/09/2026Footing and Foundation—progress
02/17/2026Insulation placement and R values—energy_progress
02/17/2026Fire-Resistance Rated Construction—progress
02/17/2026Energy Code Compliance Inspections—progress
02/17/2026Fire-Resistant Penetrations and Joints—special
02/17/2026Exterior Insulation and Finish Systems (EIFS)—special
Latest 25 of 37.
28 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account