← Back
Four families
1536 43 STREET
BROOKLYN · BIN 3128237
💬 Discuss this project
1910Year Built
4Stories
C3Building Class
R6Zoning
4,460 sfGross Floor Area
4Units
0 Open ViolationsFDNY Report ↗
Four families · 2,003 sf lot · 2.23 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalFire Protection
Roof24p · 1 filing · 20 docs
Floor 423p · 1 filing · 20 docs
Floor 323p · 1 filing · 20 docs
Floor 222p · 1 filing · 20 docs
Floor 120p · 1 filing · 20 docs
Cellar22p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1536 43 LLC603/22/2026
BH GENERAL CONTRACTING IN303/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/31/2022$1.4M—— → —$325/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AL FFRED ARCHITECTURE PLLC1002/20/2024
MSM ENGINEERING SERVICES, PLLC208/23/2023
ENTHINK ENGINEERS LLC306/09/2023
CHOSEN MEP, CORP.101/26/2023
ROBERT SIQECA PE309/16/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MISTER EXPEDITER1603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BH GENERAL CONTRACTING INGeneral Contractor3107/08/2026
PROFESSIONAL LINE CORPGeneral Contractor207/08/2026
ALL WAYS ELECTRIC CORP.WElectrical103/22/2026
S&R ELECTRICAL & MECHANICElectrical103/22/2026
M&D FIRE SPRINKLER INCFire Protection107/08/2026
DNA PLUMBING CONTR. INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA BUILDING & INSPECTION15191302/20/2024
ENTHINK ENGINEERS LLC6247106/03/2023
Building Lifecycle
All (183)Filed (19)Permit Issued (21)Signed Off (10)Violation (9)Inspection (14)Objection (80)Special Inspection (30)
08/29/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/04/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/28/2024
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
03/22/2024
Special inspection requirement — Insulation placement and R values
Younes Abouyaala
03/22/2024
Special inspection requirement — Interior lighting power
Younes Abouyaala
03/22/2024
Special inspection requirement — Lighting controls
Younes Abouyaala
03/22/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
Younes Abouyaala
03/22/2024
Special inspection requirement — Air barrier — testing
Younes Abouyaala
03/22/2024
Special inspection requirement — Air barrier - visual inspection
Younes Abouyaala
03/22/2024
Special inspection requirement — Metering
Younes Abouyaala
03/22/2024
Special inspection requirement — Permanent certificate
Younes Abouyaala
03/22/2024
Special inspection requirement — Fenestration areas
Younes Abouyaala
03/22/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Younes Abouyaala
03/22/2024
Special inspection requirement — Concrete - Cast-In-Place
Younes Abouyaala
03/22/2024
Special inspection requirement — Underpinning
Younes Abouyaala
03/22/2024
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Younes Abouyaala
03/22/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
INDARDEO PARBHUNATH
03/22/2024
Special inspection requirement — Masonry
Younes Abouyaala
03/22/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
03/22/2024
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
03/22/2024
Special inspection requirement — Fire-Resistance Rated Construction
Younes Abouyaala
03/22/2024
Special inspection requirement — Fenestration air leakage
Younes Abouyaala
03/22/2024
Special inspection requirement — Exterior lighting power
Younes Abouyaala
03/22/2024
Special inspection requirement — Lighting in dwelling units
Younes Abouyaala
03/18/2024
Objection resolved — Addressed
02/26/2024
Objection raised — Structural
02/20/2024
Filed — ALT-CO - New Building with Existing Elements to Remain
APPLICATION FILED FOR HORIZONTAL AND VERTICALENLARGEMENT OF EXISTING RESIDENTIAL USE BUILDING. CONVERT EXISTING 2-FAMILY USE TO MULTI-FAMILYRESIDENTIAL USE. FILED TO OBTAIN NEW CERTIFICATE OF OCCUPANCY.
B00785098-P9
01/23/2024
Special inspection requirement — Underpinning
Younes Abouyaala
01/23/2024
Special inspection requirement — Concrete - Cast-In-Place
Younes Abouyaala
01/23/2024
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
01/23/2024
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Younes Abouyaala
01/23/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Younes Abouyaala
01/23/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
01/23/2024
Special inspection requirement — Masonry
Younes Abouyaala
01/23/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
INDARDEO PARBHUNATH
01/23/2024
Special inspection requirement — Fire-Resistance Rated Construction
Younes Abouyaala
01/02/2024
Permit issued — General Construction
B00785098-I1-GC
12/09/2023
Signed off — ALT-CO - New Building with Existing Elements to Remain
APPLICATION FILED FOR HORIZONTAL AND VERTICALENLARGEMENT OF EXISTING RESIDENTIAL USE BUILDING. CONVERT EXISTING 2-FAMILY USE TO MULTI-FAMILYRESIDENTIAL USE. FILED TO OBTAIN NEW CERTIFICATE OF OCCUPANCY.
B00785098-S5
11/28/2023
Objection resolved — Addressed
11/22/2023
Objection resolved — Addressed
11/22/2023
Objection resolved — Addressed
11/17/2023
Objection raised — Other
11/17/2023
Objection raised — Other
11/17/2023
Objection raised — Other
11/08/2023
Filed — ALT-CO - New Building with Existing Elements to Remain
APPLICATION FILED FOR HORIZONTAL AND VERTICALENLARGEMENT OF EXISTING RESIDENTIAL USE BUILDING. CONVERT EXISTING 2-FAMILY USE TO MULTI-FAMILYRESIDENTIAL USE. FILED TO OBTAIN NEW CERTIFICATE OF OCCUPANCY.
B00785098-P8
11/01/2023
Signed off — ALT-CO - New Building with Existing Elements to Remain
APPLICATION FILED FOR HORIZONTAL AND VERTICALENLARGEMENT OF EXISTING RESIDENTIAL USE BUILDING. CONVERT EXISTING 2-FAMILY USE TO MULTI-FAMILYRESIDENTIAL USE. FILED TO OBTAIN NEW CERTIFICATE OF OCCUPANCY.
B00785098-S7
11/01/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/30/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
10/27/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
10/18/2023
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
09/27/2023
Signed off — ALT-CO - New Building with Existing Elements to Remain
APPLICATION FILED FOR HORIZONTAL AND VERTICALENLARGEMENT OF EXISTING RESIDENTIAL USE BUILDING. CONVERT EXISTING 2-FAMILY USE TO MULTI-FAMILYRESIDENTIAL USE. FILED TO OBTAIN NEW CERTIFICATE OF OCCUPANCY.
B00785098-S6
09/26/2023
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
09/19/2023
Signed off — ALT-CO - New Building with Existing Elements to Remain
APPLICATION FILED FOR HORIZONTAL AND VERTICALENLARGEMENT OF EXISTING RESIDENTIAL USE BUILDING. CONVERT EXISTING 2-FAMILY USE TO MULTI-FAMILYRESIDENTIAL USE. FILED TO OBTAIN NEW CERTIFICATE OF OCCUPANCY.
B00785098-S4
09/19/2023
Signed off — ALT-CO - New Building with Existing Elements to Remain
APPLICATION FILED FOR HORIZONTAL AND VERTICALENLARGEMENT OF EXISTING RESIDENTIAL USE BUILDING. CONVERT EXISTING 2-FAMILY USE TO MULTI-FAMILYRESIDENTIAL USE. FILED TO OBTAIN NEW CERTIFICATE OF OCCUPANCY.
B00785098-S8
09/18/2023
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
09/13/2023
Filed — ALT-CO - New Building with Existing Elements to Remain
APPLICATION FILED FOR HORIZONTAL AND VERTICALENLARGEMENT OF EXISTING RESIDENTIAL USE BUILDING. CONVERT EXISTING 2-FAMILY USE TO MULTI-FAMILYRESIDENTIAL USE. FILED TO OBTAIN NEW CERTIFICATE OF OCCUPANCY.
B00785098-P6
09/13/2023
Objection resolved — Addressed
09/11/2023
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
09/05/2023
Objection raised — Other
08/29/2023
Filed — ALT-CO - New Building with Existing Elements to Remain
APPLICATION FILED FOR HORIZONTAL AND VERTICALENLARGEMENT OF EXISTING RESIDENTIAL USE BUILDING. CONVERT EXISTING 2-FAMILY USE TO MULTI-FAMILYRESIDENTIAL USE. FILED TO OBTAIN NEW CERTIFICATE OF OCCUPANCY.
B00785098-P4
Latest 60 of 183 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedBH GENERAL CONTRACTING IN01/02/2024
DOB NOWGeneral ConstructionPermit IssuedBH GENERAL CONTRACTING IN08/29/2023
DOB NOWGeneral ConstructionPermit IssuedBH GENERAL CONTRACTING IN08/29/2023
DOB NOWConstruction FenceSigned-offBH GENERAL CONTRACTING IN08/22/2023
DOB NOWSupported ScaffoldSigned-offPROFESSIONAL LINE CORP06/29/2023
DOB NOWSprinklersSigned-offM&D FIRE SPRINKLER INC06/06/2023
DOB NOWSidewalk ShedSigned-offPROFESSIONAL LINE CORP05/22/2023
DOB NOWSupport of ExcavationSigned-offBH GENERAL CONTRACTING IN05/16/2023
DOB NOWStructuralSigned-offBH GENERAL CONTRACTING IN05/16/2023
DOB NOWSupport of ExcavationSigned-offBH GENERAL CONTRACTING IN05/16/2023
DOB NOWMechanical SystemsSigned-offBH GENERAL CONTRACTING IN05/16/2023
DOB NOWStructuralSigned-offBH GENERAL CONTRACTING IN05/15/2023
DOB NOWConstruction FenceSigned-offBH GENERAL CONTRACTING IN05/15/2023
DOB NOWGeneral ConstructionPermit IssuedBH GENERAL CONTRACTING IN04/25/2023
DOB NOWMechanical SystemsSigned-offBH GENERAL CONTRACTING IN03/31/2023
DOB NOWGeneral ConstructionPermit IssuedBH GENERAL CONTRACTING IN02/13/2023
DOB NOWFoundationSigned-offBH GENERAL CONTRACTING IN02/02/2023
DOB NOWConstruction FenceSigned-offBH GENERAL CONTRACTING IN02/01/2023
DOB NOWStructuralSigned-offBH GENERAL CONTRACTING IN01/31/2023
DOB NOWCurb CutSigned-offBH GENERAL CONTRACTING IN01/31/2023
DOB NOWPlumbingSigned-offDNA PLUMBING CONTR. INC01/31/2023
1 project · most recent 02/20/2024
Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
02/20/2024Permit IssuedBH GENERAL CONTRACTING INAir Conditioning Systems, Heating Systems
Cooling
Daikin 5MXS48TVJU 47,000 BTU · Condensing Unit ×4
MXZ-SM48NAM 45,500 BTU · Vrf Outdoor ×1
RX09AXJU 9,000 BTU · Condensing Unit ×1
Heating
Daikin 5MXS48TVJU 48,500 BTU ×4
Mitsubishi Electric mxz-sm48nam 49,500 BTU ×1
1 project · most recent 02/20/2024
Sprinkler System
FiledStatusContractorScope
02/20/2024Signed-offM&D FIRE SPRINKLER INCSprinkler System
1 project · most recent 02/20/2024
Gas Storm Water/Sanitary
FiledStatusContractorScope
02/20/2024Signed-offCOMPLETE PIPING & HEATINGGas, Storm, Water/Sanitary
3 projects · most recent 09/22/2023
General Wiring
FiledStatusContractorScope
09/22/2023CompleteS&R ELECTRICAL & MECHANICGeneral Wiring
05/22/2023CompleteRICHARD NEU—
09/25/2020CompleteALL WAYS ELECTRIC CORP.W—
1 project · most recent 02/20/2024
Steel
FiledStatusContractorScope
02/20/2024Permit IssuedBH GENERAL CONTRACTING INSteel
1 project · most recent 02/20/2024
Fence
FiledStatusContractorScope
02/20/2024Permit IssuedBH GENERAL CONTRACTING INFence
▾Field Inspections (DOB CAP) — 14
DateTypeResultReport
08/29/2025Pass-Final CND-Occupancy InspectionPassView ↗
04/04/2024Pass-Final CND-Occupancy InspectionPassView ↗
03/28/2024Fail-Final CND-Occupancy InspectionFailView ↗
11/01/2023Pass-Final CND-Occupancy InspectionPassView ↗
10/30/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/27/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/18/2023Fail-Final CND-Occupancy InspectionFailView ↗
09/26/2023Pass-Final Curb Cut Non-Directive 14PassView ↗
09/18/2023Fail-Final CND-Occupancy InspectionFailView ↗
09/11/2023Fail-Final Curb Cut Non-Directive 14FailView ↗
04/28/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/28/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
04/28/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
04/28/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 94
DateRequirementInspectorRole
03/22/2024Lighting in dwelling unitsYounes Abouyaalaenergy_progress
03/22/2024MeteringYounes Abouyaalaenergy_progress
03/22/2024Permanent certificateYounes Abouyaalaenergy_progress
03/22/2024Lighting controlsYounes Abouyaalaenergy_progress
03/22/2024Fenestration areasYounes Abouyaalaenergy_progress
03/22/2024Fenestration and door U-factor and product ratingsYounes Abouyaalaenergy_progress
03/22/2024Insulation placement and R valuesYounes Abouyaalaenergy_progress
03/22/2024Air barrier — testing Younes Abouyaalaenergy_progress
03/22/2024Air barrier - visual inspectionYounes Abouyaalaenergy_progress
03/22/2024Interior lighting powerYounes Abouyaalaenergy_progress
03/22/2024Structural Stability – Alterations of existing buildingsYounes Abouyaalaspecial
03/22/2024Concrete - Cast-In-PlaceYounes Abouyaalaspecial
03/22/2024UnderpinningYounes Abouyaalaspecial
03/22/2024Exterior Insulation and Finish Systems (EIFS)Younes Abouyaalaspecial
03/22/2024Subsurface Investigations (Borings/Test Pits)INDARDEO PARBHUNATHspecial
03/22/2024MasonryYounes Abouyaalaspecial
03/22/2024Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
03/22/2024Energy Code Compliance InspectionsYounes Abouyaalaprogress
03/22/2024Fire-Resistance Rated ConstructionYounes Abouyaalaprogress
03/22/2024Fenestration air leakageYounes Abouyaalaenergy_progress
03/22/2024Exterior lighting powerYounes Abouyaalaenergy_progress
01/23/2024Subsurface Investigations (Borings/Test Pits)INDARDEO PARBHUNATHspecial
01/23/2024Concrete - Cast-In-PlaceYounes Abouyaalaspecial
01/23/2024Exterior Insulation and Finish Systems (EIFS)Younes Abouyaalaspecial
01/23/2024Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
Latest 25 of 94.
▾Documents — 133 on file (BIS + DOB NOW)
▸Plans & Drawings19
▸DOB NOWPlans/Sketch19
08/27/2026B00869866-I1Request digital key ↗
08/27/2026B00869866-P1Request digital key ↗
08/26/2026B00785098-P9Request digital key ↗
Showing 3 of 19 on file for this type
▸Applications & Permits3
▸BISBPP-5 - Authorization to the Department of Transportation2
01/31/2023340872014Open ↗
01/31/2023340872014Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
11/21/2022340872014Open ↗
▸Zoning, Tax Lot & Property Records7
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026B00785098-P3Open ↗
08/13/2026B00785098-I1Open ↗
08/13/2026B00785098-P9Open ↗
▸DOB NOWZoning Exhibit form (1-5)3
08/13/2026B00785098-P3Open ↗
08/13/2026B00785098-P9Open ↗
08/13/2026B00785098-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00785098-I1Open ↗
▸Seals & Professional Certifications55
▸DOB NOWDPL-1: Design Professional Seal & Signature19
08/27/2026B00869866-I1Open ↗
08/26/2026B00785098-P9Open ↗
08/26/2026B00785098-P8Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature18
09/02/2026B00785098-S3Open ↗
08/28/2026B00785098-P3Open ↗
08/28/2026B00785098-P3Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWProgress Inspector Seal & Signature17
08/28/2026B00785098-P3Open ↗
08/28/2026B00785098-P3Open ↗
08/28/2026B00785098-P3Open ↗
Showing 3 of 17 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
01/31/2023340872014Open ↗
▸Trade Schedules & Equipment3
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/13/2026B00785098-P9Open ↗
08/13/2026B00785098-I1Open ↗
08/13/2026B00785098-P3Open ↗
▸Safety & Tenant Protection6
▸BISSTREET TREES SITE PLAN1
01/31/2023340872014Open ↗
▸BISSTREET TREE CHECKLIST1
01/31/2023340872014Open ↗
▸BISSTREET TREE SIGNOFF1
06/14/2023340872014Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00785098-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026B00785098-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026B00785098-I1Open ↗
▸Environmental & Asbestos18
▸DOB NOWDEP ACP-5: Asbestos Assessment Report16
08/26/2026B00785098-S4Open ↗
08/26/2026B00785098-P9Open ↗
08/26/2026B00785098-P6Open ↗
Showing 3 of 16 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
01/31/2023340872014Open ↗
01/31/2023340872014Open ↗
▸Energy Compliance2
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
12/13/2023340872014Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026B00785098-I1Open ↗
▸Inspections & Test Reports5
▸DOB NOWSOIL REPORT3
08/13/2026B00785098-P3Open ↗
08/13/2026B00785098-P9Open ↗
08/13/2026B00785098-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B00785098-I1Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026B00785098-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸BISCURB CUT (CC) SIGNOFF1
12/13/2023340872014Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
01/31/2023340872014Open ↗
▸Other Documents13
▸DOB NOWSite Survey: Initial3
08/13/2026B00785098-P9Open ↗
08/13/2026B00785098-I1Open ↗
08/13/2026B00785098-P3Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026B00785098-P3Open ↗
08/13/2026B00785098-I1Open ↗
08/13/2026B00785098-P9Open ↗
▸DOB NOWProperty Ownership Certification3
08/26/2026B00785098-P9Open ↗
08/26/2026B00785098-P3Open ↗
08/14/2026B00785098-I1Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
01/31/2023340872014Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
01/31/2023340872014Open ↗
▸DOB NOWFinal Survey1
08/13/2026B00785098-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B00785098-S3Open ↗