One family attached or semi-detached
1537 44 STREET
BROOKLYN · BIN 3128274
💬 Discuss this project
1910Year Built
3Stories
A5Building Class
R6Zoning
3,894 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
One family attached or semi-detached · 2,003 sf lot · 1.94 FAR built · Flood zone X
Locations of Work
Architecture
Roof1 filing · 20 docs
Floor 31 filing · 20 docs
Floor 21 filing · 20 docs
Floor 11 filing · 20 docs
Cellar1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MANAGEMENT3407/08/2026
BHY CONTRACTOR203/22/2026
BUY CONTRACTOR INC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/06/2021$1.3M—Private party → 1537 44 STREET LLC$327/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CHOSEN MEP, CORP.712/12/2023
MAYER SILBER ARCHITECT P.C.704/25/2023
SHARON ENGINEERING, P.C303/02/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EXPEDITER GROUP3403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BHY CONTRACTOR INCGeneral Contractor2407/08/2026
POWER DIRECT ELECTRIC INC 005103General Contractor403/22/2026
TOVIA WERZBERGERElectrical403/21/2026
M & M PIPING AND HEATINGPlumbing207/08/2026
HORBRIDGE PLUMBING & HEATINGPlumbing107/08/2026
DYNAMIC PLBNG & SPRKR CORFire Protection107/08/2026
IKE CHIBUZORElectrical103/21/2026
MAGNUM OPUS ARCHITECTUREElectrical103/21/2026
DIBENEDETTO PLUMBINGElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
IP CONCRETE TESTING AND I62521512/12/2023
Building Lifecycle
All (101)Filed (17)Permit Issued (16)Signed Off (5)Violation (3)Inspection (12)Objection (18)Special Inspection (30)
01/19/2026
Signed off — ALT-CO - New Building with Existing Elements to Remain
MECCHANICAL PLANS FILED HEREWITH
B00546771-S1
11/10/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/27/2025
Permit issued — Sprinklers
B00546771-S1-PL
02/10/2025
Signed off — ALT-CO - New Building with Existing Elements to Remain
MECCHANICAL PLANS FILED HEREWITH
B00546771-S4
02/10/2025
Signed off — ALT-CO - New Building with Existing Elements to Remain
MECCHANICAL PLANS FILED HEREWITH
B00546771-S3
11/06/2024
Signed off — ALT-CO - New Building with Existing Elements to Remain
MECCHANICAL PLANS FILED HEREWITH
B00546771-S2
03/14/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/07/2024
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
02/21/2024
Inspection — No Access-Final PL - Up to 3 Requested Floors
No Access
View inspection ↗
02/09/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
12/12/2023
Filed — ALT-CO - New Building with Existing Elements to Remain
MECCHANICAL PLANS FILED HEREWITH
B00546771-A3
12/12/2023
Special inspection requirement — Post-installed Anchors
INDARDEO PARBHUNATH
12/12/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
INDARDEO PARBHUNATH
12/12/2023
Special inspection requirement — Seismic Isolation Systems
INDARDEO PARBHUNATH
12/12/2023
Special inspection requirement — Sprinkler Systems
INDARDEO PARBHUNATH
11/09/2023
Inspection — Fail-Final SP - Up to 3 Requested Floors
Fail
View inspection ↗
11/06/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
10/30/2023
Filed — ALT-CO - New Building with Existing Elements to Remain
MECCHANICAL PLANS FILED HEREWITH
B00546771-A2
10/30/2023
Special inspection requirement — Seismic Isolation Systems
INDARDEO PARBHUNATH
10/30/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
INDARDEO PARBHUNATH
10/30/2023
Special inspection requirement — Sprinkler Systems
INDARDEO PARBHUNATH
10/30/2023
Special inspection requirement — Post-installed Anchors
INDARDEO PARBHUNATH
09/29/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/18/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/11/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/22/2023
Filed — ALT-CO - New Building with Existing Elements to Remain
MECCHANICAL PLANS FILED HEREWITH
B00546771-A1
08/22/2023
Special inspection requirement — Shutoff dampers
INDARDEO PARBHUNATH
08/22/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
INDARDEO PARBHUNATH
08/22/2023
Special inspection requirement — Energy Code Compliance Inspections
INDARDEO PARBHUNATH
08/22/2023
Special inspection requirement — Mechanical Systems
INDARDEO PARBHUNATH
08/22/2023
Special inspection requirement — Final
NAVEEN KUMAR
08/22/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
INDARDEO PARBHUNATH
08/22/2023
Special inspection requirement — Heating Systems
INDARDEO PARBHUNATH
08/22/2023
Special inspection requirement — HVAC-R and service water heating equipment
INDARDEO PARBHUNATH
08/22/2023
Special inspection requirement — HVAC-R and service water heating system controls
INDARDEO PARBHUNATH
08/09/2023
Signed off — ALT-CO - New Building with Existing Elements to Remain
MECCHANICAL PLANS FILED HEREWITH
B00546771-S5
08/09/2023
Permit issued — General Construction
B00546771-I1-GC
05/02/2023
Filed — ALT-CO - New Building with Existing Elements to Remain
MECCHANICAL PLANS FILED HEREWITH
B00546771-P7
05/01/2023
Special inspection requirement — Insulation placement and R values
INDARDEO PARBHUNATH
05/01/2023
Special inspection requirement — Permanent certificate
INDARDEO PARBHUNATH
05/01/2023
Special inspection requirement — Air barrier - visual inspection
INDARDEO PARBHUNATH
05/01/2023
Special inspection requirement — Fenestration areas
INDARDEO PARBHUNATH
05/01/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
INDARDEO PARBHUNATH
05/01/2023
Special inspection requirement — Energy Code Compliance Inspections
INDARDEO PARBHUNATH
05/01/2023
Special inspection requirement — Fire-Resistance Rated Construction
INDARDEO PARBHUNATH
05/01/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
INDARDEO PARBHUNATH
05/01/2023
Special inspection requirement — Fenestration air leakage
INDARDEO PARBHUNATH
05/01/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
INDARDEO PARBHUNATH
05/01/2023
Special inspection requirement — Protection of exposed foundation insulation
INDARDEO PARBHUNATH
04/25/2023
Filed — ALT-CO - New Building with Existing Elements to Remain
MECCHANICAL PLANS FILED HEREWITH
B00546771-P9
04/25/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
INDARDEO PARBHUNATH
04/25/2023
Special inspection requirement — Permanent certificate
INDARDEO PARBHUNATH
03/28/2023
Objection resolved — Addressed
03/24/2023
Objection raised — Admin
03/23/2023
Filed — ALT-CO - New Building with Existing Elements to Remain
MECCHANICAL PLANS FILED HEREWITH
B00546771-P8
01/23/2023
Permit issued — General Construction
B00546771-I1-GC
01/23/2023
Permit issued — General Construction
B00546771-I1-GC
10/31/2022
Permit issued — General Construction
B00546771-I1-GC
10/31/2022
Permit issued — General Construction
B00546771-I1-GC
10/22/2022
Permit issued — Structural
B00546771-S3-ST
Latest 60 of 101 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offM & M PIPING AND HEATING08/27/2025
DOB NOWGeneral ConstructionPermit IssuedBHY CONTRACTOR INC08/09/2023
DOB NOWGeneral ConstructionPermit IssuedBHY CONTRACTOR INC01/23/2023
DOB NOWGeneral ConstructionPermit IssuedBHY CONTRACTOR INC01/23/2023
DOB NOWGeneral ConstructionPermit IssuedBHY CONTRACTOR INC10/31/2022
DOB NOWGeneral ConstructionPermit IssuedBHY CONTRACTOR INC10/31/2022
DOB NOWStructuralSigned-offBHY CONTRACTOR INC10/22/2022
DOB NOWFoundationSigned-offBHY CONTRACTOR INC10/22/2022
DOB NOWMechanical SystemsSigned-offBHY CONTRACTOR INC10/22/2022
DOB NOWConstruction FenceSigned-offBHY CONTRACTOR INC10/20/2022
DOB NOWSprinklersSigned-offCITYWIDE PLBG, HTG &SPRKL06/29/2022
DOB NOWSprinklersSigned-offHORBRIDGE PLUMBING & HEAT05/10/2022
DOB NOWFoundationSigned-offBHY CONTRACTOR INC11/15/2021
DOB NOWMechanical SystemsSigned-offBHY CONTRACTOR INC11/10/2021
DOB NOWStructuralSigned-offBHY CONTRACTOR INC11/10/2021
DOB NOWConstruction FenceSigned-offBHY CONTRACTOR INC11/10/2021
1 project · most recent 12/12/2023
Air Conditioning Systems Associated Ducts and Piping Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
12/12/2023Permit IssuedBHY CONTRACTOR INCAir Conditioning Systems, Associated Ducts and Piping, Heating Systems, Ventilation Systems
Cooling
Mitsubishi Electric MUZ-GL18NA 18,000 BTU · Heat Pump Outdoor ×2
MXZ-SM48NAM 48,000 BTU · Heat Pump Outdoor ×2
PUMY-60NKMU3 60,000 BTU · Vrf Outdoor ×2
Heating
Mitsubishi Electric RXTQ48TAVJU 49,500 BTU · Vrf Outdoor ×8
Qmark CSH-07A 4,266 BTU · Electric Heater ×8
Trinity LX200 398,000 BTU · Boiler ×4
Ventilation
Whisper Warm FV-11VH1 50 CFM · Exhaust Fan ×12
Greenheck CP-A250 200 CFM · Exhaust Fan ×4
SP-B150 150 CFM · Exhaust Fan ×2
Zephyr Z5H 50 CFM · Kitchen Exhaust ×6
Ducts & Piping
__Junk__ DUCTS Ductwork ×2
1 project · most recent 12/12/2023
Gas Storm Water/Sanitary
FiledStatusContractorScope
12/12/2023Signed-offM & M PIPING AND HEATINGGas, Storm, Water/Sanitary
1 project · most recent 10/27/2025
General Wiring
FiledStatusContractorScope
10/27/2025CompletePOWER DIRECT ELECTRIC INCGeneral Wiring
1 project · most recent 12/12/2023
Fence
FiledStatusContractorScope
12/12/2023Signed-offM & M PIPING AND HEATINGFence
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
11/10/2025Pass-Final CND-Occupancy InspectionPassView ↗
03/14/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/07/2024Pass-Final SP - Up to 3 Requested FloorsPassView ↗
02/21/2024No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
02/09/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/09/2023Fail-Final SP - Up to 3 Requested FloorsFailView ↗
11/06/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/29/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/18/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/11/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/01/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/01/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 102
DateRequirementInspectorRole
12/12/2023Seismic Isolation SystemsINDARDEO PARBHUNATHspecial
12/12/2023Sprinkler SystemsINDARDEO PARBHUNATHspecial
12/12/2023Fire-Resistant Penetrations and JointsINDARDEO PARBHUNATHspecial
12/12/2023Post-installed AnchorsINDARDEO PARBHUNATHspecial
10/30/2023Fire-Resistant Penetrations and JointsINDARDEO PARBHUNATHspecial
10/30/2023Sprinkler SystemsINDARDEO PARBHUNATHspecial
10/30/2023Seismic Isolation SystemsINDARDEO PARBHUNATHspecial
10/30/2023Post-installed AnchorsINDARDEO PARBHUNATHspecial
08/22/2023Energy Code Compliance InspectionsINDARDEO PARBHUNATHprogress
08/22/2023FinalNAVEEN KUMARprogress
08/22/2023Shutoff dampersINDARDEO PARBHUNATHenergy_progress
08/22/2023HVAC-R and service water heating equipmentINDARDEO PARBHUNATHenergy_progress
08/22/2023Fire-Resistant Penetrations and JointsINDARDEO PARBHUNATHspecial
08/22/2023HVAC-R and service water heating system controlsINDARDEO PARBHUNATHenergy_progress
08/22/2023Mechanical SystemsINDARDEO PARBHUNATHspecial
08/22/2023Heating SystemsINDARDEO PARBHUNATHspecial
08/22/2023HVAC-R and service water piping design and insulationINDARDEO PARBHUNATHenergy_progress
05/01/2023Energy Code Compliance InspectionsINDARDEO PARBHUNATHprogress
05/01/2023Structural Stability – Alterations of existing buildingsINDARDEO PARBHUNATHspecial
05/01/2023Fire-Resistant Penetrations and JointsINDARDEO PARBHUNATHspecial
05/01/2023Fire-Resistance Rated ConstructionINDARDEO PARBHUNATHprogress
05/01/2023Fenestration and door U-factor and product ratingsINDARDEO PARBHUNATHenergy_progress
05/01/2023Fenestration areasINDARDEO PARBHUNATHenergy_progress
05/01/2023Fenestration air leakageINDARDEO PARBHUNATHenergy_progress
05/01/2023Air barrier - visual inspectionINDARDEO PARBHUNATHenergy_progress
Latest 25 of 102.
▾Documents — 180 on file (BIS + DOB NOW)
▸Plans & Drawings20
▸DOB NOWPlans/Sketch20
09/01/2026B00546771-P7Request digital key ↗
09/01/2026B00546771-P5Request digital key ↗
09/01/2026B00546771-S1Request digital key ↗
Showing 3 of 20 on file for this type
▸Zoning, Tax Lot & Property Records16
▸DOB NOWZD1: DOB Zoning Diagram9
09/01/2026B00546771-P5Open ↗
09/01/2026B00546771-P9Open ↗
09/01/2026B00546771-P9Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWZoning Exhibit form (1-5)6
09/01/2026B00546771-P9Open ↗
09/01/2026B00546771-P5Open ↗
08/15/2026B00546771-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/15/2026B00546771-I1Open ↗
▸Seals & Professional Certifications115
▸DOB NOWProgress Inspector Seal & Signature55
09/05/2026B00546771-P8Open ↗
09/05/2026B00546771-P8Open ↗
09/05/2026B00546771-P8Open ↗
Showing 3 of 55 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature43
09/05/2026B00546771-P8Open ↗
09/05/2026B00546771-P8Open ↗
09/02/2026B00546771-I1Open ↗
Showing 3 of 43 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature17
09/01/2026B00546771-P8Open ↗
09/01/2026B00546771-P7Open ↗
09/01/2026B00546771-P5Open ↗
Showing 3 of 17 on file for this type
▸Trade Schedules & Equipment6
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)6
09/01/2026B00546771-P5Open ↗
09/01/2026B00546771-P9Open ↗
08/15/2026B00546771-I1Open ↗
Showing 3 of 6 on file for this type
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Sign Off1
08/15/2026B00546771-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/15/2026B00546771-I1Open ↗
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
08/15/2026B00546771-I1Open ↗
08/14/2026B00546771-S2Open ↗
▸Inspections & Test Reports3
▸DOB NOWTR4 Test Report and Plot Diagram1
09/01/2026B00546771-S4Open ↗
▸DOB NOWSOIL REPORT1
09/01/2026B00546771-S4Open ↗
▸DOB NOWTR4 Plot Diagram1
09/01/2026B00546771-S4Open ↗
▸Cost, Insurance & Ownership2
▸DOB NOWCertification by Insurance Broker or Agency1
08/15/2026B00546771-I1Open ↗
▸DOB NOWCertificate of Insurance1
08/15/2026B00546771-I1Open ↗
▸Other Documents14
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone6
09/01/2026B00546771-P5Open ↗
09/01/2026B00546771-P9Open ↗
08/15/2026B00546771-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSite Survey: Initial5
09/01/2026B00546771-P5Open ↗
09/01/2026B00546771-P9Open ↗
08/15/2026B00546771-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWAdjoining Owners Notification1
09/01/2026B00546771-S4Open ↗
▸DOB NOWProperty Ownership Certification1
09/01/2026B00546771-P2Open ↗
▸DOB NOWAdditional Insured Authorizations1
08/15/2026B00546771-I1Open ↗