← Back
BuildNYC
Miscellaneous two family
154-01 64TH AVENUE
QUEENS · BIN 4146681
💬 Discuss this project
1950Year Built
3Stories
B9Building Class
R4Zoning
1,620 sfGross Floor Area
2Units
Miscellaneous two family · 1,000 sf lot · 1.62 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof1- to 2-Family Conversion1p · 1 filing · 18 docs
Floor 31- to 2-Family Conversion4p · 1 filing · 18 docs
Floor 21- to 2-Family Conversion7p · 2 filings · 20 docs
Floor 11- to 2-Family Conversion8p · 2 filings · 20 docs
Cellar2p · 1 filing · 10 docs
Site & exterior3p · 1 filing · 10 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/05/2024$980K—Private party → Private party$605/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Mehdi Ghazi, P.E411/25/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Ibuild Consulting803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Splen ConstructionGeneral Contractor303/21/2026
Wasoff Plumbing & Utility CoPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Mehdi Ghazi, P.E7129411/25/2022
Building Lifecycle
All (80)Filed (4)Permit Issued (3)Signed Off (1)Inspection (4)Objection (38)Special Inspection (30)
12/28/2022
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/25/2022
Special inspection requirement — Interior lighting power
MEHDI GHAZI
12/25/2022
Special inspection requirement — Air barrier - visual inspection
MEHDI GHAZI
12/25/2022
Special inspection requirement — Mechanical Systems
MEHDI GHAZI
12/25/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
MEHDI GHAZI
12/25/2022
Special inspection requirement — Heating Systems
MEHDI GHAZI
12/25/2022
Special inspection requirement — Concrete - Cast-In-Place
MEHDI GHAZI
12/25/2022
Special inspection requirement — Final
MEHDI GHAZI
12/25/2022
Special inspection requirement — Fire-Resistance Rated Construction
MEHDI GHAZI
12/25/2022
Special inspection requirement — Energy Code Compliance Inspections
MEHDI GHAZI
12/25/2022
Special inspection requirement — Metering
MEHDI GHAZI
12/25/2022
Special inspection requirement — HVAC-R and service water heating equipment
MEHDI GHAZI
12/25/2022
Special inspection requirement — HVAC-R and service water heating system controls
MEHDI GHAZI
12/25/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
MEHDI GHAZI
12/25/2022
Special inspection requirement — Ventilation and air distribution system
MEHDI GHAZI
12/25/2022
Special inspection requirement — Fenestration air leakage
MEHDI GHAZI
12/21/2022
Objection resolved — Addressed
12/21/2022
Objection resolved — Addressed
12/03/2022
Objection raised — Other
12/03/2022
Objection raised — Other
11/25/2022
Filed — Alteration CO
PROPOSE CONVERSION FROM ONE- TO TWO-FAMILY RESIDENCE. OBTAIN NEW C.O.
Q00495101-P2
11/25/2022
Special inspection requirement — Metering
MEHDI GHAZI
11/25/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
MEHDI GHAZI
11/25/2022
Special inspection requirement — Concrete - Cast-In-Place
MEHDI GHAZI
11/25/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
MEHDI GHAZI
11/25/2022
Special inspection requirement — Heating Systems
MEHDI GHAZI
11/25/2022
Special inspection requirement — Mechanical Systems
MEHDI GHAZI
11/25/2022
Special inspection requirement — Energy Code Compliance Inspections
MEHDI GHAZI
11/25/2022
Special inspection requirement — Final
MEHDI GHAZI
11/25/2022
Special inspection requirement — Fire-Resistance Rated Construction
MEHDI GHAZI
11/25/2022
Special inspection requirement — HVAC-R and service water heating system controls
MEHDI GHAZI
11/25/2022
Special inspection requirement — Air barrier - visual inspection
MEHDI GHAZI
11/25/2022
Special inspection requirement — Interior lighting power
MEHDI GHAZI
11/25/2022
Special inspection requirement — Fenestration air leakage
MEHDI GHAZI
11/25/2022
Special inspection requirement — Ventilation and air distribution system
MEHDI GHAZI
11/25/2022
Special inspection requirement — HVAC-R and service water heating equipment
MEHDI GHAZI
11/01/2022
Signed off — Alteration
INSTALLATION OF PLUMBING WORK AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q00485691-I1
08/18/2022
Permit issued — Plumbing
Q00485691-I1-PL
02/14/2022
Filed — Alteration
INSTALLATION OF PLUMBING WORK AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q00485691-P1
12/30/2021
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
12/30/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/30/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
11/03/2021
Permit issued — Plumbing
Q00485691-I1-PL
10/13/2021
Permit issued — General Construction
Q00495101-I1-GC-CX
10/11/2021
Filed — Alteration
INSTALLATION OF PLUMBING WORK AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q00485691-I1
08/14/2021
Objection raised — Other
08/14/2021
Objection resolved — Addressed
07/08/2021
Objection raised — Fire_Protection
07/08/2021
Objection resolved — Addressed
05/14/2021
Objection raised — Mechanical
05/14/2021
Objection resolved — Addressed
05/14/2021
Objection raised — Energy
05/14/2021
Objection resolved — Addressed
05/14/2021
Objection raised — Zoning
05/14/2021
Objection resolved — Addressed
05/14/2021
Objection raised — Zoning
05/14/2021
Objection resolved — Addressed
05/14/2021
Objection raised — Fire_Protection
05/14/2021
Objection resolved — Addressed
05/14/2021
Objection raised — Scope
Latest 60 of 80 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offWasoff Plumbing & Utility Co08/18/2022
DOB NOWPlumbingSigned-offWasoff Plumbing & Utility Co11/03/2021
DOB NOWGeneral ConstructionPermit IssuedSplen Construction10/13/2021
1 project · most recent 11/25/2022
Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
11/25/2022Permit IssuedSplen ConstructionHeating Systems, Ventilation Systems
Heating
Navien NCB-150E 120,000 BTU · Boiler ×2
NCB-240E 199,900 BTU · Boiler ×2
Ventilation
Delta Breeze SLM 50 50 CFM · Exhaust Fan ×2
1 project · most recent 07/12/2022
General Wiring
FiledStatusContractorScope
07/12/2022CompleteKJK ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
12/28/2022Pass-Final CND-Occupancy InspectionPassView ↗
12/30/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/30/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/30/2021Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 34
DateRequirementInspectorRole
12/25/2022Interior lighting powerMEHDI GHAZIenergy_progress
12/25/2022Air barrier - visual inspectionMEHDI GHAZIenergy_progress
12/25/2022Mechanical SystemsMEHDI GHAZIspecial
12/25/2022Fire-Resistant Penetrations and JointsMEHDI GHAZIspecial
12/25/2022Heating SystemsMEHDI GHAZIspecial
12/25/2022Concrete - Cast-In-PlaceMEHDI GHAZIspecial
12/25/2022FinalMEHDI GHAZIprogress
12/25/2022Fire-Resistance Rated ConstructionMEHDI GHAZIprogress
12/25/2022Energy Code Compliance InspectionsMEHDI GHAZIprogress
12/25/2022MeteringMEHDI GHAZIenergy_progress
12/25/2022HVAC-R and service water heating equipmentMEHDI GHAZIenergy_progress
12/25/2022HVAC-R and service water heating system controlsMEHDI GHAZIenergy_progress
12/25/2022Fenestration and door U-factor and product ratingsMEHDI GHAZIenergy_progress
12/25/2022Ventilation and air distribution systemMEHDI GHAZIenergy_progress
12/25/2022Fenestration air leakageMEHDI GHAZIenergy_progress
11/25/2022MeteringMEHDI GHAZIenergy_progress
11/25/2022Fenestration and door U-factor and product ratingsMEHDI GHAZIenergy_progress
11/25/2022Concrete - Cast-In-PlaceMEHDI GHAZIspecial
11/25/2022Fire-Resistant Penetrations and JointsMEHDI GHAZIspecial
11/25/2022Heating SystemsMEHDI GHAZIspecial
11/25/2022Mechanical SystemsMEHDI GHAZIspecial
11/25/2022Energy Code Compliance InspectionsMEHDI GHAZIprogress
11/25/2022FinalMEHDI GHAZIprogress
11/25/2022Fire-Resistance Rated ConstructionMEHDI GHAZIprogress
11/25/2022HVAC-R and service water heating system controlsMEHDI GHAZIenergy_progress
Latest 25 of 34.
▾Documents — 28 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/27/2026Q00485691-P1Request digital key ↗
08/27/2026Q00485691-I1Request digital key ↗
08/14/2026Q00495101-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00495101-I1Open ↗
▸Seals & Professional Certifications14
▸DOB NOWProgress Inspector Seal & Signature6
10/01/2026Q00485691-P1Open ↗
09/28/2026Q00485691-I1Open ↗
08/23/2026Q00495101-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/27/2026Q00485691-I1Open ↗
08/13/2026Q00495101-P2Open ↗
08/13/2026Q00485691-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
10/01/2026Q00485691-P1Open ↗
09/28/2026Q00485691-I1Open ↗
08/23/2026Q00495101-I1Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist2
08/13/2026Q00495101-P2Open ↗
08/13/2026Q00495101-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q00495101-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/27/2026Q00485691-I1Open ↗
08/13/2026Q00495101-P2Open ↗
08/13/2026Q00495101-I1Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00495101-I1Open ↗
▸Other Documents1
▸DOB NOWFinal Survey1
08/13/2026Q00495101-I1Open ↗