← Back
QUEENS
154-03 25TH AVE
QUEENS · BIN 4109600
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HCD ARCHITECT PC105/25/2026
Building Lifecycle
All (19)Filed (1)Objection (6)Special Inspection (12)
06/23/2026
Objection resolved — Addressed
06/23/2026
Objection resolved — Addressed
06/23/2026
Objection resolved — Open
06/15/2026
Objection raised — Scope
06/15/2026
Objection raised — Structural
06/15/2026
Objection raised — Admin
05/25/2026
Filed — Alteration
Q01396334-I1
05/01/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
05/01/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
05/01/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
05/01/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
05/01/2026
Special inspection requirement — Mechanical Systems
05/01/2026
Special inspection requirement — Wood – Prefabricated I-Joists
05/01/2026
Special inspection requirement — Final
05/01/2026
Special inspection requirement — Footing and Foundation
05/01/2026
Special inspection requirement — Air barrier - visual inspection
05/01/2026
Special inspection requirement — Insulation placement and R values
05/01/2026
Special inspection requirement — Permanent certificate
05/01/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BISOTISSUEDSUNRUN INSTALLATION SVC06/26/2023
BIS—ISSUEDN/A12/03/1993
1 project · most recent 06/26/2023
FiledStatusContractorScope
06/26/2023CompleteSUNRUN SOLAR ELECTL CORP—
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
05/01/2026Excavations - Sheeting, Shoring, and Bracing—special
05/01/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation—special
05/01/2026Structural Stability – Alterations of existing buildings—special
05/01/2026Subsurface Investigations (Borings/Test Pits)—special
05/01/2026Mechanical Systems—special
05/01/2026Wood – Prefabricated I-Joists—special
05/01/2026Final—progress
05/01/2026Footing and Foundation—progress
05/01/2026Air barrier - visual inspection—energy_progress
05/01/2026Insulation placement and R values—energy_progress
05/01/2026Permanent certificate—energy_progress
05/01/2026Fenestration and door U-factor and product ratings—energy_progress
▾Documents — 34 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/15/2026Q01396334-I1Request digital key ↗
▸Applications & Permits5
▸BISPLAN / WORK APPROVAL APPLICATION4
10/13/2023440790039Open ↗
10/10/2023440790039Open ↗
06/21/2023440790039Open ↗
Showing 3 of 4 on file for this type
▸BISWORK PERMIT APPLICATION1
06/26/2023440790039Open ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWZD1: DOB Zoning Diagram1
08/15/2026Q01396334-I1Open ↗
▸Seals & Professional Certifications4
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
06/21/2023440790039Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
06/21/2023440790039Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
06/21/2023440790039Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/16/2026Q01396334-I1Open ↗
▸Safety & Tenant Protection1
▸BISTPP1: TENANT PROTECTION PLAN1
06/26/2023440790039Open ↗
▸Environmental & Asbestos2
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
06/21/2023440790039Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/15/2026Q01396334-I1Open ↗
▸Energy Compliance7
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
10/19/2023440790039Open ↗
06/21/2023440790039Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
10/19/2023440790039Open ↗
▸BISSOLAR TAX ABATEMENT APPLICATION1
10/20/2023440790039Open ↗
▸BISNYCECC ANALYSIS1
06/21/2023440790039Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
06/21/2023440790039Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
06/21/2023440790039Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
10/19/2023440790039Open ↗
06/21/2023440790039Open ↗
▸Approvals, Objections & Sign-offs4
▸BISLETTERS - SUPPORTING DOCUMENTATION3
10/20/2023440790039Open ↗
10/20/2023440790039Open ↗
06/21/2023440790039Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
10/20/2023440790039Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
10/19/2023440790039Open ↗
06/21/2023440790039Open ↗
▸Filing & Intake Forms2
▸BISADDITIONAL INFORMATION1
10/13/2023440790039Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
06/21/2023440790039Open ↗
▸Other Documents3
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/15/2026Q01396334-I1Open ↗
▸DOB NOWPlot Diagram1
08/15/2026Q01396334-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/15/2026Q01396334-I1Open ↗