← Back
Condo, residential unit in 1-3 story building
154-18 17 ROAD
QUEENS · Whitestone-Beechhurst · BIN 4446580
💬 Discuss this project
1975Year Built
2Stories
R3Building Class
R3-1Zoning
172,490 sfGross Floor Area
58Units
LL97 CoveredRent Stabilized13 Open Violations 9 unresolved · 4 paperwork only ▸FDNY Report ↗
Condo, residential unit in 1-3 story building · 223,055 sf lot · 0.77 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SERRAS CONTRACTING307/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC110/09/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNRUN103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CUNNINGHAM ELECTRIC CORPElectrical103/22/2026
SUNRUN INSTALLATION SVCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272110/09/2025
Building Lifecycle
All (8)Filed (1)Permit Issued (1)Signed Off (1)Special Inspection (5)
07/02/2026
Signed off — Alteration
Q01299122-I1
10/16/2025
Permit issued — Solar
Q01299122-I1-SL
10/09/2025
Filed — Alteration
Q01299122-I1
10/07/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
10/07/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
10/07/2025
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
10/07/2025
Special inspection requirement — Final
Walid Abdulla
10/07/2025
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC10/16/2025
2 projects · most recent 01/12/2026
General Wiring
FiledStatusContractorScope
01/12/2026CompleteCUNNINGHAM ELECTRIC CORPGeneral Wiring
10/08/2025Permit IssuedSUNRUN SOLAR ELECTL CORP1 meters
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
10/07/2025Fire-Resistant Penetrations and JointsWalid Abdullaspecial
10/07/2025Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
10/07/2025Energy Code Compliance InspectionsWalid Abdullaprogress
10/07/2025FinalWalid Abdullaprogress
10/07/2025Air barrier - visual inspectionWalid Abdullaenergy_progress
▾Documents — 9 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/18/2026Q01299122-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWProgress Inspector Seal & Signature3
08/31/2026Q01299122-I1Open ↗
08/31/2026Q01299122-I1Open ↗
08/31/2026Q01299122-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/31/2026Q01299122-I1Open ↗
08/31/2026Q01299122-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026Q01299122-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026Q01299122-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/18/2026Q01299122-I1Open ↗