← Back
Two stories - detached, small or mid-size
154-20 32 AVENUE
QUEENS · Murray Hill-Broadway Flushing · BIN 4109820
💬 Discuss this project
1920Year Built
2.75Stories
A1Building Class
R2AZoning
1,796 sfGross Floor Area
1Units
2 Open Violations ▸
Two stories - detached, small or mid-size · 2,704 sf lot · 0.66 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Roof1p · 1 filing · 8 docs
Cellar4p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TJAR GROUP103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
FOCAL POINT ARCHITECTS & ASS.101/27/2024
AMERILAND BROOK LLC610/14/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
FOCAL POINT DESIGN & CONST. INC.203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
3T GC LLCGeneral Contractor109/30/2026
SDC CONTRACT INCGeneral Contractor104/09/2026
TJAR GROUP CORPGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AMERILAND BROOK LLC1506310/14/2022
Building Lifecycle
All (60)Filed (7)Permit Issued (3)Violation (4)Objection (16)Special Inspection (30)
09/29/2026
Permit issued — Construction Fence
Q00997116-I1-FN
07/20/2026
Violation issued (ECB, open)
Construction
07/20/2026
Violation issued (ECB, open)
Construction
05/07/2025
Permit issued — Construction Fence
Q00997116-I1-FN
04/14/2025
Violation issued (ECB, closed)
Construction
02/27/2024
Permit issued — Construction Fence
Q00997116-I1-FN
02/12/2024
Objection raised — Other
02/12/2024
Objection resolved — Addressed
01/27/2024
Filed — Alteration
Filing for 8' high temporary construction plywood fence in conjunction with NB job DOBNOW: Q00666434. No change in egress, use and occupancy.
Q00997116-I1
09/20/2023
Violation issued (DOB, closed)
V%*-DOB VIOLATION - DISMISSED
10/14/2022
Filed — New Building
PROPOSE A NEW TWO STORY WITH ONE FAMILY HOUSE. OBTAIN NEW C OF O.
Q00666434-S1
09/25/2022
Filed — Alteration
FILE MH WORKTYPE IN CONJUNCTION WITH NB JOB# Q00666434
Q00667142-P1
09/25/2022
Filed — Alteration
FILE PL WORKTYPE IN CONJUNCTION WITH NB JOB#Q000666434
Q00667099-P1
09/25/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
09/25/2022
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
09/25/2022
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
09/25/2022
Special inspection requirement — Sprinkler Systems
09/25/2022
Special inspection requirement — Energy Code Compliance Inspections
09/25/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
XIAOHONG ZHAO
09/25/2022
Special inspection requirement — HVAC-R and service water heating system controls
XIAOHONG ZHAO
09/25/2022
Special inspection requirement — HVAC-R and service water heating equipment
XIAOHONG ZHAO
09/25/2022
Special inspection requirement — Maintenance information
XIAOHONG ZHAO
09/25/2022
Special inspection requirement — Chimneys and vents
XIAOHONG ZHAO
09/25/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIAOHONG ZHAO
09/25/2022
Special inspection requirement — Heating Systems
XIAOHONG ZHAO
09/25/2022
Special inspection requirement — Mechanical Systems
XIAOHONG ZHAO
09/25/2022
Special inspection requirement — Energy Code Compliance Inspections
XIAOHONG ZHAO
09/25/2022
Special inspection requirement — Final
XIAOHONG ZHAO
09/25/2022
Special inspection requirement — Fire-Resistance Rated Construction
XIAOHONG ZHAO
09/25/2022
Special inspection requirement — Maintenance information
XIAOHONG ZHAO
09/25/2022
Special inspection requirement — HVAC-R and service water heating system controls
XIAOHONG ZHAO
09/25/2022
Special inspection requirement — Metering
XIAOHONG ZHAO
09/25/2022
Special inspection requirement — Duct leakage testing, insulation and design
XIAOHONG ZHAO
09/25/2022
Special inspection requirement — Permanent certificate
XIAOHONG ZHAO
09/25/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
XIAOHONG ZHAO
09/25/2022
Special inspection requirement — Interior lighting power
XIAOHONG ZHAO
09/25/2022
Special inspection requirement — Lighting controls
XIAOHONG ZHAO
09/25/2022
Special inspection requirement — HVAC-R and service water heating equipment
XIAOHONG ZHAO
09/25/2022
Special inspection requirement — Ventilation and air distribution system
XIAOHONG ZHAO
08/27/2022
Filed — Alteration
FILE PL WORKTYPE IN CONJUNCTION WITH NB JOB#Q000666434
Q00667099-I1
07/20/2022
Filed — Alteration
FILE MH WORKTYPE IN CONJUNCTION WITH NB JOB# Q00666434
Q00667142-I1
03/15/2022
Objection raised — Other
03/15/2022
Objection resolved — Addressed
02/01/2022
Objection raised — Scope
02/01/2022
Objection resolved — Addressed
02/01/2022
Objection raised — Zoning
02/01/2022
Objection resolved — Addressed
02/01/2022
Objection raised — Zoning
02/01/2022
Objection resolved — Addressed
02/01/2022
Objection raised — Zoning
02/01/2022
Objection resolved — Addressed
02/01/2022
Objection raised — Scope
02/01/2022
Objection resolved — Addressed
02/01/2022
Objection raised — Zoning
02/01/2022
Objection resolved — Addressed
01/21/2022
Filed — New Building
PROPOSE A NEW TWO STORY WITH ONE FAMILY HOUSE. OBTAIN NEW C OF O.
Q00666434-I1
01/21/2022
Special inspection requirement — Exterior lighting power
01/21/2022
Special inspection requirement — Concrete - Cast-In-Place
01/21/2022
Special inspection requirement — Electric vehicle service equipment requirements
01/21/2022
Special inspection requirement — Permanent certificate
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FencePermit Issued3T GC LLC09/29/2026
DOB NOWConstruction FencePermit IssuedSDC CONTRACT INC05/07/2025
DOB NOWConstruction FencePermit IssuedTJAR GROUP CORP02/27/2024
1 project · most recent 09/25/2022
Associated Ducts and Piping Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
09/25/2022——Associated Ducts and Piping, Heating Systems
Heating
Williamson GWA-140 140,000 BTU · Boiler ×5
Ducts & Piping
Delta Breeze SLIM50 50 CFM · Exhaust Fan ×20
Air King EB30BL 130 CFM · Kitchen Exhaust ×5
1 project · most recent 09/25/2022
Gas Storm Water/Sanitary
FiledStatusContractorScope
09/25/2022——Gas, Storm, Water/Sanitary
1 project · most recent 10/14/2022
Wood
FiledStatusContractorScope
10/14/2022——Wood
1 project · most recent 01/27/2024
Fence
FiledStatusContractorScope
01/27/2024Permit Issued3T GC LLCFence
▾Special Inspection Requirements (DOB NOW) — 55
DateRequirementInspectorRole
09/25/2022Fire-Resistant Penetrations and Joints—special
09/25/2022Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation—special
09/25/2022Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities—special
09/25/2022Sprinkler Systems—special
09/25/2022Energy Code Compliance Inspections—progress
09/25/2022HVAC-R and service water piping design and insulationXIAOHONG ZHAOenergy_progress
09/25/2022HVAC-R and service water heating system controlsXIAOHONG ZHAOenergy_progress
09/25/2022HVAC-R and service water heating equipmentXIAOHONG ZHAOenergy_progress
09/25/2022Maintenance informationXIAOHONG ZHAOenergy_progress
09/25/2022Chimneys and ventsXIAOHONG ZHAOspecial
09/25/2022Fire-Resistant Penetrations and JointsXIAOHONG ZHAOspecial
09/25/2022Heating SystemsXIAOHONG ZHAOspecial
09/25/2022Mechanical SystemsXIAOHONG ZHAOspecial
09/25/2022Energy Code Compliance InspectionsXIAOHONG ZHAOprogress
09/25/2022FinalXIAOHONG ZHAOprogress
09/25/2022Fire-Resistance Rated ConstructionXIAOHONG ZHAOprogress
09/25/2022Maintenance informationXIAOHONG ZHAOenergy_progress
09/25/2022HVAC-R and service water heating system controlsXIAOHONG ZHAOenergy_progress
09/25/2022MeteringXIAOHONG ZHAOenergy_progress
09/25/2022Duct leakage testing, insulation and designXIAOHONG ZHAOenergy_progress
09/25/2022Permanent certificateXIAOHONG ZHAOenergy_progress
09/25/2022HVAC-R and service water piping design and insulationXIAOHONG ZHAOenergy_progress
09/25/2022Interior lighting powerXIAOHONG ZHAOenergy_progress
09/25/2022Lighting controlsXIAOHONG ZHAOenergy_progress
09/25/2022HVAC-R and service water heating equipmentXIAOHONG ZHAOenergy_progress
Latest 25 of 55.
▾Documents — 35 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/26/2026Q00667142-I1Request digital key ↗
08/26/2026Q00667142-P1Request digital key ↗
08/25/2026Q00667099-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits4
▸BISPLAN / WORK APPROVAL APPLICATION3
07/29/2022440736651Open ↗
12/23/2021421806950Open ↗
07/07/2021421786892Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
07/29/2022440736651Open ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026Q00666434-I1Open ↗
▸Seals & Professional Certifications13
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/26/2026Q00667142-I1Open ↗
08/26/2026Q00667142-P1Open ↗
08/25/2026Q00667099-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
08/28/2026Q00667099-P1Open ↗
08/26/2026Q00667142-P1Open ↗
08/26/2026Q00667142-P1Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
07/29/2022440736651Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
07/29/2022440736651Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/26/2026Q00667142-P1Open ↗
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/13/2026Q00666434-I1Open ↗
▸Safety & Tenant Protection2
▸BISSTREET TREE CHECKLIST1
07/29/2022440736651Open ↗
▸DOB NOWStreet Tree Checklist1
08/13/2026Q00666434-I1Open ↗
▸Filing & Intake Forms6
▸BISEFILING COVER SHEET2
12/23/2021421806950Open ↗
07/07/2021421786892Open ↗
▸BISBOROUGH INTAKE FORM2
12/23/2021421806950Open ↗
07/07/2021421786892Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
07/29/2022440736651Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
07/29/2022440736651Open ↗
▸Other Documents3
▸BISBPP - SUPPORTING DOCUMENTATION1
07/29/2022440736651Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026Q00666434-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/13/2026Q00666434-I1Open ↗