← Back
Two stories - detached, small or mid-size
154-90 RIVERSIDE DRIVE
QUEENS · BIN 4103250
💬 Discuss this project
1920Year Built
2Stories
A1Building Class
R1-2Zoning
2,560 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 6,000 sf lot · 0.43 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
31-53 35TH REALTY LLC903/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
FRANK PETRUSO ARCHITECT PC208/09/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SAL D'AMICO CONSTR. INCGeneral Contractor203/21/2026
ADRIANO PLMBG & HTG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA BUILDING & INSPECTION1519108/09/2023
FRANK PETRUSO ARCHITECT,P993108/09/2023
Building Lifecycle
All (16)Filed (2)Permit Issued (2)Signed Off (2)Inspection (5)Special Inspection (5)
12/29/2023
Signed off — Alteration
RENOVATED EXISTING KITCHEN AND CONSTRUCT OPEN PORCH AT REAR. NO CHANGE TO USE EGRESS OR OCCUPANCY
Q00916867-I1
12/14/2023
Signed off — Alteration
RENOVATE KITCHEN/INSTALL PLUMBING FIXTURES AND GAS APPLICANCES.
Q00917027-I1
12/04/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
11/25/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/21/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/20/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/04/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/19/2023
Permit issued — Plumbing
Q00917027-I1-PL
08/30/2023
Permit issued — Mechanical Systems
Q00916867-I1-GC-CX
08/09/2023
Filed — Alteration
RENOVATED EXISTING KITCHEN AND CONSTRUCT OPEN PORCH AT REAR. NO CHANGE TO USE EGRESS OR OCCUPANCY
Q00916867-I1
08/09/2023
Filed — Alteration
RENOVATE KITCHEN/INSTALL PLUMBING FIXTURES AND GAS APPLICANCES.
Q00917027-I1
08/09/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Frank Petruso
08/09/2023
Special inspection requirement — Mechanical Systems
Frank Petruso
08/09/2023
Special inspection requirement — Wood – Seismic Resistance
Younes Abouyaala
08/09/2023
Special inspection requirement — Final
Frank Petruso
08/09/2023
Special inspection requirement — Footing and Foundation
Frank Petruso
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offADRIANO PLMBG & HTG CORP09/19/2023
DOB NOWMechanical SystemsSigned-offSAL DAMICO CONSTR08/30/2023
BIS—ISSUEDSANO CONSTR. CORP.11/24/1999
BISEQISSUEDSANO CONSTR. CORP.11/24/1999
BISPLISSUEDFRESH MEADOW MECH PLBG LL11/05/1999
BIS—ISSUEDMARDENE CONT06/03/1999
1 project · most recent 11/10/2023
General Wiring
FiledStatusContractorScope
11/10/2023CompleteTOPP WIRE ELECTRIC, INCGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
12/04/2023Pass-Final General Construction Non-Directive 14PassView ↗
11/25/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/21/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/20/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/04/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
08/09/2023Structural Stability – Alterations of existing buildingsFrank Petrusospecial
08/09/2023Mechanical SystemsFrank Petrusospecial
08/09/2023Wood – Seismic ResistanceYounes Abouyaalaspecial
08/09/2023FinalFrank Petrusoprogress
08/09/2023Footing and FoundationFrank Petrusoprogress
▾Documents — 9 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/24/2026Q00916867-I1Request digital key ↗
08/24/2026Q00917027-I1Request digital key ↗
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/24/2026Q00917027-I1Open ↗
08/13/2026Q00916867-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/23/2026Q00916867-I1Open ↗
08/23/2026Q00916867-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/23/2026Q00916867-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/24/2026Q00917027-I1Open ↗
08/13/2026Q00916867-I1Open ↗