← Back
BuildNYC
Two family frame
154 DAVIS AVENUE
STATEN ISLAND · BIN 5175226
💬 Discuss this project
2022Year Built
2Stories
B2Building Class
R3XZoning
2,716 sfGross Floor Area
2Units
0 Active ViolationsFDNY Report ↗
Two family frame · 7,880 sf lot · 0.34 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofProposed Two Family Dwellings4p · 1 filing · 20 docs
Attic7p · 1 filing · 8 docs
Floor 2Proposed Two Family Dwellings10p · 2 filings · 20 docs
Floor 1Proposed Two Family Dwellings34p · 2 filings · 20 docs
CellarProposed Two Family Dwellings12p · 2 filings · 20 docs
Basement4p · 1 filing · 8 docs
Site & exteriorProposed Two Family Dwellings3p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Joseph M. Morace, A.I.A., Architect608/07/2023
Island Associates306/21/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Island Associates903/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Wallace Avenue ConstructionGeneral Contractor403/21/2026
Duo Plumbing & HeatingPlumbing207/08/2026
Duo Plumbing & HeatingFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Island Engineering Associates264608/07/2023
Building Lifecycle
All (58)Filed (9)Permit Issued (5)Signed Off (3)Inspection (9)Objection (2)Special Inspection (30)
08/07/2023
Filed — New Building
PROPOSED TWO STORY TWO-FAMILY DETACHED DWELLING WITH ACCESSORY OFF-STREET PARKING FOR THREE CARS.
S00671519-P5
08/07/2023
Special inspection requirement — Air barrier — testing
WILLIAM DURDEN, P.E.
08/07/2023
Special inspection requirement — Interior lighting power
WILLIAM DURDEN, P.E.
08/07/2023
Special inspection requirement — Fenestration areas
WILLIAM DURDEN, P.E.
08/07/2023
Special inspection requirement — Concrete - Cast-In-Place
WILLIAM DURDEN, P.E.
08/07/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
WILLIAM DURDEN, P.E.
08/07/2023
Special inspection requirement — Mechanical Systems
WILLIAM DURDEN, P.E.
08/07/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
WILLIAM DURDEN, P.E.
08/07/2023
Special inspection requirement — Subgrade Inspections
WILLIAM DURDEN, P.E.
08/07/2023
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
WILLIAM DURDEN, P.E.
08/07/2023
Special inspection requirement — Energy Code Compliance Inspections
WILLIAM DURDEN, P.E.
08/07/2023
Special inspection requirement — Final
WILLIAM DURDEN, P.E.
08/07/2023
Special inspection requirement — Fire-Resistance Rated Construction
WILLIAM DURDEN, P.E.
08/07/2023
Special inspection requirement — Footing and Foundation
WILLIAM DURDEN, P.E.
08/07/2023
Special inspection requirement — Structural Wood Frame
WILLIAM DURDEN, P.E.
08/07/2023
Special inspection requirement — Insulation placement and R values
WILLIAM DURDEN, P.E.
08/07/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
WILLIAM DURDEN, P.E.
08/07/2023
Special inspection requirement — HVAC-R and service water heating system controls
WILLIAM DURDEN, P.E.
08/07/2023
Special inspection requirement — Ventilation and air distribution system
WILLIAM DURDEN, P.E.
08/07/2023
Special inspection requirement — Duct leakage testing, insulation and design
WILLIAM DURDEN, P.E.
08/07/2023
Special inspection requirement — Protection of exposed foundation insulation
WILLIAM DURDEN, P.E.
08/07/2023
Special inspection requirement — Permanent certificate
WILLIAM DURDEN, P.E.
08/07/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
WILLIAM DURDEN, P.E.
08/07/2023
Special inspection requirement — Fenestration air leakage
WILLIAM DURDEN, P.E.
08/07/2023
Special inspection requirement — HVAC-R and service water heating equipment
WILLIAM DURDEN, P.E.
08/07/2023
Special inspection requirement — Metering
WILLIAM DURDEN, P.E.
08/07/2023
Special inspection requirement — Electric vehicle service equipment requirements
WILLIAM DURDEN, P.E.
08/07/2023
Special inspection requirement — Maintenance information
WILLIAM DURDEN, P.E.
08/07/2023
Special inspection requirement — Air barrier - visual inspection
WILLIAM DURDEN, P.E.
08/07/2023
Special inspection requirement — Air barrier continuity plan testing
WILLIAM DURDEN, P.E.
07/06/2023
Filed — New Building
PROPOSED TWO STORY TWO-FAMILY DETACHED DWELLING WITH ACCESSORY OFF-STREET PARKING FOR THREE CARS.
S00671519-P3
07/03/2023
Signed off — New Building
PROPOSED TWO STORY TWO-FAMILY DETACHED DWELLING WITH ACCESSORY OFF-STREET PARKING FOR THREE CARS.
S00671519-S1
06/28/2023
Signed off — Alteration
FILED HEREWITH; RESIDENTIAL FIRE SPRINKLER PLAN
S00609561-I1
06/27/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/23/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/22/2023
Special inspection requirement — Sprinkler Systems
WILLIAM DURDEN, P.E.
06/21/2023
Filed — Alteration
FILED HEREWITH; RESIDENTIAL FIRE SPRINKLER PLAN
S00609561-P2
06/20/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/20/2023
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
06/16/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
06/12/2023
Signed off — New Building
PROPOSED TWO STORY TWO-FAMILY DETACHED DWELLING WITH ACCESSORY OFF-STREET PARKING FOR THREE CARS.
S00671519-S2
05/22/2023
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
11/15/2022
Filed — New Building
PROPOSED TWO STORY TWO-FAMILY DETACHED DWELLING WITH ACCESSORY OFF-STREET PARKING FOR THREE CARS.
S00671519-P1
11/14/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/24/2022
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
08/08/2022
Permit issued — Curb Cut
S00671519-S2-CC
08/01/2022
Filed — New Building
PROPOSED TWO STORY TWO-FAMILY DETACHED DWELLING WITH ACCESSORY OFF-STREET PARKING FOR THREE CARS.
S00671519-S2
07/12/2022
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
06/21/2022
Permit issued — Plumbing
S00671519-S1-PL
06/17/2022
Permit issued — Sprinklers
S00609561-I1-EW-SP
06/17/2022
Permit issued — Plumbing
S00609561-I1-PL
05/26/2022
Filed — New Building
PROPOSED TWO STORY TWO-FAMILY DETACHED DWELLING WITH ACCESSORY OFF-STREET PARKING FOR THREE CARS.
S00671519-S1
05/26/2022
Permit issued — Foundation
S00671519-I1-GC-CX
04/13/2022
Objection raised — Scope
04/13/2022
Objection resolved — Addressed
04/12/2022
Filed — Alteration
FILED HEREWITH; RESIDENTIAL FIRE SPRINKLER PLAN
S00609561-P1
03/21/2022
Filed — New Building
PROPOSED TWO STORY TWO-FAMILY DETACHED DWELLING WITH ACCESSORY OFF-STREET PARKING FOR THREE CARS.
S00671519-I1
10/11/2021
Filed — Alteration
FILED HEREWITH; RESIDENTIAL FIRE SPRINKLER PLAN
S00609561-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offWallace Avenue Construction08/08/2022
DOB NOWPlumbingSigned-offDuo Plumbing & Heating06/21/2022
DOB NOWSprinklersSigned-offDuo Plumbing & Heating06/17/2022
DOB NOWPlumbingSigned-offDuo Plumbing & Heating06/17/2022
DOB NOWFoundationPermit IssuedWallace Avenue Construction05/26/2022
1 project · most recent 08/07/2023
Gas Storm Water/Sanitary
FiledStatusContractorScope
08/07/2023Signed-offDuo Plumbing & HeatingGas, Storm, Water/Sanitary
1 project · most recent 04/03/2023
General Wiring
FiledStatusContractorScope
04/03/2023CompleteA. J. Caruso Electrical IGeneral Wiring
1 project · most recent 08/07/2023
Concrete Wood
FiledStatusContractorScope
08/07/2023Signed-offWallace Avenue ConstructionConcrete, Wood
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
06/27/2023Pass-Final CND-Occupancy InspectionPassView ↗
06/23/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/20/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/20/2023Pass-Final SP - Up to 3 Requested FloorsPassView ↗
06/16/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/22/2023Pass-Final Curb Cut Non-Directive 14PassView ↗
11/14/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/24/2022Pass-Final PL - UndergroundPassView ↗
07/12/2022Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 31
DateRequirementInspectorRole
08/07/2023Air barrier — testing WILLIAM DURDEN, P.E.energy_progress
08/07/2023Interior lighting powerWILLIAM DURDEN, P.E.energy_progress
08/07/2023Fenestration areasWILLIAM DURDEN, P.E.energy_progress
08/07/2023Concrete - Cast-In-PlaceWILLIAM DURDEN, P.E.special
08/07/2023Fire-Resistant Penetrations and JointsWILLIAM DURDEN, P.E.special
08/07/2023Mechanical SystemsWILLIAM DURDEN, P.E.special
08/07/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationWILLIAM DURDEN, P.E.special
08/07/2023Subgrade InspectionsWILLIAM DURDEN, P.E.special
08/07/2023Subsurface Investigations (Borings/Test Pits)WILLIAM DURDEN, P.E.special
08/07/2023Energy Code Compliance InspectionsWILLIAM DURDEN, P.E.progress
08/07/2023FinalWILLIAM DURDEN, P.E.progress
08/07/2023Fire-Resistance Rated ConstructionWILLIAM DURDEN, P.E.progress
08/07/2023Footing and FoundationWILLIAM DURDEN, P.E.progress
08/07/2023Structural Wood FrameWILLIAM DURDEN, P.E.progress
08/07/2023Insulation placement and R valuesWILLIAM DURDEN, P.E.energy_progress
08/07/2023Fenestration and door U-factor and product ratingsWILLIAM DURDEN, P.E.energy_progress
08/07/2023HVAC-R and service water heating system controlsWILLIAM DURDEN, P.E.energy_progress
08/07/2023Ventilation and air distribution systemWILLIAM DURDEN, P.E.energy_progress
08/07/2023Duct leakage testing, insulation and designWILLIAM DURDEN, P.E.energy_progress
08/07/2023Protection of exposed foundation insulationWILLIAM DURDEN, P.E.energy_progress
08/07/2023Permanent certificateWILLIAM DURDEN, P.E.energy_progress
08/07/2023HVAC-R and service water piping design and insulationWILLIAM DURDEN, P.E.energy_progress
08/07/2023Fenestration air leakageWILLIAM DURDEN, P.E.energy_progress
08/07/2023HVAC-R and service water heating equipmentWILLIAM DURDEN, P.E.energy_progress
08/07/2023MeteringWILLIAM DURDEN, P.E.energy_progress
Latest 25 of 31.
▾Documents — 58 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/24/2026S00609561-I1Request digital key ↗
08/24/2026S00609561-P2Request digital key ↗
08/24/2026S00609561-P1Request digital key ↗
Showing 3 of 9 on file for this type
▸Zoning, Tax Lot & Property Records9
▸DOB NOWZD1: DOB Zoning Diagram3
08/23/2026S00671519-P3Open ↗
08/15/2026S00671519-I1Open ↗
08/13/2026S00671519-P5Open ↗
▸DOB NOWZoning Exhibit form (1-5)3
08/23/2026S00671519-P3Open ↗
08/15/2026S00671519-I1Open ↗
08/13/2026S00671519-P5Open ↗
▸DOB NOWRestrictive Declaration/Easement 12
08/15/2026S00671519-I1Open ↗
08/13/2026S00671519-P5Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S00671519-I1Open ↗
▸Seals & Professional Certifications15
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/24/2026S00609561-P2Open ↗
08/24/2026S00609561-P1Open ↗
08/24/2026S00609561-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/24/2026S00671519-P5Open ↗
08/24/2026S00671519-P5Open ↗
08/23/2026S00609561-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
08/24/2026S00671519-P5Open ↗
08/24/2026S00671519-P5Open ↗
▸Trade Schedules & Equipment3
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/23/2026S00671519-P3Open ↗
08/15/2026S00671519-I1Open ↗
08/13/2026S00671519-P5Open ↗
▸Safety & Tenant Protection6
▸DOB NOWStreet Tree Checklist3
08/23/2026S00671519-P3Open ↗
08/15/2026S00671519-I1Open ↗
08/13/2026S00671519-P5Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026S00671519-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026S00671519-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026S00671519-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026S00671519-I1Open ↗
▸Inspections & Test Reports5
▸DOB NOWSOIL REPORT3
08/23/2026S00671519-P3Open ↗
08/15/2026S00671519-I1Open ↗
08/13/2026S00671519-P5Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026S00671519-I1Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026S00671519-I1Open ↗
▸Other Documents10
▸DOB NOWSite Survey: Initial3
08/15/2026S00671519-I1Open ↗
08/13/2026S00671519-P5Open ↗
08/13/2026S00671519-P3Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/23/2026S00671519-P3Open ↗
08/15/2026S00671519-I1Open ↗
08/13/2026S00671519-P5Open ↗
▸DOB NOWProperty Ownership Certification3
08/23/2026S00671519-P3Open ↗
08/15/2026S00671519-I1Open ↗
08/13/2026S00671519-P5Open ↗
▸DOB NOWFinal Survey1
08/13/2026S00671519-I1Open ↗