2 Open Violations 0 unresolved · 2 paperwork only▸
ECB01/07/2025ATOI OBSERVED EXCAVATION OF APPROX 25-30 TOTAL LINEAR FT OF EARTH ADJACENT TO EXPO-1&2 FOUNDATION PERIMETER WITH BELOW GRADE FOUNDATION EXPOSED. PARTIALLY COMPLETE CMU BLOCK/REBAR RETAINING WALL/STRUCTURAL SUPPNothing owed — awaiting certificate of correction
ECB01/07/2025EXTERIOR 1ST FLR DECK & OVERHEAD STRUCTURE @ EXPO-1&2 IN STATE OF DISREPAIR-PARTIALLY DEMOLISHED-STRUCTURALLY COMPROMISED-POTENTIAL COLLAPSE/FALL HAZARDS. OVERHEAD STRUCTURE MISSING VERTICAL LOAD BEARING SUPPORNothing owed — awaiting certificate of correction
Two stories - detached, small or mid-size · 12,084 sf lot · 0.17 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.