DOB11/14/2025VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
DOB09/23/2024VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
DOB04/25/2023VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION
DOB11/08/2019VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
DOB02/07/2000V-DOB VIOLATION - ACTIVE
ECB05/23/2012WORK DOES NOT CONFORM TO APPROVED PLANS OR DOCUMENTS JOB #'S 500445011PERMITTED 2-12-02 DOES NOT INDICATE MEZZANINE STRUCTURES AT REAR ON APPROVED PLAN NO DIMENSIONS/SIZES NOTED: ( ) DOES NOT INDICATENothing owed — awaiting certificate of correction
ECB03/18/2009FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER. NOTE: AT LEFT REAR OF BLDG I OBSERVED A ROLL DOWN GATE FUSIBLE LINK (FIRE DOOR) NOT WORKING APPEAR TO BE BROKEN IN THE OPEN POSITION (OFF TRACK) IN THE OPENINGNothing owed — awaiting certificate of correction
ECB03/18/2001BUILDING OCCUPIED CONTRARY TO CERTIFICATE OF OCCUPANCY.IN THAT BLDG IS OCCUPIED AS A CABANIT AND AWNING MANUFACTURING PLANT.THE SECOND SECTION IS ALSO OCCUPIED AS A DOOR AND MANUFACTURING PLANT (ALL UNDER USE GNothing owed — awaiting certificate of correction