← Back
Two stories - detached, small or mid-size
154 POTTER AVENUE
STATEN ISLAND · Westerleigh-Castleton Corners · BIN 5009281
💬 Discuss this project
1925Year Built
2.5Stories
A1Building Class
R2Zoning
1,300 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · 4,000 sf lot · 0.33 FAR built · Flood zone X
Locations of Work
Architecture
Roof1p · 1 filing · 8 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GREEN RIVER ENVIRONMENTAL ENGINEERI102/26/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NY State Solar LLC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NY SOLAR ELECTRICAL LLCElectrical103/22/2026
NYSS LLCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
GREEN RIVER ENVIRONMENTAL7841102/26/2025
Building Lifecycle
All (9)Filed (1)Permit Issued (1)Signed Off (1)Violation (1)Special Inspection (5)
06/16/2025
Signed off — Alteration
INSTALLATION OF PHOTOVOLTAIC SOLAR ARRAY ON EXISTING ROOF SYSTEM AS PER PLANS.
S01186521-I1
03/11/2025
Permit issued — Solar
S01186521-I1-SL
02/26/2025
Filed — Alteration
INSTALLATION OF PHOTOVOLTAIC SOLAR ARRAY ON EXISTING ROOF SYSTEM AS PER PLANS.
S01186521-I1
02/25/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ROBERT MASONE
02/25/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
ROBERT MASONE
02/25/2025
Special inspection requirement — Energy Code Compliance Inspections
ROBERT MASONE
02/25/2025
Special inspection requirement — Final
ROBERT MASONE
02/25/2025
Special inspection requirement — Air barrier - visual inspection
ROBERT MASONE
06/17/2003
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offNYSS LLC03/11/2025
BISOTISSUEDN/A10/01/2003
2 projects · most recent 02/25/2025
FiledStatusContractorScope
02/25/2025CompleteNY SOLAR ELECTRICAL LLC—
03/24/2019CompleteULTIMATE ELECTL CONTG INC1 meters
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
02/25/2025Fire-Resistant Penetrations and JointsROBERT MASONEspecial
02/25/2025Structural Stability – Alterations of existing buildingsROBERT MASONEspecial
02/25/2025Energy Code Compliance InspectionsROBERT MASONEprogress
02/25/2025FinalROBERT MASONEprogress
02/25/2025Air barrier - visual inspectionROBERT MASONEenergy_progress
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/20/2026S01186521-I1Request digital key ↗
▸Seals & Professional Certifications5
▸DOB NOWProgress Inspector Seal & Signature3
08/31/2026S01186521-I1Open ↗
08/31/2026S01186521-I1Open ↗
08/31/2026S01186521-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/20/2026S01186521-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/31/2026S01186521-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/20/2026S01186521-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026S01186521-I1Open ↗