Miscellaneous two family
154 WYTHE AVENUE
BROOKLYN · BIN 3061878
💬 Discuss this project
1899Year Built
3Stories
B9Building Class
M1-2/R6BZoning
1,920 sfGross Floor Area
2Units
Miscellaneous two family · 1,100 sf lot · 1.75 FAR built · Flood zone X
Locations of Work
ArchitectureStructural
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 11p · 1 filing · 8 docs
Cellar1 filing · 8 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/15/2021$2.9M—ACARA REALTY HOLDINGS LLC → THE PJC-WYTHE TRUST$1,526/sf building
06/12/2014$3.0M—Private party → ACARA REALTY HOLDINGS LLC$1,536/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Keystone Structural Group110/18/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Distinct Enterprises203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GstructionGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Alan Margolin & Associates423110/18/2021
Building Lifecycle
12/17/2021
Signed off — Alteration
Install new steel beam on steel pipe columns on new cast-in-place concrete footings with partial replacement of concrete slab at Cellar floor, to support exist. first floor framing above it. No change to exist. use, occupancy, egress, or floor area.
B00609655-I1
10/28/2021
Permit issued — General Construction
B00609655-I1-GC-CX
10/18/2021
Filed — Alteration
Install new steel beam on steel pipe columns on new cast-in-place concrete footings with partial replacement of concrete slab at Cellar floor, to support exist. first floor framing above it. No change to exist. use, occupancy, egress, or floor area.
B00609655-I1
10/14/2021
Special inspection requirement — Subgrade Inspections
Young Suh
10/14/2021
Special inspection requirement — Structural Steel - High Strength Bolting
Young Suh
11 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offGstruction10/28/2021
BISPLISSUEDPaul Quinn Plumbing & Heating02/03/2005
BISMHISSUEDPilaster Cabinets12/13/2004
1 project · most recent 01/08/2020
General Wiring
FiledStatusContractorScope
01/08/2020Permit IssuedJoseph Weinstein ElectricGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
10/14/2021Subgrade InspectionsYoung Suhspecial
10/14/2021Structural Steel - High Strength BoltingYoung Suhspecial
10/14/2021Structural Steel - WeldingYoung Suhspecial
10/14/2021Post-installed AnchorsYoung Suhspecial
10/14/2021Concrete - Cast-In-PlaceYoung Suhspecial
10/11/2021Structural Stability – Alterations of existing buildingsYoung Suhspecial
10/11/2021Structural Steel - DetailsYoung Suhspecial
10/11/2021FinalYoung Suhprogress