← Back
Multi-story retail building (2+)
1540 CONEY ISLAND AVENUE
BROOKLYN · Mapleton-Midwood (West) · BIN 3171984
💬 Discuss this project
1931Year Built
2Stories
K2Building Class
C8-2Zoning
3,200 sfGross Floor Area
6Units
6 Open Violations 5 unresolved · 1 paperwork only ▸FDNY Report ↗
Multi-story retail building (2+) · Owner of record: AVE. L LLC · 2,000 sf lot · 1.6 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Permit Issued — active, not yet Signed-off
Roof2p · 1 filing · 20 docs
Floor 1Under Construction30p · 3 filings · 20 docs
CellarUnder Construction33p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DELI LLC403/21/2026
AVE L LLC203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CHUN ENGINEERING CONSULTANT PLLC702/23/2026
M.INT'L ENGINEERING PLLC504/18/2024
ADAM TADDONIO PE108/12/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CAVALRY2203/21/2026
CAVALRY MANAGEMENT403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CAVALRY LLCGeneral Contractor607/08/2026
PIPESTYLISTS, INCPlumbing307/08/2026
SILVER, HUGHElectrical203/21/2026
TOUEY, CHRISTOPHERElectrical203/21/2026
SITRUK, MAURICEElectrical203/21/2026
METAL CRAFTS BY N BARSILYElectrical203/21/2026
ABRAHAM POLLElectrical103/21/2026
AMC PLBG, HTG & CLNG, INCPlumbing107/08/2026
BENJAMIN DREBINElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CHUN ENGINEERING CONSULTA9605402/23/2026
M. INT'L ENGINEERING PLLC3129802/06/2025
AR-TECH ENGINEERING, P.C.6659108/12/2021
Building Lifecycle
All (138)Filed (13)Permit Issued (10)Signed Off (2)Violation (60)Inspection (7)Objection (16)Special Inspection (30)
05/07/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
05/07/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/07/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
05/05/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/21/2026
Permit issued — Plumbing
B00546816-I1-PL
03/30/2026
Signed off — Alteration
MECHANICAL FILING CONJUNCTION WITH ALT II #B00546809. 1 BOILER TO BE REMOVED. 2NEW SPLIT SYSTEMS, 1 NEW HWH, 2 NEW KITCHENHOODS TO BE INSTALLED. ALL NEW FIXTURES TOCONNECT TO EXISTING EXHAUST SYSTEM AND FANS. ADDING FAI FOR THE BOILER FOR VIOLATIONS
B00546846-I1
02/27/2026
Special inspection requirement — Energy Code Compliance Inspections
JAMES CHUN
02/27/2026
Special inspection requirement — Maintenance information
JAMES CHUN
02/27/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JAMES CHUN
02/27/2026
Special inspection requirement — Post-installed Anchors
JAMES CHUN
02/27/2026
Special inspection requirement — HVAC-R and service water heating equipment
JAMES CHUN
02/27/2026
Special inspection requirement — HVAC-R and service water heating system controls
JAMES CHUN
02/27/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
NANIK MASSAND
02/23/2026
Filed — Alteration
PLUMBING FILING IN CONJUNCTION WITH ALT2 APPLICATION B00546809. NEW FIXTURES TO CONNECTTO EXISTING WATER, GAS, AND SANITARY SYSTEM., NO NEW STORM LINES PROPOSED. 1 NEW HWH AND 2 NEW FURNACES PROPOSED AND NEW OVEN PROPOSED. ADDRESSING VIOLATIONS
B00546816-P4
02/19/2026
Special inspection requirement — Energy Code Compliance Inspections
JAMES CHUN
02/19/2026
Special inspection requirement — HVAC-R and service water heating system controls
JAMES CHUN
02/19/2026
Special inspection requirement — Maintenance information
JAMES CHUN
02/19/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
NANIK MASSAND
02/19/2026
Special inspection requirement — Post-installed Anchors
JAMES CHUN
02/19/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JAMES CHUN
02/19/2026
Special inspection requirement — HVAC-R and service water heating equipment
JAMES CHUN
01/09/2026
Signed off — Alteration
APPLICATION FILED HEREWITH TO INSTALL COOKING AND MH EQUIPMENT ON 1ST FLOOR EXISITNG STORE, AND TO RESTORE CELLAR TO LEGAL CONDITION ADDRESSING VIOLATIONS. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B00546809-I1
10/28/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/17/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
10/14/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
02/06/2025
Filed — Alteration
APPLICATION FILED HEREWITH TO INSTALL COOKING AND MH EQUIPMENT ON 1ST FLOOR EXISITNG STORE, AND TO RESTORE CELLAR TO LEGAL CONDITION ADDRESSING VIOLATIONS. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B00546809-P5
02/06/2025
Special inspection requirement — Fire-Resistance Rated Construction
JAMES CHUN
02/06/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
JAMES CHUN
02/06/2025
Special inspection requirement — Fenestration air leakage
JAMES CHUN
02/06/2025
Special inspection requirement — Energy Code Compliance Inspections
JAMES CHUN
02/06/2025
Special inspection requirement — Insulation placement and R values
JAMES CHUN
02/06/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JAMES CHUN
02/06/2025
Special inspection requirement — Final
Cloud Lee
02/06/2025
Special inspection requirement — Fenestration areas
JAMES CHUN
02/05/2025
Special inspection requirement — Fenestration areas
NANIK MASSAND
02/05/2025
Special inspection requirement — Final
NANIK MASSAND
02/05/2025
Special inspection requirement — Insulation placement and R values
NANIK MASSAND
02/05/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
NANIK MASSAND
02/05/2025
Special inspection requirement — Fenestration air leakage
NANIK MASSAND
02/05/2025
Special inspection requirement — Fire-Resistance Rated Construction
NANIK MASSAND
02/05/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
NANIK MASSAND
02/05/2025
Special inspection requirement — Energy Code Compliance Inspections
NANIK MASSAND
01/13/2025
Permit issued — Mechanical Systems
B00546846-I1-MS
01/13/2025
Permit issued — General Construction
B00546809-I1-GC
11/13/2024
Objection resolved — Addressed
11/01/2024
Objection raised — Other
10/30/2024
Objection resolved — Addressed
10/29/2024
Objection raised — Fire_Protection
10/28/2024
Objection resolved — Addressed
10/15/2024
Filed — Alteration
APPLICATION FILED HEREWITH TO INSTALL COOKING AND MH EQUIPMENT ON 1ST FLOOR EXISITNG STORE, AND TO RESTORE CELLAR TO LEGAL CONDITION ADDRESSING VIOLATIONS. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B00546809-P4
10/15/2024
Objection raised — Other
09/30/2024
Filed — Alteration
PLUMBING FILING IN CONJUNCTION WITH ALT2 APPLICATION B00546809. NEW FIXTURES TO CONNECTTO EXISTING WATER, GAS, AND SANITARY SYSTEM., NO NEW STORM LINES PROPOSED. 1 NEW HWH AND 2 NEW FURNACES PROPOSED AND NEW OVEN PROPOSED. ADDRESSING VIOLATIONS
B00546816-P3
05/15/2024
Objection resolved — Addressed
04/23/2024
Objection raised — Other
04/18/2024
Filed — Alteration
PLUMBING FILING IN CONJUNCTION WITH ALT2 APPLICATION B00546809. NEW FIXTURES TO CONNECTTO EXISTING WATER, GAS, AND SANITARY SYSTEM., NO NEW STORM LINES PROPOSED. 1 NEW HWH AND 2 NEW FURNACES PROPOSED AND NEW OVEN PROPOSED. ADDRESSING VIOLATIONS
B00546816-P2
04/17/2024
Objection resolved — Addressed
04/11/2024
Objection raised — Other
04/10/2024
Objection resolved — Addressed
04/08/2024
Filed — Alteration
APPLICATION FILED HEREWITH TO INSTALL COOKING AND MH EQUIPMENT ON 1ST FLOOR EXISITNG STORE, AND TO RESTORE CELLAR TO LEGAL CONDITION ADDRESSING VIOLATIONS. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B00546809-P3
04/08/2024
Objection raised — Other
Latest 60 of 138 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedAMC PLBG, HTG & CLNG, INC04/21/2026
DOB NOWMechanical SystemsSigned-offCAVALRY LLC01/13/2025
DOB NOWGeneral ConstructionSigned-offCAVALRY LLC01/13/2025
DOB NOWPlumbingPermit IssuedT & T PLUMBING INC04/05/2024
DOB NOWGeneral ConstructionSigned-offCAVALRY LLC02/09/2023
DOB NOWMechanical SystemsSigned-offCAVALRY LLC02/09/2023
DOB NOWPlumbingPermit IssuedT & T PLUMBING INC12/06/2022
DOB NOWMechanical SystemsSigned-offCAVALRY LLC12/10/2021
DOB NOWPlumbingPermit IssuedT & T PLUMBING INC12/09/2021
DOB NOWGeneral ConstructionSigned-offCAVALRY LLC10/20/2021
BISBLISSUEDTW PLUMBING & HEATING INC03/04/2016
BISPLISSUEDTW PLUMBING & HEATING INC03/04/2016
BISFPISSUEDFIRE COMMAND CO, INC03/03/2016
BISPLISSUEDTW PLUMBING & HEATING INC03/03/2016
BISPLISSUEDDPH PLUMBING & HTG CORP11/19/2013
BISOTISSUEDNEW J.D. GEN. CONSTR. INC09/10/2013
1 project · most recent 02/23/2026
Gas Water/Sanitary
FiledStatusContractorScope
02/23/2026Permit IssuedAMC PLBG, HTG & CLNG, INCGas, Water/Sanitary
2 projects · most recent 12/10/2025
General Wiring
FiledStatusContractorScope
12/10/2025CompleteCURRENT POWER ELECTRIC5 meters
02/19/2025Permit IssuedACCURATE ELEC'L CORP.General Wiring
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
05/07/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/07/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/07/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
05/05/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/28/2025Pass-Final CND-Occupancy InspectionPassView ↗
10/17/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/14/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 61
DateRequirementInspectorRole
02/27/2026Maintenance informationJAMES CHUNenergy_progress
02/27/2026Fire-Resistant Penetrations and JointsJAMES CHUNspecial
02/27/2026Post-installed AnchorsJAMES CHUNspecial
02/27/2026Energy Code Compliance InspectionsJAMES CHUNprogress
02/27/2026HVAC-R and service water heating equipmentJAMES CHUNenergy_progress
02/27/2026HVAC-R and service water piping design and insulationNANIK MASSANDenergy_progress
02/27/2026HVAC-R and service water heating system controlsJAMES CHUNenergy_progress
02/19/2026HVAC-R and service water heating system controlsJAMES CHUNenergy_progress
02/19/2026Fire-Resistant Penetrations and JointsJAMES CHUNspecial
02/19/2026Post-installed AnchorsJAMES CHUNspecial
02/19/2026Energy Code Compliance InspectionsJAMES CHUNprogress
02/19/2026HVAC-R and service water piping design and insulationNANIK MASSANDenergy_progress
02/19/2026Maintenance informationJAMES CHUNenergy_progress
02/19/2026HVAC-R and service water heating equipmentJAMES CHUNenergy_progress
02/06/2025Fire-Resistant Penetrations and JointsJAMES CHUNspecial
02/06/2025Fenestration air leakageJAMES CHUNenergy_progress
02/06/2025Fenestration areasJAMES CHUNenergy_progress
02/06/2025Insulation placement and R valuesJAMES CHUNenergy_progress
02/06/2025Fenestration and door U-factor and product ratingsJAMES CHUNenergy_progress
02/06/2025Fire-Resistance Rated ConstructionJAMES CHUNprogress
02/06/2025Energy Code Compliance InspectionsJAMES CHUNprogress
02/06/2025FinalCloud Leeprogress
02/05/2025Fenestration and door U-factor and product ratingsNANIK MASSANDenergy_progress
02/05/2025Energy Code Compliance InspectionsNANIK MASSANDprogress
02/05/2025FinalNANIK MASSANDprogress
Latest 25 of 61.
▾Documents — 202 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch13
09/01/2026B00546809-P5Request digital key ↗
09/01/2026B00546809-P4Request digital key ↗
09/01/2026B00546809-I1Request digital key ↗
Showing 3 of 13 on file for this type
▸Applications & Permits33
▸BISPLAN / WORK APPROVAL APPLICATION22
05/02/2023321276891Open ↗
01/13/2022320929885Open ↗
01/13/2022320787029Open ↗
Showing 3 of 22 on file for this type
▸BISWORK PERMIT APPLICATION11
05/12/2016321324884Open ↗
05/12/2016321324884Open ↗
03/09/2016320787029Open ↗
Showing 3 of 11 on file for this type
▸Zoning, Tax Lot & Property Records1
▸BISZONING DIAGRAM1
12/20/2019321682372Open ↗
▸Seals & Professional Certifications72
▸DOB NOWProgress Inspector Seal & Signature31
09/01/2026B00546816-I1Open ↗
09/01/2026B00546816-I1Open ↗
09/01/2026B00546816-I1Open ↗
Showing 3 of 31 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature13
09/01/2026B00546809-I1Open ↗
09/01/2026B00546809-P5Open ↗
09/01/2026B00546809-P3Open ↗
Showing 3 of 13 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION12
01/16/2019321827341Open ↗
01/16/2019321827341Open ↗
01/16/2019321682372Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/01/2026B00546816-I1Open ↗
09/01/2026B00546809-P1Open ↗
08/31/2026B00546816-P1Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
04/15/2016321324884Open ↗
11/24/2015321276891Open ↗
06/06/2014320929885Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
04/15/2016321324884Open ↗
11/24/2015321276891Open ↗
06/06/2014320929885Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
07/11/2013320787029Open ↗
▸Trade Schedules & Equipment14
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE5
01/16/2019321827341Open ↗
04/15/2016321324884Open ↗
04/08/2016320787029Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT5
01/29/2016320929885Open ↗
04/03/2015320929885Open ↗
07/24/2014320929885Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE B - PLUMBING3
06/11/2014320787029Open ↗
07/11/2013320787029Open ↗
07/17/2009320053767Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
10/27/2016321272412Open ↗
▸Safety & Tenant Protection1
▸BISTenant Protection Plan and Notes1
01/16/2019321827341Open ↗
▸Environmental & Asbestos19
▸DOB NOWDEP ACP-5: Asbestos Assessment Report13
09/01/2026B00546809-P5Open ↗
09/01/2026B00546809-P1Open ↗
09/01/2026B00546809-P4Open ↗
Showing 3 of 13 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
12/18/2019321682372Open ↗
11/24/2015321276891Open ↗
11/17/2015321272412Open ↗
Showing 3 of 4 on file for this type
▸BISTHIS IS NOT AN ASBESTOS PROJECT2
07/17/2009320053767Open ↗
07/17/2009320053767Open ↗
▸Energy Compliance6
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
01/16/2019321827341Open ↗
04/15/2016321324884Open ↗
04/15/2016321324884Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.2
09/01/2026B00546809-I1Open ↗
08/28/2026B00546846-I1Open ↗
▸Inspections & Test Reports2
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
01/24/2022320787029Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY1
01/24/2022320929885Open ↗
▸Approvals, Objections & Sign-offs15
▸BISSCHEDULE A - OCCUPANCY / USE4
12/26/2019321682372Open ↗
04/11/2019321682372Open ↗
01/16/2019321682372Open ↗
Showing 3 of 4 on file for this type
▸BISADMINISTRATIVE OBJECTIONS4
11/24/2015321276891Open ↗
06/06/2014320929885Open ↗
07/11/2013320787029Open ↗
Showing 3 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
01/27/2022320787029Open ↗
01/25/2022320929885Open ↗
10/27/2016321272412Open ↗
▸BISFINAL2
01/24/2022320929885Open ↗
01/24/2022320787029Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
04/01/2016320787029Open ↗
03/23/2016320929885Open ↗
▸Cost, Insurance & Ownership10
▸BISCOST AFFIDAVIT8
01/16/2019321827341Open ↗
01/16/2019321682372Open ↗
10/27/2016321272412Open ↗
Showing 3 of 8 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
01/25/2022320787029Open ↗
01/24/2022320929885Open ↗
▸Filing & Intake Forms15
▸BISEFILING COVER SHEET7
01/16/2019321827341Open ↗
01/16/2019321682372Open ↗
04/15/2016321324884Open ↗
Showing 3 of 7 on file for this type
▸BISADDITIONAL INFORMATION7
06/13/2016321324884Open ↗
04/20/2016320929885Open ↗
04/13/2016320787029Open ↗
Showing 3 of 7 on file for this type
▸BISeFiling Job Application Cover Sheet1
07/17/2009320053767Open ↗
▸Other Documents1
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
05/22/2016320787029Open ↗