← Back
BuildNYC
Three families
1541 56TH STREET
BROOKLYN · Borough Park · BIN 3130655
💬 Discuss this project
1975Year Built
3Stories
C0Building Class
R6Zoning
3,720 sfGross Floor Area
3Units
1 Active Violation 2 old, status unconfirmed ▸FDNY Report ↗
Three families · Owner of record: 1541 LLC · 2,003 sf lot · 1.86 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire Protection
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofUnder Construction19p · 1 filing · 20 docs
Floor 3Under Construction86p · 1 filing · 20 docs
Floor 2Under Construction82p · 1 filing · 20 docs
Floor 1Under Construction80p · 1 filing · 20 docs
CellarUnder Construction1p · 1 filing · 20 docs
Site & exteriorPlywood fence constructionUnder Construction2p · 1 filing · 2 docs
Filed — no permit issued8p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1541 LLC1203/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/15/2020$1.6M—— → —$430/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Engineering Professional Service P306/12/2026
Eyal Levitt Architect303/09/2026
Mje Professional Services112/08/2025
R & S Associates412/27/2024
Mey Associates110/18/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Eretz Builders Assistance203/21/2026
Exspeedium1603/21/2026
SNR Expediting Design203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Kaieteur ConstructionGeneral Contractor907/08/2026
YC DevelopersScaffold603/21/2026
Kaieteur ConstructionScaffold205/29/2026
Creative Plumbing inPlumbing107/08/2026
KCM Plumbing & Heating CoPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
IP Concrete Testing and I6252806/12/2026
NKM Engineering6244103/09/2026
Building Lifecycle
All (152)Filed (12)Permit Issued (14)Violation (14)Inspection (5)Objection (77)Special Inspection (30)
09/15/2026
Objection raised — Fire_Protection
09/15/2026
Objection raised — Structural
09/15/2026
Objection raised — Scope
08/20/2026
Objection resolved — Resolved
08/20/2026
Objection resolved — Resolved
08/20/2026
Objection resolved — Resolved
08/20/2026
Objection resolved — Resolved
07/29/2026
Objection raised — Other
07/29/2026
Objection raised — Other
07/29/2026
Objection raised — Scope
07/29/2026
Objection raised — Scope
07/09/2026
Objection resolved — Addressed
06/26/2026
Objection raised — Scope
06/12/2026
Filed — Alteration CO
PLUMBING PLANS FILED HEREIN IS IN COMPLIANCE WITH 2022 NYCECC AND 2022 NYC BUILDING CODES, AND IN CONJUNCTION WITH NYC DOB NOW JOB #: B00976213. PLUMBING SCOPE INCLUDES SANITARY PIPING, AND TYPICAL PLUMBING FIXTURES AS REQUIRED BY BC 403.1.
B00976213-P4
06/12/2026
Special inspection requirement — Fenestration air leakage
INDARDEO PARBHUNATH
06/12/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
INDARDEO PARBHUNATH
06/12/2026
Special inspection requirement — Maintenance information
INDARDEO PARBHUNATH
06/12/2026
Special inspection requirement — Air barrier - visual inspection
INDARDEO PARBHUNATH
06/12/2026
Special inspection requirement — Insulation placement and R values
INDARDEO PARBHUNATH
06/12/2026
Special inspection requirement — Interior lighting power
INDARDEO PARBHUNATH
06/12/2026
Special inspection requirement — Fenestration areas
INDARDEO PARBHUNATH
06/12/2026
Special inspection requirement — Permanent certificate
INDARDEO PARBHUNATH
06/12/2026
Special inspection requirement — Fire-Resistance Rated Construction
INDARDEO PARBHUNATH
06/12/2026
Special inspection requirement — Energy Code Compliance Inspections
INDARDEO PARBHUNATH
06/12/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
INDARDEO PARBHUNATH
05/27/2026
Permit issued — Construction Fence
B00949746-I1-FN
05/27/2026
Permit issued — Structural
B00976213-S3-ST
05/27/2026
Permit issued — Foundation
B00976213-S4-FO
05/27/2026
Permit issued — General Construction
B00976213-I1-GC
05/27/2026
Permit issued — Mechanical Systems
B00976213-S2-MS
05/20/2026
Violation issued (ECB, open)
Construction
03/24/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
03/24/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
03/16/2026
Permit issued — Plumbing
B00976213-S1-PL
03/09/2026
Filed — Alteration CO
PLUMBING PLANS FILED HEREIN IS IN COMPLIANCE WITH 2022 NYCECC AND 2022 NYC BUILDING CODES, AND IN CONJUNCTION WITH NYC DOB NOW JOB #: B00976213. PLUMBING SCOPE INCLUDES SANITARY PIPING, AND TYPICAL PLUMBING FIXTURES AS REQUIRED BY BC 403.1.
B00976213-S6
03/09/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
NARESH MAHANGU
03/09/2026
Special inspection requirement — Sprinkler Systems
NARESH MAHANGU
12/08/2025
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B01327421-I1
07/24/2025
Violation issued (ECB, closed)
Construction
06/25/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
06/25/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/25/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
06/17/2025
Permit issued — Plumbing
B00976213-S1-PL
05/09/2025
Permit issued — Mechanical Systems
B00976213-S2-MS
05/09/2025
Permit issued — Foundation
B00976213-S4-FO
05/09/2025
Permit issued — Structural
B00976213-S3-ST
05/09/2025
Permit issued — Construction Fence
B00949746-I1-FN
05/08/2025
Permit issued — General Construction
B00976213-I1-GC
03/05/2025
Special inspection requirement — Structural Steel - Welding
INDARDEO PARBHUNATH
03/05/2025
Special inspection requirement — Concrete - Cast-In-Place
INDARDEO PARBHUNATH
03/05/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
INDARDEO PARBHUNATH
03/05/2025
Special inspection requirement — Structural Steel - Details
INDARDEO PARBHUNATH
03/05/2025
Special inspection requirement — Demolition
INDARDEO PARBHUNATH
03/05/2025
Special inspection requirement — Post-installed Anchors
INDARDEO PARBHUNATH
03/05/2025
Special inspection requirement — Structural Cold-Formed Steel
INDARDEO PARBHUNATH
03/05/2025
Special inspection requirement — Final
NAVEEN KUMAR
03/05/2025
Special inspection requirement — Structural Steel - High Strength Bolting
INDARDEO PARBHUNATH
03/05/2025
Special inspection requirement — Masonry
INDARDEO PARBHUNATH
02/28/2025
Objection resolved — Addressed
02/14/2025
Special inspection requirement — Fenestration areas
INDARDEO PARBHUNATH
Latest 60 of 152 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FencePermit IssuedKaieteur Construction05/27/2026
DOB NOWStructuralPermit IssuedKaieteur Construction05/27/2026
DOB NOWFoundationPermit IssuedKaieteur Construction05/27/2026
DOB NOWGeneral ConstructionPermit IssuedKaieteur Construction05/27/2026
DOB NOWMechanical SystemsPermit IssuedKaieteur Construction05/27/2026
DOB NOWPlumbingPermit IssuedAB Plumbing03/16/2026
DOB NOWPlumbingPermit IssuedKCM Plumbing & Heating Co06/17/2025
DOB NOWMechanical SystemsPermit IssuedKaieteur Construction05/09/2025
DOB NOWFoundationPermit IssuedKaieteur Construction05/09/2025
DOB NOWStructuralPermit IssuedKaieteur Construction05/09/2025
DOB NOWConstruction FencePermit IssuedKaieteur Construction05/09/2025
DOB NOWGeneral ConstructionPermit IssuedKaieteur Construction05/08/2025
DOB NOWConstruction FencePermit IssuedYC Developers12/26/2024
DOB NOWConstruction FencePermit IssuedYC Developers12/12/2023
1 project · most recent 06/12/2026
Sprinkler System
FiledStatusContractorScope
06/12/2026——Sprinkler System
1 project · most recent 06/12/2026
Gas Water/Sanitary
FiledStatusContractorScope
06/12/2026Permit IssuedMetflow MechanicalGas, Water/Sanitary
2 projects · most recent 03/18/2026
General Wiring
FiledStatusContractorScope
03/18/2026Permit IssuedCurrent Power ElectricGeneral Wiring
11/15/2024Permit IssuedCYM Electrical Contractor—
1 project · most recent 06/12/2026
Steel Masonry
FiledStatusContractorScope
06/12/2026Permit IssuedKaieteur ConstructionSteel, Masonry
1 project · most recent 12/08/2025
Scaffold
FiledStatusContractorScope
12/08/2025——Scaffold
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
03/24/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
03/24/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
06/25/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/25/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/25/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 54
DateRequirementInspectorRole
06/12/2026Fenestration air leakageINDARDEO PARBHUNATHenergy_progress
06/12/2026Fenestration and door U-factor and product ratingsINDARDEO PARBHUNATHenergy_progress
06/12/2026Maintenance informationINDARDEO PARBHUNATHenergy_progress
06/12/2026Air barrier - visual inspectionINDARDEO PARBHUNATHenergy_progress
06/12/2026Insulation placement and R valuesINDARDEO PARBHUNATHenergy_progress
06/12/2026Interior lighting powerINDARDEO PARBHUNATHenergy_progress
06/12/2026Fenestration areasINDARDEO PARBHUNATHenergy_progress
06/12/2026Permanent certificateINDARDEO PARBHUNATHenergy_progress
06/12/2026Fire-Resistance Rated ConstructionINDARDEO PARBHUNATHprogress
06/12/2026Energy Code Compliance InspectionsINDARDEO PARBHUNATHprogress
06/12/2026Fire-Resistant Penetrations and JointsINDARDEO PARBHUNATHspecial
03/09/2026Fire-Resistant Penetrations and JointsNARESH MAHANGUspecial
03/09/2026Sprinkler SystemsNARESH MAHANGUspecial
03/05/2025Structural Steel - WeldingINDARDEO PARBHUNATHspecial
03/05/2025Concrete - Cast-In-PlaceINDARDEO PARBHUNATHspecial
03/05/2025Structural Stability – Alterations of existing buildingsINDARDEO PARBHUNATHspecial
03/05/2025Structural Steel - DetailsINDARDEO PARBHUNATHspecial
03/05/2025DemolitionINDARDEO PARBHUNATHspecial
03/05/2025Post-installed AnchorsINDARDEO PARBHUNATHspecial
03/05/2025Structural Cold-Formed SteelINDARDEO PARBHUNATHspecial
03/05/2025FinalNAVEEN KUMARprogress
03/05/2025Structural Steel - High Strength BoltingINDARDEO PARBHUNATHspecial
03/05/2025MasonryINDARDEO PARBHUNATHspecial
02/14/2025Fenestration areasINDARDEO PARBHUNATHenergy_progress
02/14/2025Fire-Resistance Rated ConstructionINDARDEO PARBHUNATHprogress
Latest 25 of 54.
▾Documents — 85 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch12
08/26/2026B00949746-I1Request digital key ↗
08/23/2026B00976213-P4Request digital key ↗
08/23/2026B00976213-S6Request digital key ↗
Showing 3 of 12 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00976213-I1Open ↗
▸Seals & Professional Certifications56
▸DOB NOWProgress Inspector Seal & Signature31
08/26/2026B00976213-P2Open ↗
08/26/2026B00976213-P2Open ↗
08/26/2026B00976213-P2Open ↗
Showing 3 of 31 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature13
08/26/2026B00976213-P2Open ↗
08/26/2026B00976213-P4Open ↗
08/24/2026B00976213-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature12
08/26/2026B00949746-I1Open ↗
08/23/2026B00976213-P4Open ↗
08/23/2026B00976213-S6Open ↗
Showing 3 of 12 on file for this type
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist3
08/23/2026B00976213-P2Open ↗
08/14/2026B00976213-P4Open ↗
08/14/2026B00976213-I1Open ↗
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
08/23/2026B00976213-S6Open ↗
08/23/2026B00976213-P3Open ↗
08/23/2026B00976213-P2Open ↗
Showing 3 of 10 on file for this type
▸Other Documents3
▸DOB NOWProperty Ownership Certification3
08/23/2026B00976213-P2Open ↗
08/14/2026B00976213-P4Open ↗
08/14/2026B00976213-I1Open ↗