← Back
Over six families without stores
1541 WHITE PLAINS ROAD
BRONX · Soundview-Bruckner-Bronx River · BIN 2028675
💬 Discuss this project
1928Year Built
5Stories
C1Building Class
R6Zoning
13,280 sfGross Floor Area
19Units
Rent Stabilized11 Open Violations ▸FDNY Report ↗
Over six families without stores · Owner of record: 1541 WPR LLC · 3,600 sf lot · 3.69 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1541 WPR LLC203/22/2026
76-78 WEST 170 STREET903/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/27/2023$2.1M—BAR MIL LLC → 1541 WPR LLC$158/sf building
10/23/2015$2.4M—1541 WHITE PLAINS ROAD, LLC → BAR MIL LLC$181/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MESZAROS ENGINEERING PLLC1310/10/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MESZAROS ENGINEERING PLLC2603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FORWARD MECHANICAL CORPGeneral Contractor403/21/2026
FORWARD MECHANICAL CORPPlumbing307/08/2026
MAYO, EUGENEElectrical103/21/2026
RICHARD ANGELORIElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MESZAROS ENGINEERING PLLC963710/10/2023
Building Lifecycle
All (113)Filed (13)Permit Issued (6)Violation (60)Inspection (4)Special Inspection (30)
08/14/2026
Violation issued (HPD, open)
B
08/14/2026
Violation issued (HPD, open)
B
08/14/2026
Violation issued (HPD, open)
C
08/14/2026
Violation issued (HPD, open)
A
08/14/2026
Violation issued (HPD, open)
B
08/14/2026
Violation issued (HPD, open)
B
06/21/2026
Violation issued (HPD, open)
A
06/21/2026
Violation issued (HPD, open)
A
06/21/2026
Violation issued (HPD, closed)
B
04/30/2026
Violation issued (HPD, closed)
A
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/23/2025
Violation issued (HPD, closed)
B
11/26/2024
Violation issued (HPD, open)
C
11/26/2024
Violation issued (HPD, open)
C
11/20/2024
Violation issued (HPD, closed)
C
11/20/2024
Violation issued (HPD, closed)
A
11/20/2024
Violation issued (HPD, closed)
A
11/20/2024
Violation issued (HPD, closed)
C
11/20/2024
Violation issued (HPD, closed)
C
09/19/2024
Violation issued (HPD, closed)
B
09/19/2024
Violation issued (HPD, closed)
B
08/13/2024
Violation issued (HPD, closed)
C
08/13/2024
Violation issued (HPD, closed)
B
08/13/2024
Violation issued (HPD, closed)
B
08/13/2024
Violation issued (HPD, closed)
A
08/13/2024
Violation issued (HPD, closed)
B
06/05/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/20/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/14/2023
Permit issued — Plumbing
X00523301-I1-PL
12/13/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/08/2023
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
10/11/2023
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
Christian Meszaros
10/11/2023
Special inspection requirement — Heating Systems
Christian Meszaros
10/10/2023
Filed — Alteration
REPLACEMENT OF NEW STEAM BOILER. NO CHANGE IN EGRESS OR OCCUPANCY.
X00523328-P3
10/10/2023
Special inspection requirement — Heating Systems
Christian Meszaros
10/10/2023
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
Christian Meszaros
09/26/2023
Special inspection requirement — Maintenance information
Christian Meszaros
09/26/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Christian Meszaros
09/26/2023
Special inspection requirement — HVAC-R and service water heating equipment
Christian Meszaros
09/26/2023
Special inspection requirement — Permanent certificate
Christian Meszaros
09/26/2023
Special inspection requirement — HVAC-R and service water heating system controls
Christian Meszaros
09/26/2023
Special inspection requirement — Energy Code Compliance Inspections
Christian Meszaros
09/25/2023
Filed — Alteration
INSTALLATION OF NEW HOT WATER HEATER AND NEW HOT WATER STORAGE TANK. NO CHANGE IN EGRESS OR OCCUPANCY.
X00523301-P2
09/25/2023
Filed — Alteration
REPLACEMENT OF NEW STEAM BOILER. NO CHANGE IN EGRESS OR OCCUPANCY.
X00523328-P2
09/25/2023
Special inspection requirement — Heating Systems
Christian Meszaros
09/25/2023
Special inspection requirement — Final
Christian Meszaros
09/25/2023
Special inspection requirement — Preliminary
Christian Meszaros
09/25/2023
Special inspection requirement — Mechanical Systems
Christian Meszaros
09/22/2023
Filed — Alteration
MECHANICAL PIPING TO BE PERFORMED IN CONJUNCTION WITH THE REPLACEMENT OF A NEW STEAM BOILER. NO CHANGE IN EGRESS OR OCCUPANCY.
X00419294-P2
09/22/2023
Filed — Alteration
INSTALLATION OF NEW DOUBLE WALL STAINLESS STEEL CHIMNEY AND GENERAL CONSTRUCTION IN CONJUNCTION WITH THE REPLACEMENT OF NEW STEAM BOILER, INSTALLATION OF NEW HOT WATER HEATER AND NEW HOT WATER STORAGE TANK. NO CHANGE IN EGRESS OR OCCUPANCY.
X00523258-P2
09/20/2023
Special inspection requirement — Preliminary
Christian Meszaros
09/20/2023
Special inspection requirement — Energy Code Compliance Inspections
Christian Meszaros
09/20/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Christian Meszaros
09/20/2023
Special inspection requirement — HVAC-R and service water heating equipment
Christian Meszaros
09/20/2023
Special inspection requirement — HVAC-R and service water heating system controls
Christian Meszaros
09/20/2023
Special inspection requirement — Permanent certificate
Christian Meszaros
09/20/2023
Special inspection requirement — Maintenance information
Christian Meszaros
09/20/2023
Special inspection requirement — Heating Systems
Christian Meszaros
09/20/2023
Special inspection requirement — Mechanical Systems
Christian Meszaros
09/20/2023
Special inspection requirement — Final
Christian Meszaros
Latest 60 of 113 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedFORWARD HEATING CORP12/14/2023
DOB NOWMechanical SystemsPermit IssuedFORWARD MECHANICAL CORP07/12/2023
DOB NOWBoiler EquipmentSigned-offRANSHAW PLBG & HTG LLC06/28/2023
DOB NOWPlumbingPermit IssuedFORWARD HEATING CORP08/02/2022
DOB NOWPlumbingPermit IssuedFORWARD HEATING CORP07/09/2021
DOB NOWGeneral ConstructionPermit IssuedFORWARD MECHANICAL CORP07/09/2021
BISBLISSUEDSCHILDWACHTER & SONS10/21/2004
BISBLISSUEDWARD PLUMBING CORP05/16/2002
BISPLISSUEDWARD PLUMBING CORP05/16/2002
1 project · most recent 09/25/2023
Gas Water/Sanitary
FiledStatusContractorScope
09/25/2023Permit IssuedFORWARD MECHANICAL CORPGas, Water/Sanitary
1 project · most recent 09/27/2023
General Wiring
FiledStatusContractorScope
09/27/2023Permit IssuedJ.A. ELEC INC D/B/A MIDWAGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
06/05/2024Pass-Final CND-Occupancy InspectionPassView ↗
12/20/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/13/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/08/2023Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 43
DateRequirementInspectorRole
10/11/2023Fuel-Oil Storage and Fuel-Oil Piping SystemsChristian Meszarosspecial
10/11/2023Heating SystemsChristian Meszarosspecial
10/10/2023Heating SystemsChristian Meszarosspecial
10/10/2023Fuel-Oil Storage and Fuel-Oil Piping SystemsChristian Meszarosspecial
09/26/2023Maintenance informationChristian Meszarosenergy_progress
09/26/2023HVAC-R and service water piping design and insulationChristian Meszarosenergy_progress
09/26/2023HVAC-R and service water heating equipmentChristian Meszarosenergy_progress
09/26/2023Permanent certificateChristian Meszarosenergy_progress
09/26/2023HVAC-R and service water heating system controlsChristian Meszarosenergy_progress
09/26/2023Energy Code Compliance InspectionsChristian Meszarosprogress
09/25/2023Heating SystemsChristian Meszarosspecial
09/25/2023FinalChristian Meszarosprogress
09/25/2023PreliminaryChristian Meszarosprogress
09/25/2023Mechanical SystemsChristian Meszarosspecial
09/20/2023PreliminaryChristian Meszarosprogress
09/20/2023Energy Code Compliance InspectionsChristian Meszarosprogress
09/20/2023HVAC-R and service water piping design and insulationChristian Meszarosenergy_progress
09/20/2023HVAC-R and service water heating equipmentChristian Meszarosenergy_progress
09/20/2023HVAC-R and service water heating system controlsChristian Meszarosenergy_progress
09/20/2023Permanent certificateChristian Meszarosenergy_progress
09/20/2023Maintenance informationChristian Meszarosenergy_progress
09/20/2023Heating SystemsChristian Meszarosspecial
09/20/2023Mechanical SystemsChristian Meszarosspecial
09/20/2023FinalChristian Meszarosprogress
09/20/2023Fuel-Oil Storage and Fuel-Oil Piping SystemsChristian Meszarosspecial
Latest 25 of 43.
▾Documents — 60 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch10
08/25/2026X00523328-P2Request digital key ↗
08/25/2026X00523328-P3Request digital key ↗
08/25/2026X00523328-P1Request digital key ↗
Showing 3 of 10 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems3
08/23/2026X00419294-P1Request digital key ↗
08/23/2026X00419294-I1Request digital key ↗
08/15/2026X00419294-P2Request digital key ↗
▸Seals & Professional Certifications31
▸DOB NOWDPL-1: Design Professional Seal & Signature13
08/25/2026X00523328-I1Open ↗
08/25/2026X00523328-P3Open ↗
08/25/2026X00523328-P2Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWProgress Inspector Seal & Signature10
09/28/2026X00419294-P1Open ↗
09/01/2026X00523258-P1Open ↗
08/29/2026X00523301-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/28/2026X00419294-P1Open ↗
09/23/2026X00523328-I1Open ↗
09/01/2026X00523258-P1Open ↗
Showing 3 of 8 on file for this type
▸Safety & Tenant Protection3
▸DOB NOWTenant Protection Plan3
08/13/2026X00419294-P2Open ↗
08/13/2026X00419294-P1Open ↗
08/13/2026X00419294-I1Open ↗
▸Environmental & Asbestos13
▸DOB NOWDEP ACP-5: Asbestos Assessment Report13
08/25/2026X00523328-P3Open ↗
08/25/2026X00523328-P2Open ↗
08/25/2026X00523328-P1Open ↗
Showing 3 of 13 on file for this type