1543 2 AVENUE
MANHATTAN · Upper East Side-Yorkville · BIN 1048532
💬 Discuss this project
1959Year Built
12Stories
D6Building Class
C1-9Zoning
123,524 sfGross Floor Area
117Units
LL97 CoveredRent Stabilized
Elevator apt, fireproof with stores · Owner of record: 245 EAST 80TH STREET IM, LLC · 12,954 sf lot · 9.54 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalPlumbing
Permit Issued — active, not yet Signed-off
Roof2p · 1 filing · 4 docs
Floor 116p · 1 filing · 7 docs
Floor 10Under Construction1 filing · 1 doc
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 34p · 2 filings · 16 docs
Floor 2
Floor 11p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
245 EAST 80TH STREET IM, LLC16309/18/2026
A AMP E REAL ESTATE109/09/2026
PREPARER407/08/2026
JW DEVELOPMENT HOLDINGS L103/22/2026
245 E 80ST LLC103/22/2026
ROCK GROUP NY103/22/2026
ENERGY BLDG CON.INC103/22/2026
LENHILL REALTY1903/22/2026
TO OWNER OF 245 EAST 80TH203/22/2026
BEFNER MGMT. CORP203/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SQ. ARCH, LLC4802209/04/2026
HUAN DESIGN INC7669108/25/2026
SOCOTEC ENGINEERING4983108/25/2026
WRG ENGINEERING, P.C.4403505/11/2026
ELEVATED ENGINEERING PLLC3692206/18/2025
CROSSCHECK INSPECTION SER544301/31/2024
NKO ARCHITECT PC6811106/08/2021
Building Lifecycle
All (32)Facade (FISP) (12)Objection (20)
07/15/2026
Objection resolved — Resolved
07/09/2026
Objection resolved — Resolved
07/09/2026
Objection resolved — Resolved
05/14/2026
Objection raised — Other
05/14/2026
Objection raised — Cost
05/14/2026
Objection raised — Scope
07/10/2025
Objection resolved — Addressed
07/10/2025
Objection resolved — Addressed
07/10/2025
Objection resolved — Addressed
07/08/2025
Objection raised — Fire_Protection
07/08/2025
Objection raised — Inspections
07/08/2025
Objection raised — Scope
06/21/2024
Cycle 9 facade report signed — SWARMP
03/05/2024
Cycle 9 facade report submitted
02/06/2024
Cycle 9 facade inspection completed
08/24/2022
Objection raised — Zoning
08/24/2022
Objection resolved — Addressed
08/24/2022
Objection raised — Zoning
08/24/2022
Objection resolved — Addressed
08/24/2022
Objection raised — Scope
08/24/2022
Objection resolved — Addressed
03/17/2021
Objection raised — Scope
03/17/2021
Objection resolved — Addressed
04/28/2017
Cycle 8 facade report signed — SAFE
02/21/2017
Cycle 8 facade report submitted
01/01/2017
Cycle 8 facade inspection completed
04/04/2013
Cycle 7 facade report submitted
03/15/2013
Cycle 7 facade report signed — SWARMP
03/12/2013
Cycle 7 facade inspection completed
12/06/2006
Cycle 6 facade report submitted
12/01/2006
Cycle 6 facade report signed — SWARMP
11/27/2006
Cycle 6 facade inspection completed
Nothing on file for this building.
Nothing on file for this building.
Nothing on file for this building.
Nothing on file for this building.