Over six families without stores
1545 SELWYN AVENUE
BRONX · BIN 2007811
💬 Discuss this project
1920Year Built
2Stories
C1Building Class
R7-1Zoning
4,353 sfGross Floor Area
10Units
Rent Stabilized9 Open Violations ▸
Over six families without stores · Owner of record: 1545 SELWYN NY LLC · 2,970 sf lot · 1.47 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalFire Protection
Floor 210p · 1 filing · 20 docs
Floor 110p · 1 filing · 20 docs
Basement11p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1545 SELWYN NY LLC203/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/10/2024$1.2M—Private party → 1545 SELWYN NY LLC$276/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
KNF SERVICES CROP205/24/2024
ADB ASSOCIATES305/21/2024
VASILIOS ARTEMIOU PE105/21/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NYC DESIGN FILE603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MABE GROUP INCGeneral Contractor603/21/2026
FRIED ELECTRIC CO.Electrical103/22/2026
PRIME PIPING & HEATING INFire Protection107/08/2026
A M B MECHANICALPlumbing103/22/2026
MPI PLUMBING CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP5616505/24/2024
Building Lifecycle
All (123)Filed (6)Permit Issued (4)Signed Off (3)Violation (11)Inspection (12)Objection (58)Special Inspection (29)
06/05/2025
Violation issued (HPD, closed)
A
04/30/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/25/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/25/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/25/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
10/16/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
10/16/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
10/07/2024
Signed off — Alteration CO
Filing to convert existing 2 story and basement, 2-Family residential building, into a 10-Unit building. No change in use, bulk or egress.
X01008648-S2
10/07/2024
Signed off — Alteration CO
Filing to convert existing 2 story and basement, 2-Family residential building, into a 10-Unit building. No change in use, bulk or egress.
X01008648-S3
09/04/2024
Signed off — Alteration CO
Filing to convert existing 2 story and basement, 2-Family residential building, into a 10-Unit building. No change in use, bulk or egress.
X01008648-S1
09/04/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/20/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/20/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/14/2024
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
07/12/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/10/2024
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
07/05/2024
Permit issued — Mechanical Systems
X01008648-S1-MS
07/03/2024
Permit issued — Plumbing
X01008648-S2-PL
06/20/2024
Permit issued — Sprinklers
X01008648-S3-EW-SP
06/12/2024
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
06/12/2024
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
06/12/2024
Special inspection requirement — Interior lighting power
FAHAD FATEH
06/12/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
06/12/2024
Special inspection requirement — Permanent certificate
FAHAD FATEH
06/12/2024
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
06/12/2024
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
06/12/2024
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
FAHAD FATEH
06/12/2024
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
06/12/2024
Special inspection requirement — Metering
FAHAD FATEH
06/12/2024
Special inspection requirement — Maintenance information
FAHAD FATEH
06/12/2024
Special inspection requirement — Fenestration areas
FAHAD FATEH
06/12/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
06/04/2024
Special inspection requirement — Duct leakage testing, insulation and design
FAHAD FATEH
06/04/2024
Special inspection requirement — Ventilation and air distribution system
FAHAD FATEH
05/29/2024
Objection raised — Energy
05/29/2024
Objection resolved — Addressed
05/29/2024
Objection raised — Scope
05/29/2024
Objection resolved — Addressed
05/29/2024
Objection raised — Zoning
05/29/2024
Objection resolved — Addressed
05/29/2024
Objection raised — Energy
05/29/2024
Objection resolved — Addressed
05/28/2024
Objection raised — Structural
05/28/2024
Objection resolved — Addressed
05/24/2024
Filed — Alteration CO
Filing to convert existing 2 story and basement, 2-Family residential building, into a 10-Unit building. No change in use, bulk or egress.
X01008648-P1
05/21/2024
Filed — Alteration CO
Filing to convert existing 2 story and basement, 2-Family residential building, into a 10-Unit building. No change in use, bulk or egress.
X01008648-S2
05/21/2024
Filed — Alteration CO
Filing to convert existing 2 story and basement, 2-Family residential building, into a 10-Unit building. No change in use, bulk or egress.
X01008648-S3
05/21/2024
Filed — Alteration CO
Filing to convert existing 2 story and basement, 2-Family residential building, into a 10-Unit building. No change in use, bulk or egress.
X01008648-S1
05/20/2024
Special inspection requirement — Post-installed Anchors
FAHAD FATEH
05/20/2024
Special inspection requirement — Mechanical Systems
FAHAD FATEH
05/20/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
05/20/2024
Special inspection requirement — Heating Systems
FAHAD FATEH
05/20/2024
Special inspection requirement — Post-installed Anchors
FAHAD FATEH
05/20/2024
Special inspection requirement — Final
FAHAD FATEH
05/20/2024
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
05/20/2024
Special inspection requirement — Maintenance information
FAHAD FATEH
05/20/2024
Special inspection requirement — Permanent certificate
FAHAD FATEH
05/20/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
05/20/2024
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
05/20/2024
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
Latest 60 of 123 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offAB BUILDERS NY07/05/2024
DOB NOWPlumbingSigned-offYG SERVICES INC07/03/2024
DOB NOWSprinklersSigned-offA M B MECHANICAL INC06/20/2024
DOB NOWGeneral ConstructionPermit IssuedAB BUILDERS NY05/15/2024
BISOTISSUED1ST LIGHT ENERGY INC01/31/2017
1 project · most recent 11/25/2024
General Wiring
FiledStatusContractorScope
11/25/2024CompleteFRIED ELECTRIC CO.General Wiring
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
04/30/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/25/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/25/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/25/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/16/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/16/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/04/2024Pass-Final CND-Occupancy InspectionPassView ↗
08/20/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/20/2024Pass-Final CND-Occupancy InspectionPassView ↗
08/14/2024Fail-Final CND-Occupancy InspectionFailView ↗
07/12/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/10/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 29
DateRequirementInspectorRole
06/12/2024Energy Code Compliance InspectionsFAHAD FATEHprogress
06/12/2024Insulation placement and R valuesFAHAD FATEHenergy_progress
06/12/2024Interior lighting powerFAHAD FATEHenergy_progress
06/12/2024Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
06/12/2024Permanent certificateFAHAD FATEHenergy_progress
06/12/2024Air barrier - visual inspectionFAHAD FATEHenergy_progress
06/12/2024Fenestration air leakageFAHAD FATEHenergy_progress
06/12/2024Exterior Insulation and Finish Systems (EIFS)FAHAD FATEHspecial
06/12/2024Fire-Resistance Rated ConstructionFAHAD FATEHprogress
06/12/2024MeteringFAHAD FATEHenergy_progress
06/12/2024Maintenance informationFAHAD FATEHenergy_progress
06/12/2024Fenestration areasFAHAD FATEHenergy_progress
06/12/2024Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
06/04/2024Duct leakage testing, insulation and designFAHAD FATEHenergy_progress
06/04/2024Ventilation and air distribution systemFAHAD FATEHenergy_progress
05/20/2024Post-installed AnchorsFAHAD FATEHspecial
05/20/2024Mechanical SystemsFAHAD FATEHspecial
05/20/2024Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
05/20/2024Heating SystemsFAHAD FATEHspecial
05/20/2024Post-installed AnchorsFAHAD FATEHspecial
05/20/2024FinalFAHAD FATEHprogress
05/20/2024Fire-Resistance Rated ConstructionFAHAD FATEHprogress
05/20/2024Maintenance informationFAHAD FATEHenergy_progress
05/20/2024Permanent certificateFAHAD FATEHenergy_progress
05/20/2024HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
Latest 25 of 29.
▾Documents — 42 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/21/2026X01008648-I1Request digital key ↗
08/21/2026X01008648-P1Request digital key ↗
08/21/2026X01008648-S3Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits3
▸BISPLAN / WORK APPROVAL APPLICATION2
09/26/2024240165842Open ↗
12/22/2016240165842Open ↗
▸BISWORK PERMIT APPLICATION1
01/31/2017240165842Open ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026X01008648-I1Open ↗
▸Seals & Professional Certifications14
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/13/2026X01008648-S1Open ↗
08/13/2026X01008648-S2Open ↗
08/13/2026X01008648-S3Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/04/2026X01008648-I1Open ↗
09/04/2026X01008648-I1Open ↗
08/24/2026X01008648-S1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/04/2026X01008648-I1Open ↗
09/04/2026X01008648-I1Open ↗
08/26/2026X01008648-S3Open ↗
Showing 3 of 4 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
12/22/2016240165842Open ↗
▸Safety & Tenant Protection1
▸BISTenant Protection Plan and Notes1
12/22/2016240165842Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/13/2026X01008648-P1Open ↗
08/13/2026X01008648-S3Open ↗
08/13/2026X01008648-S2Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
12/22/2016240165842Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
04/17/2019240165842Open ↗
12/22/2016240165842Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
09/24/2024240165842Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
04/17/2019240165842Open ↗
▸Approvals, Objections & Sign-offs1
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
09/26/2024240165842Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT1
12/22/2016240165842Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
09/25/2024240165842Open ↗
▸Filing & Intake Forms3
▸BISADDITIONAL INFORMATION2
01/26/2017240165842Open ↗
01/20/2017240165842Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
12/22/2016240165842Open ↗
▸Other Documents2
▸DOB NOWProperty Ownership Certification2
08/13/2026X01008648-P1Open ↗
08/13/2026X01008648-I1Open ↗