Multi-story retail building (2+)
1547 PITKIN AVENUE
BROOKLYN · BIN 3080700
💬 Discuss this project
1930Year Built
2Stories
K2Building Class
C4-3Zoning
16,000 sfGross Floor Area
2Units
1 Open Violation ▸FDNY Report ↗
Multi-story retail building (2+) · Owner of record: 1539-1547 PITKIN AVEREALTY · 8,000 sf lot · 2 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire ProtectionCivil
Roof4p · 3 filings · 20 docs
Floor 27p · 3 filings · 20 docs
Floor 11p · 1 filing · 4 docs
Cellar1p · 1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1539-1547 PITKIN AVE REALTY2207/08/2026
1805 PITKIN AVE REALTY CORP103/22/2026
REQ 90363 DEPT OF R.E. IN203/22/2026
COMMERCIAL AREA EQUITIES103/22/2026
OWNER OF 1543103/22/2026
OWNER OF PITKIN AVE103/22/2026
1539-1547 PITKIN REALTY ASSO1203/21/2026
1539 1547 REALTY ASSCO103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HPL ENGINEERING P.C.109/12/2025
MILTIADIS LEPTOURGOS, PE403/24/2023
HIGH LINE ENGINEERING PC101/06/2023
IMC ARCHITECTURE DPC110/06/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JM CONSULTANT STUDIO203/21/2026
CORE CONSULTANTS NYC603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
STONE WORK BUILDERS LLCGeneral Contractor903/21/2026
SAFETY FIRE SPRINKLER CORPFire Protection107/08/2026
B&B MECH PLBG & HTG LLCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HPL ENGINEERING PC5613109/12/2025
MILTIADIS LEPTOURGOS, PE508603/24/2023
Building Lifecycle
All (101)Filed (7)Permit Issued (5)Signed Off (5)Violation (32)Inspection (7)Objection (15)Special Inspection (30)
02/17/2026
Objection raised — Zoning
02/17/2026
Objection raised — Cost
02/17/2026
Objection raised — Admin
02/17/2026
Objection raised — Scope
02/17/2026
Objection raised — Zoning
09/12/2025
Filed — Alteration
FILE MECHANICAL WORK TO REQUEST EQUIPMENT USE PERMIT (EUP CARD) TO ADDRESS FIRE DEPARTMENT VIOLATION. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B01277349-I1
09/12/2025
Special inspection requirement — HVAC-R and service water heating equipment
Fran Huang
09/12/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Fran Huang
09/12/2025
Special inspection requirement — HVAC-R and service water heating system controls
Fran Huang
08/25/2025
Special inspection requirement — Mechanical Systems
Fran Huang
08/25/2025
Special inspection requirement — Final
Fran Huang
07/18/2025
Violation issued (FDNY_NOV, closed)
09/07/2023
Signed off — Alteration
Mechincal Application in conjuction with Alteration Job Number #B08000317-I1
B08000317-S1
06/28/2023
Signed off — Alteration
Modify existing sprinkler system at 2nd floor only by relocating/removing/replacing/installing sprinkler heads as per attached plans. All risers to remain as is. Obtain SP Permit. This application is filed in conjunction with the alteration (see comments)
B08046566-I1
06/26/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/22/2023
Signed off — Alteration
Install new steel dunnages for condensing roof top unit for freezer (at 2nd floor) as per plans. Obtain OT/GC Permit. Investigate the capacity of steel beams, composite stl deck, concrete, open web steel joists (14K1), all at roof level above freezer ...
B08047588-I1
06/22/2023
Signed off — Alteration
Mechincal Application in conjuction with Alteration Job Number #B08000317-I1
B08000317-I1
04/04/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
04/03/2023
Signed off — Alteration
REMOVE ALL EXISTING PLUMBING FIXTURES AS PER PLANS AT 2ND FLOOR ONLY. INSTALL 4 TOILETS (4 WC, 4 LAVS), 3 SINKS, 1 SLOP SINK & 5 FLOOR DRAINS AT 2nd FLOOR & CONNECT TO EXISTING SANITARY SEWER AT 1ST FLR/CELLAR AS PER PLANS. (SEE COMMENTS)
B08046559-I1
03/31/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/30/2023
Permit issued — Sprinklers
B08046566-I1-EW-SP
03/30/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/30/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/30/2023
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
03/27/2023
Special inspection requirement — HVAC-R and service water heating system controls
Miltiadis Leptourgos
03/27/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Miltiadis Leptourgos
03/27/2023
Special inspection requirement — HVAC-R and service water heating equipment
Miltiadis Leptourgos
03/27/2023
Special inspection requirement — Energy Code Compliance Inspections
Miltiadis Leptourgos
03/27/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Miltiadis Leptourgos
03/27/2023
Special inspection requirement — Maintenance information
Miltiadis Leptourgos
03/24/2023
Filed — Alteration
REMOVE ALL EXISTING PLUMBING FIXTURES AS PER PLANS AT 2ND FLOOR ONLY. INSTALL 4 TOILETS (4 WC, 4 LAVS), 3 SINKS, 1 SLOP SINK & 5 FLOOR DRAINS AT 2nd FLOOR & CONNECT TO EXISTING SANITARY SEWER AT 1ST FLR/CELLAR AS PER PLANS. (SEE COMMENTS)
B08046559-P1
03/01/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Miltiadis Leptourgos
03/01/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Miltiadis Leptourgos
03/01/2023
Special inspection requirement — HVAC-R and service water heating equipment
Miltiadis Leptourgos
03/01/2023
Special inspection requirement — Maintenance information
Miltiadis Leptourgos
03/01/2023
Special inspection requirement — Energy Code Compliance Inspections
Miltiadis Leptourgos
03/01/2023
Special inspection requirement — HVAC-R and service water heating system controls
Miltiadis Leptourgos
02/09/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/30/2023
Permit issued — Mechanical Systems
B08000317-S1-MS
01/25/2023
Permit issued — Plumbing
B08046559-I1-PL
01/24/2023
Permit issued — General Construction
B08000317-I1-GC
01/23/2023
Permit issued — Structural
B08047588-I1-GC-CX
01/12/2023
Objection raised — Admin
01/12/2023
Objection resolved — Addressed
01/12/2023
Objection raised — Other
01/12/2023
Objection resolved — Addressed
01/12/2023
Objection raised — Inspections
01/12/2023
Objection resolved — Addressed
01/12/2023
Objection raised — Scope
01/12/2023
Objection resolved — Addressed
01/12/2023
Objection raised — Fire_Protection
01/12/2023
Objection resolved — Addressed
01/06/2023
Filed — Alteration
Mechincal Application in conjuction with Alteration Job Number #B08000317-I1
B08000317-S1
01/06/2023
Special inspection requirement — Energy Code Compliance Inspections
Miltiadis Leptourgos
01/05/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Miltiadis Leptourgos
01/03/2023
Filed — Alteration
Modify existing sprinkler system at 2nd floor only by relocating/removing/replacing/installing sprinkler heads as per attached plans. All risers to remain as is. Obtain SP Permit. This application is filed in conjunction with the alteration (see comments)
B08046566-I1
01/03/2023
Filed — Alteration
Install new steel dunnages for condensing roof top unit for freezer (at 2nd floor) as per plans. Obtain OT/GC Permit. Investigate the capacity of steel beams, composite stl deck, concrete, open web steel joists (14K1), all at roof level above freezer ...
B08047588-I1
01/03/2023
Filed — Alteration
REMOVE ALL EXISTING PLUMBING FIXTURES AS PER PLANS AT 2ND FLOOR ONLY. INSTALL 4 TOILETS (4 WC, 4 LAVS), 3 SINKS, 1 SLOP SINK & 5 FLOOR DRAINS AT 2nd FLOOR & CONNECT TO EXISTING SANITARY SEWER AT 1ST FLR/CELLAR AS PER PLANS. (SEE COMMENTS)
B08046559-I1
12/30/2022
Special inspection requirement — Shutoff dampers
Miltiadis Leptourgos
12/30/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Miltiadis Leptourgos
Latest 60 of 101 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offSAFETY FIRE SPRINKLER CORP03/30/2023
DOB NOWMechanical SystemsSigned-offSTONE WORK BUILDERS LLC01/30/2023
DOB NOWPlumbingSigned-offTARGET PIPING NY LLC01/25/2023
DOB NOWGeneral ConstructionSigned-offSTONE WORK BUILDERS LLC01/24/2023
DOB NOWStructuralSigned-offSTONE WORK BUILDERS LLC01/23/2023
BISPLISSUEDTAVELLA PLBG & HTG CORP07/31/2007
BISMHISSUEDJNL CONSTRUCTION INC05/18/2007
BISPLISSUEDAMERICAN NATIONAL PLUMBING&HTG09/01/2006
BISOTISSUEDPEA CORP05/24/2006
BIS—ISSUEDN Y SIGN CITY INC08/01/2003
BIS—ISSUEDNEW YORK SIGN CITY INC07/25/2003
BIS—ISSUEDNEW YORK SIGN CITY INC07/25/2003
BISSPISSUEDC.R.U. MECHAN & HEATIN IN11/26/2002
BISPLISSUEDC.R.U. MECHAN & HEAT INC07/11/2002
BISEQISSUEDSKYLAND DEVELOPMENT CORP05/31/2002
BIS—ISSUEDSKYLAND DEVELOPMENT CORP05/31/2002
BISOTISSUEDNJ CONSTRUCTION REMODELING CO11/17/2000
BISOTISSUEDN J CONSTRUCTION RE MODELING CO11/16/2000
BISOTISSUEDNJ CONSTRUCTION REMODELING CO11/16/2000
1 project · most recent 09/12/2025
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
09/12/2025——Heating and Air Conditioning Systems
Heat / Cool
International Comfort Products RGS180HFAA0AATA 180,000 BTU · Condensing Unit ×1
York ZF150N24R2A1BAA1A1 150,000 BTU · Condensing Unit ×1
7 projects · most recent 02/08/2025
General Wiring
FiledStatusContractorScope
02/08/2025CompleteFIBERTEK DATA & ELEC CORPGeneral Wiring
11/24/2024CancelledFIBERTEK DATA & ELEC CORPGeneral Wiring
03/07/2024CompleteFIBERTEK DATA & ELEC CORPGeneral Wiring
12/21/2023CompleteWCK ELECTRIC CORP.—
11/28/2023CompleteWCK ELECTRIC CORP.General Wiring
11/06/2023CompleteWCK ELECTRIC CORP.General Wiring
09/26/2023CompletePRIME ELECTRICAL CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
06/26/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/04/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/31/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/30/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/30/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/30/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
02/09/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 40
DateRequirementInspectorRole
09/12/2025HVAC-R and service water heating equipmentFran Huangenergy_progress
09/12/2025HVAC-R and service water piping design and insulationFran Huangenergy_progress
09/12/2025HVAC-R and service water heating system controlsFran Huangenergy_progress
08/25/2025Mechanical SystemsFran Huangspecial
08/25/2025FinalFran Huangprogress
03/27/2023HVAC-R and service water heating system controlsMiltiadis Leptourgosenergy_progress
03/27/2023HVAC-R and service water piping design and insulationMiltiadis Leptourgosenergy_progress
03/27/2023HVAC-R and service water heating equipmentMiltiadis Leptourgosenergy_progress
03/27/2023Energy Code Compliance InspectionsMiltiadis Leptourgosprogress
03/27/2023Fire-Resistant Penetrations and JointsMiltiadis Leptourgosspecial
03/27/2023Maintenance informationMiltiadis Leptourgosenergy_progress
03/01/2023Fire-Resistant Penetrations and JointsMiltiadis Leptourgosspecial
03/01/2023HVAC-R and service water piping design and insulationMiltiadis Leptourgosenergy_progress
03/01/2023HVAC-R and service water heating equipmentMiltiadis Leptourgosenergy_progress
03/01/2023Maintenance informationMiltiadis Leptourgosenergy_progress
03/01/2023Energy Code Compliance InspectionsMiltiadis Leptourgosprogress
03/01/2023HVAC-R and service water heating system controlsMiltiadis Leptourgosenergy_progress
01/06/2023Energy Code Compliance InspectionsMiltiadis Leptourgosprogress
01/05/2023Fire-Resistant Penetrations and JointsMiltiadis Leptourgosspecial
12/30/2022Shutoff dampersMiltiadis Leptourgosenergy_progress
12/30/2022HVAC-R and service water piping design and insulationMiltiadis Leptourgosenergy_progress
12/30/2022HVAC-R and service water heating system controlsMiltiadis Leptourgosenergy_progress
12/30/2022Maintenance informationMiltiadis Leptourgosenergy_progress
12/30/2022HVAC-R and service water heating equipmentMiltiadis Leptourgosenergy_progress
12/27/2022Mechanical SystemsMiltiadis Leptourgosspecial
Latest 25 of 40.
▾Documents — 83 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/28/2026B08000317-I1Request digital key ↗
08/28/2026B08047588-I1Request digital key ↗
08/28/2026B08046566-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits23
▸BISPLAN / WORK APPROVAL APPLICATION23
01/15/2026301116094Open ↗
12/31/2025301116094Open ↗
12/10/2025301116094Open ↗
Showing 3 of 23 on file for this type
▸Seals & Professional Certifications29
▸DOB NOWProgress Inspector Seal & Signature12
08/31/2026B08046559-I1Open ↗
08/31/2026B08046559-I1Open ↗
08/28/2026B08047588-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
09/01/2026B08046566-I1Open ↗
08/31/2026B08046559-I1Open ↗
08/28/2026B08047588-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/28/2026B08046566-I1Open ↗
08/27/2026B08046559-P1Open ↗
08/27/2026B08046559-I1Open ↗
Showing 3 of 7 on file for this type
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/28/2026B08046566-I1Open ↗
08/27/2026B08046559-P1Open ↗
08/27/2026B08046559-I1Open ↗
Showing 3 of 7 on file for this type
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: RESPONSIBILITY4
01/14/2026301116094Open ↗
01/13/2026301116094Open ↗
07/07/2023301116094Open ↗
Showing 3 of 4 on file for this type
▸Approvals, Objections & Sign-offs8
▸BISSCHEDULE A - OCCUPANCY / USE8
10/03/2023301116094Open ↗
09/29/2023301116094Open ↗
09/21/2023301116094Open ↗
Showing 3 of 8 on file for this type
▸Filing & Intake Forms5
▸BISADDITIONAL INFORMATION5
01/20/2026301116094Open ↗
01/14/2026301116094Open ↗
01/06/2026301116094Open ↗
Showing 3 of 5 on file for this type