← Back
Two family converted from one family
1549 EAST 29 STREET
BROOKLYN · Madison · BIN 3211274
💬 Discuss this project
1930Year Built
2Stories
B3Building Class
R3-2Zoning
2,385 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Two family converted from one family · 1,900 sf lot · 1.26 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingGeneral
Floor 31p · 1 filing · 20 docs
Floor 25p · 2 filings · 20 docs
Floor 14p · 1 filing · 20 docs
Basement8p · 3 filings · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/19/2021$777K—THE NISSENBAUM MISHPACHA TRUST → Private party$326/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SABIR, RICHARDSON & WEISBERG ENGINE1110/20/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JMG CONSULTANTS1603/21/2026
W J PROFESSIONAL EXPEDITING COMPANY603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GREGG NY PLUMBING, INCPlumbing907/08/2026
ATLANTIDA HVAC CORPGeneral Contractor203/21/2026
SKYLINE ELEC'L CONTRACTElectrical103/22/2026
ATN. TO DETAIL MNGMT.CORPGeneral Contractor107/08/2026
SERENA CONSTR MGMT INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SRW ENGINEERING & ARCHITE11621006/24/2022
Building Lifecycle
All (57)Filed (11)Permit Issued (4)Signed Off (4)Violation (4)Inspection (4)Special Inspection (30)
06/05/2023
Signed off — Alteration
B08024250-I1
04/04/2023
Violation issued (ECB, closed)
Construction
03/29/2023
Permit issued — General Construction
B08024250-I1-GC
10/20/2022
Filed — Alteration
B08024250-I1
07/18/2022
Signed off — Alteration
B00538633-I1
07/06/2022
Signed off — Alteration
Installing Air conditioning units on the basement, 1st Fl, 2nd FL, and 3 Roof condenser units and associated piping and duct. No change to the structure or interior layout. No change to use, occupancy or egress.
B00567509-I1
07/06/2022
Special inspection requirement — HVAC-R and service water heating system controls
Yvette Richardson
07/06/2022
Special inspection requirement — Maintenance information
Yvette Richardson
07/06/2022
Special inspection requirement — Shutoff dampers
Yvette Richardson
07/06/2022
Special inspection requirement — Mechanical Systems
Yvette Richardson
07/06/2022
Special inspection requirement — Final
Yvette Richardson
07/06/2022
Special inspection requirement — HVAC-R and service water heating equipment
Yvette Richardson
07/06/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Yvette Richardson
06/24/2022
Filed — Alteration
Installing Air conditioning units on the basement, 1st Fl, 2nd FL, and 3 Roof condenser units and associated piping and duct. No change to the structure or interior layout. No change to use, occupancy or egress.
B00567509-P2
06/21/2022
Signed off — Alteration
New water, sewer, and storm Piping relocation, washer and dryer relocation, and check valves addition, new gas meter by utility company
B00567576-I1
06/20/2022
Special inspection requirement — Mechanical Systems
Yvette Richardson
06/20/2022
Special inspection requirement — Shutoff dampers
Yvette Richardson
06/20/2022
Special inspection requirement — Maintenance information
Yvette Richardson
06/20/2022
Special inspection requirement — HVAC-R and service water heating equipment
Yvette Richardson
06/20/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Yvette Richardson
06/20/2022
Special inspection requirement — HVAC-R and service water heating system controls
Yvette Richardson
06/20/2022
Special inspection requirement — Final
Yvette Richardson
05/11/2022
Filed — Alteration
New water, sewer, and storm Piping relocation, washer and dryer relocation, and check valves addition, new gas meter by utility company
B00567576-P2
12/30/2021
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
12/30/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/08/2021
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
11/08/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
10/28/2021
Special inspection requirement — Final
Yvette Richardson
10/28/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Yvette Richardson
10/28/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
Yvette Richardson
10/28/2021
Special inspection requirement — Lighting in dwelling units
Yvette Richardson
10/22/2021
Filed — Alteration
Installing Air conditioning units on the basement, 1st Fl, 2nd FL, and 3 Roof condenser units and associated piping and duct. No change to the structure or interior layout. No change to use, occupancy or egress.
B00567509-P1
10/22/2021
Filed — Alteration
B00538633-P3
10/22/2021
Special inspection requirement — HVAC-R and service water heating equipment
Yvette Richardson
10/22/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
Yvette Richardson
10/22/2021
Special inspection requirement — Shutoff dampers
Yvette Richardson
10/22/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Yvette Richardson
10/22/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
Yvette Richardson
10/22/2021
Special inspection requirement — Final
Yvette Richardson
10/22/2021
Special inspection requirement — Lighting in dwelling units
Yvette Richardson
10/22/2021
Special inspection requirement — Mechanical Systems
Yvette Richardson
10/22/2021
Special inspection requirement — Final
Yvette Richardson
10/22/2021
Special inspection requirement — HVAC-R and service water heating system controls
Yvette Richardson
10/22/2021
Special inspection requirement — Maintenance information
Yvette Richardson
10/11/2021
Filed — Alteration
New water, sewer, and storm Piping relocation, washer and dryer relocation, and check valves addition, new gas meter by utility company
B00567576-P1
10/05/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
Yvette Richardson
09/29/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/26/2021
Permit issued — Plumbing
B00567576-I1-PL
08/24/2021
Permit issued — Mechanical Systems
B00567509-I1-MS
08/11/2021
Filed — Alteration
B00538633-P2
08/04/2021
Filed — Alteration
Installing Air conditioning units on the basement, 1st Fl, 2nd FL, and 3 Roof condenser units and associated piping and duct. No change to the structure or interior layout. No change to use, occupancy or egress.
B00567509-I1
08/03/2021
Filed — Alteration
New water, sewer, and storm Piping relocation, washer and dryer relocation, and check valves addition, new gas meter by utility company
B00567576-I1
07/09/2021
Filed — Alteration
B00538633-P1
07/06/2021
Permit issued — General Construction
B00538633-I1-GC
07/01/2021
Violation issued (ECB, closed)
Construction
06/30/2021
Filed — Alteration
B00538633-I1
06/30/2021
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offATN TO DETAIL MNGMT03/29/2023
DOB NOWPlumbingSigned-offGREGG NY PLUMBING, INC08/26/2021
DOB NOWMechanical SystemsSigned-offATLANTIDA HVAC08/24/2021
DOB NOWGeneral ConstructionSigned-offSERENA CONSTR MGMT INC07/06/2021
1 project · most recent 07/15/2021
General Wiring
FiledStatusContractorScope
07/15/2021Permit IssuedSKYLINE ELEC'L CONTRACTGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
12/30/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/30/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/08/2021Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
11/08/2021Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 38
DateRequirementInspectorRole
07/06/2022HVAC-R and service water heating system controlsYvette Richardsonenergy_progress
07/06/2022Maintenance informationYvette Richardsonenergy_progress
07/06/2022Shutoff dampersYvette Richardsonenergy_progress
07/06/2022Mechanical SystemsYvette Richardsonspecial
07/06/2022FinalYvette Richardsonprogress
07/06/2022HVAC-R and service water heating equipmentYvette Richardsonenergy_progress
07/06/2022HVAC-R and service water piping design and insulationYvette Richardsonenergy_progress
06/20/2022Mechanical SystemsYvette Richardsonspecial
06/20/2022Shutoff dampersYvette Richardsonenergy_progress
06/20/2022Maintenance informationYvette Richardsonenergy_progress
06/20/2022HVAC-R and service water heating equipmentYvette Richardsonenergy_progress
06/20/2022HVAC-R and service water piping design and insulationYvette Richardsonenergy_progress
06/20/2022HVAC-R and service water heating system controlsYvette Richardsonenergy_progress
06/20/2022FinalYvette Richardsonprogress
10/28/2021FinalYvette Richardsonprogress
10/28/2021Fire-Resistant Penetrations and JointsYvette Richardsonspecial
10/28/2021Structural Stability – Alterations of existing buildingsYvette Richardsonspecial
10/28/2021Lighting in dwelling unitsYvette Richardsonenergy_progress
10/22/2021HVAC-R and service water heating equipmentYvette Richardsonenergy_progress
10/22/2021HVAC-R and service water piping design and insulationYvette Richardsonenergy_progress
10/22/2021Shutoff dampersYvette Richardsonenergy_progress
10/22/2021Fire-Resistant Penetrations and JointsYvette Richardsonspecial
10/22/2021Structural Stability – Alterations of existing buildingsYvette Richardsonspecial
10/22/2021FinalYvette Richardsonprogress
10/22/2021Lighting in dwelling unitsYvette Richardsonenergy_progress
Latest 25 of 38.
▾Documents — 64 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
09/01/2026B00538633-I1Request digital key ↗
09/01/2026B00538633-P3Request digital key ↗
09/01/2026B00538633-P2Request digital key ↗
Showing 3 of 11 on file for this type
▸Seals & Professional Certifications39
▸DOB NOWProgress Inspector Seal & Signature21
09/02/2026B00538633-P1Open ↗
09/02/2026B00567509-P2Open ↗
09/02/2026B00567509-P2Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature11
09/01/2026B00538633-I1Open ↗
09/01/2026B00538633-P1Open ↗
09/01/2026B00538633-P2Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/02/2026B00567509-P2Open ↗
09/01/2026B00538633-I1Open ↗
09/01/2026B00538633-I1Open ↗
Showing 3 of 7 on file for this type
▸Environmental & Asbestos11
▸DOB NOWDEP ACP-5: Asbestos Assessment Report11
09/01/2026B00538633-I1Open ↗
09/01/2026B00538633-P2Open ↗
09/01/2026B00538633-P1Open ↗
Showing 3 of 11 on file for this type
▸Energy Compliance3
▸DOB NOWEN2: As Built Energy Analysis.3
08/13/2026B00567576-I1Open ↗
08/13/2026B00567509-I1Open ↗
08/13/2026B00538633-I1Open ↗