HPD10/03/2016§ 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING IN THE FOYER LOCATED AT APT 1, 1st STORY
HPD10/03/2016§ 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR AT CEILING IN THE FOYER LOCATED AT APT 1, 1st STORY
HPD10/03/2016§ 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR AT CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 1, 1st STORY
HPD10/03/2016§ 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 1, 1st STORY
ECB06/20/2008ALTERED BLDG OCCUPIED W/O A VALID C OF O. ALT TYPE 2 JOB #402625254 ISIN CORRECT THAT TYPE WORK REQUIRED ALT TYPE 1 AND OBTAIN NEW C OF O AT2ND FLR ADD 1 ROOM. REMEDY: OBTAIN VALID C OF O.Nothing owed — awaiting certificate of correction
Two stories - detached, small or mid-size · 1,615 sf lot · 0.59 FAR built
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.