← Back
Two family converted from one family
155 14 STREET
BROOKLYN · BIN 3023379
💬 Discuss this project
1899Year Built
2Stories
B3Building Class
R6BZoning
2,112 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Two family converted from one family · Owner of record: XJZ ENTERPRISES, LLC · 2,000 sf lot · 1.06 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Roof6p · 4 filings · 20 docs
Floor 27p · 4 filings · 20 docs
Floor 15p · 3 filings · 20 docs
Basement5p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
RISE DEVELOPMENT PARTNERS603/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/06/2019$1.6M—— → —$758/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
J. CALLAHAN CONSULTING, INC.903/21/2026
THE GREEN STUDIO203/21/2026
Rigid Structural Design, LLC103/21/2026
J CALLAHAN CONSULTING603/21/2026
MILLENNIUM DESIGNS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TRI BOROUGH SCAFFOLDINGGeneral Contractor1203/21/2026
RISE DEVELOPMENT PARTNERSGeneral Contractor807/08/2026
MC SUPERSTRUCTURE INCGeneral Contractor507/08/2026
CENTRAL INTERIORS, INCGeneral Contractor407/08/2026
LIBERTY NY RESTORATION INGeneral Contractor307/08/2026
RITE WAY HEATING CORPPlumbing307/08/2026
M&D FIRE SPRINKLER INCFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JACK GREEN ASSOCIATES422608/07/2024
REGIONAL TESTING CORP.394501/24/2022
Building Lifecycle
All (88)Filed (15)Permit Issued (21)Signed Off (7)Violation (7)Inspection (6)Objection (2)Special Inspection (30)
10/30/2024
Signed off — Alteration
Three full and one half bathrooms with piping and plumbing fixtures. Front and rear hose bibs.2 kitchen sinks and dishwashers. 2 washers and one gas dryer. Total 19 plumbing fixtures. Fully sprinklered throughout.
B00347031-I1
10/11/2024
Signed off — Alteration
Hydronic warm floor and baseboard radiant heating fed by gas-fired boiler and split system air conditioning with rooftop condensing units. Total 1 boiler & 3 condensers
B00346976-I1
10/07/2024
Signed off — Alteration
Installation of a temporarily supported scaffold and Sidewalk Shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B00664115-I1
09/26/2024
Permit issued — Mechanical Systems
B00346976-I1-MS
08/13/2024
Special inspection requirement — Sprinkler Systems
JACK GREEN
08/13/2024
Special inspection requirement — HVAC and service water heating system controls
JACK GREEN
08/13/2024
Special inspection requirement — HVAC insulation and sealing
JACK GREEN
08/13/2024
Special inspection requirement — HVAC and service water heating equipment
JACK GREEN
08/13/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
JACK GREEN
08/13/2024
Special inspection requirement — Energy Code Compliance Inspections
JACK GREEN
08/07/2024
Filed — Alteration
Three full and one half bathrooms with piping and plumbing fixtures. Front and rear hose bibs.2 kitchen sinks and dishwashers. 2 washers and one gas dryer. Total 19 plumbing fixtures. Fully sprinklered throughout.
B00347031-P4
05/02/2024
Permit issued — Plumbing
B00347031-I1-PL
05/02/2024
Permit issued — Plumbing
B00347031-I1-EW-SP
04/16/2024
Signed off — Alteration
B00610477-I1
04/04/2024
Special inspection requirement — HVAC and service water heating equipment
JACK GREEN
04/04/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
JACK GREEN
04/04/2024
Special inspection requirement — Sprinkler Systems
JACK GREEN
04/04/2024
Special inspection requirement — Energy Code Compliance Inspections
JACK GREEN
04/04/2024
Special inspection requirement — HVAC and service water heating system controls
JACK GREEN
04/04/2024
Special inspection requirement — HVAC insulation and sealing
JACK GREEN
02/12/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
02/08/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
01/19/2024
Objection resolved — Addressed
01/16/2024
Filed — Alteration
Three full and one half bathrooms with piping and plumbing fixtures. Front and rear hose bibs.2 kitchen sinks and dishwashers. 2 washers and one gas dryer. Total 19 plumbing fixtures. Fully sprinklered throughout.
B00347031-P3
01/16/2024
Objection raised — Scope
11/08/2023
Permit issued — Construction Fence
B00610477-I1-FN
11/08/2023
Permit issued — Mechanical Systems
B00346976-I1-MS
08/08/2023
Permit issued — Construction Fence
B00610477-I1-FN
08/08/2023
Permit issued — Mechanical Systems
B00346976-I1-MS
07/26/2023
Permit issued — Supported Scaffold
B00664115-I1-SF
07/19/2023
Filed — Alteration
Installation of a temporarily supported scaffold and Sidewalk Shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B00664115-P2
07/19/2023
Permit issued — Supported Scaffold
B00664115-I1-SF
07/19/2023
Permit issued — Supported Scaffold
B00664115-I1-SH
07/10/2023
Violation issued (ECB, closed)
Construction
07/10/2023
Violation issued (ECB, closed)
Construction
07/10/2023
Violation issued (ECB, closed)
Construction
06/30/2023
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
06/30/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/21/2023
Signed off — Alteration
B00347525-I1
03/21/2023
Permit issued — Plumbing
B00347031-I1-PL
01/31/2023
Filed — Alteration
Installation of a temporarily supported scaffold and Sidewalk Shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B00664115-P1
01/24/2023
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
01/18/2023
Signed off — Alteration
B00476919-I1
01/04/2023
Permit issued — Structural
B00347525-I1-ST
01/04/2023
Permit issued — Sidewalk Shed
B00664115-I1-SF
01/03/2023
Permit issued — Supported Scaffold
B00664115-I1-SH
12/08/2022
Permit issued — Structural
B00347525-I1-ST
11/16/2022
Signed off — Alteration
Means and methods for partial demolition associated with approved ALT 1 Job #321590596. Changes to use, egress and occupancy, alteration of facade, and energy compliance all covered under ALT 1.
B00646062-I1
11/14/2022
Violation issued (ECB, closed)
Construction
08/02/2022
Violation issued (ECB, closed)
Construction
04/26/2022
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
03/28/2022
Permit issued — Sprinklers
B00347031-I1-PL
03/28/2022
Violation issued (ECB, closed)
Construction
01/26/2022
Permit issued — General Construction
B00646062-I1-GC
01/25/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
Paul Raymond
01/25/2022
Special inspection requirement — Final
Paul Raymond
01/24/2022
Filed — Alteration
Means and methods for partial demolition associated with approved ALT 1 Job #321590596. Changes to use, egress and occupancy, alteration of facade, and energy compliance all covered under ALT 1.
B00646062-P1
01/24/2022
Permit issued — Supported Scaffold
B00664115-I1-SH
01/24/2022
Permit issued — Supported Scaffold
B00664115-I1-SF
01/21/2022
Filed — Alteration
Installation of a temporarily supported scaffold and Sidewalk Shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B00664115-I1
Latest 60 of 88 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offCENTRAL INTERIORS, INC09/26/2024
DOB NOWPlumbingSigned-offLS PLUMBING CORP05/02/2024
DOB NOWPlumbingSigned-offM&D FIRE SPRINKLER INC05/02/2024
DOB NOWConstruction FenceSigned-offCENTRAL INTERIORS, INC11/08/2023
DOB NOWMechanical SystemsSigned-offCENTRAL INTERIORS, INC11/08/2023
DOB NOWConstruction FenceSigned-offLIBERTY NY RESTORATION IN08/08/2023
DOB NOWMechanical SystemsSigned-offLIBERTY NY RESTORATION IN08/08/2023
DOB NOWSupported ScaffoldSigned-offMC SUPERSTRUCTURE INC07/26/2023
DOB NOWSupported ScaffoldSigned-offMC SUPERSTRUCTURE INC07/19/2023
DOB NOWSupported ScaffoldSigned-offMC SUPERSTRUCTURE INC07/19/2023
DOB NOWPlumbingSigned-offLS PLUMBING CORP03/21/2023
DOB NOWStructuralSigned-offRISE DEVELOPMENT PARTNERS01/04/2023
DOB NOWSidewalk ShedSigned-offTRI BOROUGH SCAFFOLDING01/04/2023
DOB NOWSupported ScaffoldSigned-offTRI BOROUGH SCAFFOLDING01/03/2023
DOB NOWStructuralSigned-offRISE DEVELOPMENT PARTNERS12/08/2022
DOB NOWSprinklersSigned-offLS PLUMBING CORP03/28/2022
DOB NOWGeneral ConstructionSigned-offRISE DEVELOPMENT PARTNERS01/26/2022
DOB NOWSupported ScaffoldSigned-offTRI BOROUGH SCAFFOLDING01/24/2022
DOB NOWSupported ScaffoldSigned-offTRI BOROUGH SCAFFOLDING01/24/2022
DOB NOWStructuralSigned-offRISE DEVELOPMENT PARTNERS12/02/2021
DOB NOWSupport of ExcavationSigned-offRISE DEVELOPMENT PARTNERS12/02/2021
BIS—ISSUEDCENTRAL INTERIORS, INC09/25/2024
BIS—ISSUEDCENTRAL INTERIORS, INC09/25/2024
BISOTISSUEDACCORD POWER INC08/30/2024
BIS—ISSUEDCENTRAL INTERIORS, INC04/10/2024
BIS—ISSUEDCENTRAL INTERIORS, INC04/10/2024
BIS—ISSUEDCENTRAL INTERIORS, INC11/15/2023
BIS—ISSUEDCENTRAL INTERIORS, INC11/15/2023
BIS—ISSUEDPRO N.Y SOLUTIONS CORP08/30/2023
BIS—ISSUEDPRO N.Y SOLUTIONS CORP08/30/2023
BIS—ISSUEDPRO N.Y SOLUTIONS CORP07/13/2023
BISOTISSUEDACCORD POWER INC06/27/2023
BIS—ISSUEDRISE DEVELOPMENT PARTNERS01/06/2023
BIS—ISSUEDRISE DEVELOPMENT PARTNERS01/03/2023
BIS—ISSUEDRISE DEVELOPMENT PARTNERS01/06/2022
BIS—ISSUEDRISE DEVELOPMENT PARTNERS12/27/2021
5 projects · most recent 07/30/2024
General Wiring
FiledStatusContractorScope
07/30/2024CompletePW & SONS ELECTRICAL CORPGeneral Wiring
06/26/2023CompleteNEWGRANGE ELECTRIC, INC—
11/10/2022CompleteEMPIRE STATE ELECTL CORPGeneral Wiring
03/11/2022CompleteEMPIRE STATE ELECTL CORP—
01/20/2022CompleteV. VASS ELECTRIC CORP—
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
02/12/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
02/08/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/30/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
06/30/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/24/2023Pass-Final PL - UndergroundPassView ↗
04/26/2022Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 34
DateRequirementInspectorRole
08/13/2024Sprinkler SystemsJACK GREENspecial
08/13/2024HVAC and service water heating system controls JACK GREENenergy_progress
08/13/2024HVAC insulation and sealing JACK GREENenergy_progress
08/13/2024HVAC and service water heating equipment JACK GREENenergy_progress
08/13/2024Fire-Resistant Penetrations and JointsJACK GREENspecial
08/13/2024Energy Code Compliance InspectionsJACK GREENprogress
04/04/2024HVAC and service water heating equipment JACK GREENenergy_progress
04/04/2024Fire-Resistant Penetrations and JointsJACK GREENspecial
04/04/2024Sprinkler SystemsJACK GREENspecial
04/04/2024Energy Code Compliance InspectionsJACK GREENprogress
04/04/2024HVAC and service water heating system controls JACK GREENenergy_progress
04/04/2024HVAC insulation and sealing JACK GREENenergy_progress
01/25/2022Structural Stability – Alterations of existing buildingsPaul Raymondspecial
01/25/2022FinalPaul Raymondprogress
05/26/2021HVAC insulation and sealing JACK GREENenergy_progress
05/26/2021HVAC and service water heating equipment JACK GREENenergy_progress
05/26/2021HVAC and service water heating system controls JACK GREENenergy_progress
05/26/2021Sprinkler SystemsJACK GREENspecial
05/26/2021Fire-Resistant Penetrations and JointsJACK GREENspecial
05/26/2021Energy Code Compliance InspectionsJACK GREENprogress
04/30/2021Heating SystemsJACK GREENspecial
04/30/2021HVAC insulation and sealing JACK GREENenergy_progress
04/30/2021HVAC and service water heating equipment JACK GREENenergy_progress
04/30/2021Maintenance informationJACK GREENenergy_progress
04/30/2021HVAC and service water heating system controls JACK GREENenergy_progress
Latest 25 of 34.
▾Documents — 218 on file (BIS + DOB NOW)
▸Plans & Drawings19
▸DOB NOWPlans/Sketch6
09/01/2026B00610477-I1Request digital key ↗
08/31/2026B00646062-I1Request digital key ↗
08/31/2026B00646062-P1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Plumbing4
09/02/2026B00347031-I1Request digital key ↗
09/02/2026B00347031-P4Request digital key ↗
08/15/2026B00347031-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler4
09/02/2026B00347031-P4Request digital key ↗
09/02/2026B00347031-I1Request digital key ↗
08/15/2026B00347031-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Support of Excavation2
09/01/2026B00476919-I1Request digital key ↗
09/01/2026B00476919-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/02/2026B00346976-I1Request digital key ↗
08/15/2026B00346976-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
09/02/2026B00347525-I1Request digital key ↗
▸Applications & Permits27
▸BISWORK PERMIT APPLICATION16
11/21/2023321590596Open ↗
11/21/2023321590596Open ↗
11/21/2023321590596Open ↗
Showing 3 of 16 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION9
05/01/2025340728190Open ↗
04/09/2025321590596Open ↗
06/01/2023340888203Open ↗
Showing 3 of 9 on file for this type
▸BISPARTIAL DEMO: 10-DAY NOTICE (FOR AL/EW-OT PERMITS)1
01/07/2022321590596Open ↗
▸BISPARTIAL DEMO PLAN & DS1 (FOR AL/EW-OT PERMITS)1
01/07/2022321590596Open ↗
▸Zoning, Tax Lot & Property Records7
▸BISZONING DIAGRAM2
03/15/2021321590596Open ↗
10/16/2020321590596Open ↗
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026B00476919-I1Open ↗
08/13/2026B00476919-P1Open ↗
▸BISVERIFY TAX LOT1
03/26/2025321590596Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
04/18/2025321590596Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
01/07/2022321590596Open ↗
▸Seals & Professional Certifications54
▸DOB NOWProgress Inspector Seal & Signature23
09/28/2026B00346976-P1Open ↗
09/28/2026B00346976-P1Open ↗
09/28/2026B00346976-P1Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature15
09/01/2026B00476919-I1Open ↗
09/01/2026B00476919-P1Open ↗
09/01/2026B00610477-I1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
09/28/2026B00346976-P1Open ↗
09/28/2026B00346976-P1Open ↗
09/01/2026B00347031-I1Open ↗
Showing 3 of 11 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
05/11/2023340888203Open ↗
05/15/2020340728190Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
12/11/2021321590596Open ↗
12/11/2021321590596Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
05/11/2023340888203Open ↗
▸Trade Schedules & Equipment4
▸DOB NOWFDNY: Letter of No Objection4
08/13/2026B00347031-P3Open ↗
08/13/2026B00347031-P4Open ↗
08/13/2026B00347031-I1Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection8
▸BISSTREET TREE CHECKLIST2
09/22/2020321590596Open ↗
05/28/2020340728190Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM2
12/11/2021321590596Open ↗
09/22/2020321590596Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
10/16/2020321590596Open ↗
▸BISBPP: STREET TREES SITE PLAN1
03/11/2021340728190Open ↗
▸BISSTREET TREE SIGNOFF1
05/29/2025321590596Open ↗
▸BISTPP1: TENANT PROTECTION PLAN1
06/27/2023340888203Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form5
09/01/2026B00476919-I1Open ↗
08/31/2026B00646062-I1Open ↗
08/13/2026B00346976-I1Open ↗
Showing 3 of 5 on file for this type
▸Energy Compliance17
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
12/13/2024340888203Open ↗
05/11/2023340888203Open ↗
01/07/2022321590596Open ↗
Showing 3 of 4 on file for this type
▸BISINTERIOR LIGHTING POWER1
02/05/2025321590596Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
12/13/2024340888203Open ↗
▸BISSOLAR TAX ABATEMENT APPLICATION1
12/17/2024340888203Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
02/05/2025321590596Open ↗
▸BISFENESTRATION AREAS1
02/05/2025321590596Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
05/11/2023340888203Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
02/05/2025321590596Open ↗
▸BISLIGHTING IN DWELLING UNITS1
02/05/2025321590596Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
03/25/2025321590596Open ↗
▸BISLIGHTING CONTROLS1
02/05/2025321590596Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
12/11/2021321590596Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
03/04/2025321590596Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026B00347031-I1Open ↗
▸Inspections & Test Reports24
▸BISTECHNICAL REPORT: RESPONSIBILITY8
04/15/2025321590596Open ↗
12/13/2024340888203Open ↗
05/11/2023340888203Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX4
12/18/2021321590596Open ↗
12/18/2021321590596Open ↗
12/11/2021321590596Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER3
11/25/2025321590596Open ↗
12/18/2021321590596Open ↗
12/11/2021321590596Open ↗
▸BISTR3: CONCRETE DESIGN MIX TECHNICAL REPORT1
01/07/2022321590596Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
03/19/2025321590596Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
03/19/2025321590596Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
03/20/2023321590596Open ↗
▸BISSTRUCTURAL STEEL - HIGH STRENGTH BOLTING1
03/20/2023321590596Open ↗
▸BISMASTIC AND INTUMESCENT FIRE-RESISTANT COATINGS1
01/07/2022321590596Open ↗
▸BISSTRUCTURAL STEEL - WELDING1
03/20/2023321590596Open ↗
▸BISSOIL REPORT1
10/16/2020321590596Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
10/16/2020321590596Open ↗
▸Approvals, Objections & Sign-offs7
▸BISSUPERSEDING LETTER3
11/21/2023321590596Open ↗
11/21/2023321590596Open ↗
11/21/2023321590596Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
12/17/2024340888203Open ↗
07/14/2023321590596Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
12/17/2024340888203Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE1
09/22/2020321590596Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT3
12/13/2024340888203Open ↗
05/11/2023340888203Open ↗
09/22/2020321590596Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
03/04/2025321590596Open ↗
▸Filing & Intake Forms16
▸BISADDITIONAL INFORMATION10
11/21/2025321590596Open ↗
05/12/2025340728190Open ↗
04/18/2025321590596Open ↗
Showing 3 of 10 on file for this type
▸BISBOROUGH INTAKE FORM2
01/07/2022321590596Open ↗
12/18/2021321590596Open ↗
▸BISEFILING COVER SHEET2
05/07/2020321590596Open ↗
05/07/2020321590596Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET2
05/11/2023340888203Open ↗
05/15/2020340728190Open ↗
▸Other Documents12
▸DOB NOWPlot Diagram2
08/13/2026B00476919-P1Open ↗
08/13/2026B00476919-I1Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM1
09/22/2020321590596Open ↗
▸BISLOWEST FLOOR ELEVATION1
03/20/2023321590596Open ↗
▸BISBPP - DOT Builders Pavement Unit Waiver Request Form1
07/29/2025340728190Open ↗
▸BISEXTERIOR INSULATION AND FINISH SYSTEMS (EIFS) (2014)1
02/05/2025321590596Open ↗
▸BISSTRUCTURAL COLD-FORMED STEEL1
03/20/2023321590596Open ↗
▸BISMAINTENANCE INFORMATION1
02/05/2025321590596Open ↗
▸BISPROTECTION OF EXPOSED FOUNDATION INSULATION1
02/05/2025321590596Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
05/28/2020340728190Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B00476919-I1Open ↗
▸DOB NOWProject Specific General Liability (PGL1)1
08/13/2026B00646062-I1Open ↗