← Back
BuildNYC
Elevator apt, semi-fireproof without stores
Kennedy Plaza
155-15 NORTH CONDUIT AVENUE · BIN 4266766
💬 Discuss this project
1969Year Built
7Stories
D1Building Class
R3-1Zoning
106,946 sfGross Floor Area
160Units
LL97 CoveredRent Stabilized0 Active ViolationsFISP: SAFEFDNY Report ↗
Elevator apt, semi-fireproof without stores · Owner of record: Kennedy Plaza · 51,920 sf lot · 2.06 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanicalPlumbingFire Protection
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofDecommissioning of Sprint fiber and power2p · 3 filings · 10 docs
Floor 1Decommissioning of Sprint fiber and power2 filings · 6 docs
CellarInstall new exhaust ducts for gas dryers6p · 4 filings · 16 docs
Site & exteriorDecommissioning of Sprint fiber and power1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Kennedy Plaza2903/22/2026
Diversified Realty303/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Ronald Krigsman P.E.P.C.205/14/2024
Azimuth Engineering101/10/2023
Roman S. Mardarewich Architect209/15/2021
Tectonic Engineering211/14/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Biltmore Group203/21/2026
SKY Management Group403/21/2026
CCM Services Group203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Bci CommunicationsGeneral Contractor303/21/2026
Gotham Communicationsspecialty_contractor303/21/2026
Crosslink Wirelessspecialty_contractor207/08/2026
Joseph Ferrigno P&HPlumbing207/08/2026
Costrotta ConstructionGeneral Contractor203/21/2026
Colgate ScaffoldingGeneral Contractor103/21/2026
Communication Component SGeneral Contractor103/21/2026
Wireless Network GroupGeneral Contractor103/21/2026
LXS Airspecialty_contractor107/08/2026
Advanced Plumbing MechanicalPlumbing107/08/2026
Star Industrial ServiceGeneral Contractor103/21/2026
Alcatel-Lucent USAGeneral Contractor107/25/2013
Ramapo CommunicationGeneral Contractor105/16/2016
Sba CommunicationsGeneral Contractor106/28/2004
Skyfield Construcrtion ServicesGeneral Contractor110/01/2001
Skyfield Construction ServicesGeneral Contractor111/30/2001
Vantage AssociatesGeneral Contractor111/01/2001
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Ronald Krigsman P.E.P.C.1583205/14/2024
Jeremy K McKeon, P.E.7263101/10/2023
Greenline Developers3447109/15/2021
Building Lifecycle
02/20/2029
Facade inspection report due (FISP Cycle 9, sub-cycle C)
The filing window opened 02/21/2027. No Cycle 9 filing on record yet
08/29/2026
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AND EAST WALL IN THE BATHROOM LOCATED AT APT…
HPD violation · closed
08/29/2026
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE MORTISE LOCK AT DOOR IN THE ENTRANCE LOCATED AT APT 1F, 1st STORY, 2nd APARTMENT…
HPD violation · closed
06/15/2026
Elevator Category 1 inspection report filed
01/22/2026
Boiler inspection report filed
Initial · no defects · Accepted
167 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offJoseph Ferrigno P&H05/20/2024
DOB NOWBoiler EquipmentSigned-offJoseph Ferrigno P&H05/20/2024
DOB NOWAntennaSigned-offGotham Communications02/24/2023
DOB NOWPlumbingSigned-offAdvanced Plumbing Mechanical11/04/2021
DOB NOWMechanical SystemsSigned-offLXS Air10/31/2021
DOB NOWAntennaSigned-offSteadfast Development02/19/2020
DOB NOWAntennaSigned-offSteadfast Development08/24/2018
BISMHISSUEDWireless Network Group04/03/2018
BISOTISSUEDStar Industrial Service02/02/2018
BISMHISSUEDWireless Network Group05/12/2017
BISOTISSUEDRamapo Communication05/16/2016
BISOTISSUEDAlcatel-Lucent USA07/25/2013
BISOTISSUEDCommunication Component S03/07/2013
BISOTISSUEDCostrotta Construction Ma02/28/2013
BISOTISSUEDBci Communications01/13/2010
BISOTISSUEDBci Communications01/20/2009
BISOTISSUEDCostrotta Construction03/14/2008
BISOTISSUEDBci Communications01/22/2008
BISOTISSUEDBci Communications11/23/2007
BISEQISSUEDColgate Scaffolding03/20/2006
BISFSISSUEDStar Industrial Service11/15/2005
BISOTISSUEDSba Communications06/28/2004
BISMHISSUEDSkyfield Construction Services11/30/2001
BISOTISSUEDVantage Associates11/01/2001
BISOTISSUEDSkyfield Construcrtion Services10/01/2001
2 projects · most recent 04/19/2024
Boiler Controls
FiledStatusContractorScope
04/19/2024Permit IssuedLaura Electrical LightingBoiler Controls
04/19/2024CompleteLaura Electrical Lighting—
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
08/13/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/07/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/05/2024Pass-Final Boiler Equipment InspectionPassView ↗
12/28/2021Certified Sprinkler (PL)-Sprinkler-HydroCertifiedView ↗
12/28/2021Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/22/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
04/22/2024Tenant Protection Plan ComplianceHOWARD KRIGSMANspecial
04/22/2024HVAC-R and service water heating equipmentHOWARD KRIGSMANenergy_progress
04/22/2024Maintenance informationHOWARD KRIGSMANenergy_progress
174 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account