Condo, residential tower (mixed-use, multi-family elevator) [derived]
155 1ST AVENUE
MANHATTAN · East Village · BIN 1006416
💬 Discuss this project
1999Year Built
15Stories
RMBuilding Class
R8BZoning
76,583 sfGross Floor Area
36Units
LL97 CoveredRent Stabilized10 Active Violations 9 unresolved · 1 paperwork only 3 likely answered ▸FDNY Report ↗
Condo, residential tower (mixed-use, multi-family elevator) [derived] · 17,441 sf lot · 4.39 FAR built · Flood zone X
Locations of Work
StructuralElectricalMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofTheater for the New CityUnder Construction34p · 3 filings · 20 docs
Floor 1Theater for the New CityUnder Construction32p · 3 filings · 20 docs
CellarTheater for the New City3p · 1 filing · 16 docs
Site & exterior1p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Owner of 155 1 Ave303/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Cosentini Associates606/09/2025
Severud Associates205/27/2025
Tohfaz Uddin PE110/26/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A1 Expediting Service203/21/2026
Terence Hairston Architect1603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Pen EnterprisesGeneral Contractor2307/08/2026
York Scaffold EquipmentScaffold507/08/2026
Tristate Plumbing ServicesPlumbing307/08/2026
Salzman Electric CoElectrical103/21/2026
Kurt Ebinger Electric ConstructionElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JPC Logistics Dba JPCL EN351405/27/2025
Building Lifecycle
All (96)Filed (9)Permit Issued (18)Signed Off (1)Violation (26)Inspection (3)Objection (11)Special Inspection (28)
05/01/2026
Permit issued — Mechanical Systems
M00229533-I1-MS
06/30/2025
Objection resolved — Addressed
06/30/2025
Objection resolved — Resolved
06/20/2025
Objection raised — Admin
06/13/2025
Objection raised — Admin
06/13/2025
Objection raised — Admin
06/10/2025
Special inspection requirement — Heating Systems
Asma Hashmi
06/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Asma Hashmi
06/10/2025
Special inspection requirement — Mechanical Systems
Asma Hashmi
06/10/2025
Special inspection requirement — Energy Code Compliance Inspections
Asma Hashmi
06/10/2025
Special inspection requirement — Final
Asma Hashmi
06/10/2025
Special inspection requirement — Maintenance information
Asma Hashmi
06/10/2025
Special inspection requirement — Electrical motors
Asma Hashmi
06/10/2025
Special inspection requirement — Shutoff dampers
Asma Hashmi
06/10/2025
Special inspection requirement — HVAC insulation and sealing
Asma Hashmi
06/10/2025
Special inspection requirement — Electrical energy consumption
Asma Hashmi
06/10/2025
Special inspection requirement — HVAC and service water heating system controls
Asma Hashmi
06/09/2025
Filed — Alteration
PLUMBING WORK IN CONJUNCTION WITH THE REPLACEMENT OF THE HVAC UNITS, NO CHANGE IN EGRESS, USE OR OCCUPANCY PROPOSED UNDER THIS APPLICATION.
M00237220-P3
05/27/2025
Filed — Alteration
STRUCTURAL DUNNAGE IN CONJUNCTION WITH HVAC UNIT REPLACEMENT
M00237236-P1
05/23/2025
Filed — Alteration
Replace existing AC Units with three (3) New Rooftop HVAC Units including associated ductwork, dampers and piping.
M00229533-P1
05/20/2025
Special inspection requirement — Post-installed Anchors
Asma Hashmi
05/20/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Asma Hashmi
05/20/2025
Special inspection requirement — Structural Steel - Details
Asma Hashmi
05/20/2025
Special inspection requirement — Structural Steel - High Strength Bolting
Asma Hashmi
05/20/2025
Special inspection requirement — Structural Steel - Welding
Asma Hashmi
05/20/2025
Special inspection requirement — Final
Asma Hashmi
05/20/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Asma Hashmi
05/20/2025
Special inspection requirement — Heating Systems
Asma Hashmi
05/20/2025
Special inspection requirement — Mechanical Systems
Asma Hashmi
05/20/2025
Special inspection requirement — Energy Code Compliance Inspections
Asma Hashmi
05/20/2025
Special inspection requirement — Final
Asma Hashmi
05/20/2025
Special inspection requirement — Shutoff dampers
Asma Hashmi
05/20/2025
Special inspection requirement — HVAC and service water heating system controls
Asma Hashmi
05/20/2025
Special inspection requirement — Electrical motors
Asma Hashmi
05/20/2025
Special inspection requirement — Maintenance information
Asma Hashmi
05/20/2025
Special inspection requirement — HVAC insulation and sealing
Asma Hashmi
05/20/2025
Special inspection requirement — Electrical energy consumption
Asma Hashmi
05/01/2025
Permit issued — Mechanical Systems
M00229533-I1-MS
03/19/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
02/12/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
01/22/2025
Permit issued — Plumbing
M00237220-I1-PL
01/14/2025
Filed — Alteration
PLUMBING WORK IN CONJUNCTION WITH THE REPLACEMENT OF THE HVAC UNITS, NO CHANGE IN EGRESS, USE OR OCCUPANCY PROPOSED UNDER THIS APPLICATION.
M00237220-P2
01/13/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
12/30/2024
Objection resolved — Addressed
12/26/2024
Objection raised — Scope
12/13/2024
Filed — Alteration
PLUMBING WORK IN CONJUNCTION WITH THE REPLACEMENT OF THE HVAC UNITS, NO CHANGE IN EGRESS, USE OR OCCUPANCY PROPOSED UNDER THIS APPLICATION.
M00237220-P1
11/01/2024
Signed off — Alteration
M00617318-I1
09/23/2024
Permit issued — Construction Fence
M00617318-I1-FN
05/01/2024
Permit issued — Mechanical Systems
M00229533-I1-MS
05/01/2024
Permit issued — Structural
M00237236-I1-ST
01/19/2024
Permit issued — Plumbing
M00237220-I1-PL
09/27/2023
Permit issued — Construction Fence
M00617318-I1-FN
06/17/2023
Permit issued — Mechanical Systems
M00229533-I1-MS
06/15/2023
Permit issued — Structural
M00237236-I1-ST
04/26/2023
Permit issued — Structural
M00237236-I1-ST
04/26/2023
Permit issued — Mechanical Systems
M00229533-I1-MS
01/19/2023
Permit issued — Plumbing
M00237220-I1-PL
10/05/2022
Permit issued — Construction Fence
M00617318-I1-FN
10/03/2022
Permit issued — Structural
M00237236-I1-ST
04/12/2022
Permit issued — Mechanical Systems
M00229533-I1-MS
Latest 60 of 96 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedPen Enterprises05/01/2026
DOB NOWMechanical SystemsPermit IssuedPen Enterprises05/01/2025
DOB NOWPlumbingPermit IssuedTristate Plumbing Services01/22/2025
DOB NOWConstruction FenceSigned-offYork Scaffold Equipment09/23/2024
DOB NOWMechanical SystemsPermit IssuedPen Enterprises05/01/2024
DOB NOWStructuralPermit IssuedPen Enterprises05/01/2024
DOB NOWPlumbingPermit IssuedTristate Plumbing Services01/19/2024
DOB NOWConstruction FenceSigned-offYork Scaffold Equipment09/27/2023
DOB NOWMechanical SystemsPermit IssuedPen Enterprises06/17/2023
DOB NOWStructuralPermit IssuedPen Enterprises06/15/2023
DOB NOWStructuralPermit IssuedPen Enterprises04/26/2023
DOB NOWMechanical SystemsPermit IssuedPen Enterprises04/26/2023
DOB NOWPlumbingPermit IssuedTristate Plumbing Services01/19/2023
DOB NOWConstruction FenceSigned-offYork Scaffold Equipment10/05/2022
DOB NOWStructuralPermit IssuedPen Enterprises10/03/2022
DOB NOWMechanical SystemsPermit IssuedPen Enterprises04/12/2022
DOB NOWMechanical SystemsPermit IssuedPen Enterprises12/15/2021
DOB NOWConstruction FenceSigned-offYork Scaffold Equipment10/28/2021
BISMHISSUEDMamais Contracting07/14/2017
BISOTISSUEDMamais Contracting06/29/2017
BISMHISSUEDPizzo Brothers02/28/2014
BISMHISSUEDCottam Heating & Air Condit06/04/2013
BISMHISSUEDCottam Heating & Air Condit05/23/2013
BISMHISSUEDMand Restoration02/18/2009
BISOTISSUEDMand Restoration03/20/2008
BISPLISSUEDDanica Plumbing Heat02/11/2003
BIS—ISSUEDGeorge R Rose Construction Co01/23/2002
BISOTISSUEDJGN Construction01/09/1992
BISPLISSUEDWilliam C. Gerakaris P&H07/31/1991
BISMHISSUEDJGN Construction06/11/1991
BISSPRE-ISSUEDDOB12/13/1990
BIS—RE-ISSUEDInterboro Sign & Maints08/02/1990
1 project · most recent 05/23/2025
Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
05/23/2025Permit IssuedPen EnterprisesHeating Systems
Cooling
Trane YHD240 20 tons · Rooftop Unit ×8
Task TGU103RT-NG-YCH 10 tons · Rooftop Unit ×4
Heating
Trane YHD240 20 tons · Rooftop Unit ×8
Task TGU103RT-NG-YCH 10 tons ×4
1 project · most recent 06/09/2025
Gas
FiledStatusContractorScope
06/09/2025Permit IssuedTristate Plumbing ServicesGas
1 project · most recent 02/20/2018
General Wiring
FiledStatusContractorScope
02/20/2018CompleteRND ElectricGeneral Wiring
1 project · most recent 05/27/2025
Steel
FiledStatusContractorScope
05/27/2025Permit IssuedPen EnterprisesSteel
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
03/19/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
02/12/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
01/13/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 28
DateRequirementInspectorRole
06/10/2025Heating SystemsAsma Hashmispecial
06/10/2025Fire-Resistant Penetrations and JointsAsma Hashmispecial
06/10/2025Mechanical SystemsAsma Hashmispecial
06/10/2025Energy Code Compliance InspectionsAsma Hashmiprogress
06/10/2025FinalAsma Hashmiprogress
06/10/2025Maintenance informationAsma Hashmienergy_progress
06/10/2025Electrical motorsAsma Hashmienergy_progress
06/10/2025Shutoff dampersAsma Hashmienergy_progress
06/10/2025HVAC insulation and sealing Asma Hashmienergy_progress
06/10/2025Electrical energy consumptionAsma Hashmienergy_progress
06/10/2025HVAC and service water heating system controls Asma Hashmienergy_progress
05/20/2025Post-installed AnchorsAsma Hashmispecial
05/20/2025Structural Stability – Alterations of existing buildingsAsma Hashmispecial
05/20/2025Structural Steel - DetailsAsma Hashmispecial
05/20/2025Structural Steel - High Strength BoltingAsma Hashmispecial
05/20/2025Structural Steel - WeldingAsma Hashmispecial
05/20/2025FinalAsma Hashmiprogress
05/20/2025Fire-Resistant Penetrations and JointsAsma Hashmispecial
05/20/2025Heating SystemsAsma Hashmispecial
05/20/2025Mechanical SystemsAsma Hashmispecial
05/20/2025Energy Code Compliance InspectionsAsma Hashmiprogress
05/20/2025FinalAsma Hashmiprogress
05/20/2025Shutoff dampersAsma Hashmienergy_progress
05/20/2025HVAC and service water heating system controls Asma Hashmienergy_progress
05/20/2025Electrical motorsAsma Hashmienergy_progress
Latest 25 of 28.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Theater for the New CityArts / Culture / EntertainmentFloor 1, Roof
Project M00237220 Alteration · Permit Entire · 10/18/2019
Project M00237236 Alteration · Permit Entire · 10/18/2019
Project M00229533 Alteration · Permit Entire · 10/16/2019
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 146 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch - Plumbing4
08/25/2026M00237220-I1Request digital key ↗
08/25/2026M00237220-P2Request digital key ↗
08/15/2026M00237220-P3Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Structural2
08/15/2026M00237236-P1Request digital key ↗
08/15/2026M00237236-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems2
08/23/2026M00229533-P1Request digital key ↗
08/23/2026M00229533-I1Request digital key ↗
▸DOB NOWPlans/Sketch1
09/03/2026M00617318-I1Request digital key ↗
▸Applications & Permits16
▸BISPLAN / WORK APPROVAL APPLICATION8
01/07/2019122973755Open ↗
02/07/2018122973755Open ↗
12/23/2016122973755Open ↗
Showing 3 of 8 on file for this type
▸BISWORK PERMIT APPLICATION6
07/25/2017122973755Open ↗
07/11/2017122973755Open ↗
03/05/2014121813190Open ↗
Showing 3 of 6 on file for this type
▸BISPLACE OF ASSEMBLY2
10/25/2024102970108Open ↗
10/24/2024102970108Open ↗
▸Seals & Professional Certifications57
▸DOB NOWProgress Inspector Seal & Signature17
08/30/2026M00237236-P1Open ↗
08/28/2026M00229533-P1Open ↗
08/28/2026M00229533-P1Open ↗
Showing 3 of 17 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION16
05/07/2019122973755Open ↗
05/07/2019122973755Open ↗
01/07/2019122973755Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
08/30/2026M00237236-P1Open ↗
08/30/2026M00237236-P1Open ↗
08/30/2026M00237236-P1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
09/03/2026M00617318-I1Open ↗
08/25/2026M00237220-P3Open ↗
08/25/2026M00237220-P2Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
10/21/2013121813190Open ↗
11/17/2008110379251Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
10/21/2013121813190Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
11/17/2008110379251Open ↗
▸Trade Schedules & Equipment8
▸BISEQUIPMENT USE APPLICATION/PERMIT5
08/05/2015121813190Open ↗
04/07/2014121567624Open ↗
04/04/2014121567624Open ↗
Showing 3 of 5 on file for this type
▸BISEQUIPMENT USE PERMITS3
04/07/2014121567624Open ↗
04/04/2014121567624Open ↗
05/21/2009110379251Open ↗
▸Safety & Tenant Protection1
▸BISTenant Protection Plan and Notes1
12/23/2016122973755Open ↗
▸Environmental & Asbestos8
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
12/23/2016122973755Open ↗
10/21/2013121813190Open ↗
04/02/2013121567624Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form3
08/25/2026M00237220-I1Open ↗
08/23/2026M00229533-I1Open ↗
08/13/2026M00237236-I1Open ↗
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
04/02/2013121567624Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
11/17/2008110379251Open ↗
▸Energy Compliance11
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS8
05/07/2019122973755Open ↗
12/23/2016122973755Open ↗
05/19/2015121813190Open ↗
Showing 3 of 8 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
04/30/2019122973755Open ↗
08/05/2015121813190Open ↗
04/07/2014121567624Open ↗
▸Approvals, Objections & Sign-offs16
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter8
08/25/2026M00237220-P2Open ↗
08/25/2026M00237220-I1Open ↗
08/23/2026M00229533-P1Open ↗
Showing 3 of 8 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST4
05/07/2019122973755Open ↗
04/30/2019122973755Open ↗
08/05/2015121813190Open ↗
Showing 3 of 4 on file for this type
▸BISADMINISTRATIVE OBJECTIONS2
04/02/2013121567624Open ↗
11/17/2008110379251Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
04/30/2019122973755Open ↗
11/21/2014121813190Open ↗
▸Cost, Insurance & Ownership10
▸BISCOST AFFIDAVIT10
05/07/2019122973755Open ↗
02/07/2018122973755Open ↗
12/23/2016122973755Open ↗
Showing 3 of 10 on file for this type
▸Filing & Intake Forms10
▸BISEFILING COVER SHEET4
12/23/2016122973755Open ↗
10/21/2013121813190Open ↗
04/02/2013121567624Open ↗
Showing 3 of 4 on file for this type
▸BISBOROUGH INTAKE FORM4
05/07/2019122973755Open ↗
05/07/2019122973755Open ↗
01/07/2019122973755Open ↗
Showing 3 of 4 on file for this type
▸BISADDITIONAL INFORMATION2
02/19/2019122973755Open ↗
02/15/2018122973755Open ↗