← Back
Walk-up cooperative
155-25 155 AVENUE
QUEENS · BIN 4434881
💬 Discuss this project
1958Year Built
2Stories
C6Building Class
R5Zoning
90,300 sfGross Floor Area
92Units
LL97 CoveredRent Stabilized0 Open ViolationsFDNY Report ↗
Walk-up cooperative · 207,860 sf lot · 0.43 FAR built · Flood zone X
Locations of Work
Mechanical
Floor 11p · 1 filing · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
120-10 12 85TH AVE OWNERS707/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BAZINI ENGINEERING, P.C.212/22/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EAST COAST PETROLEUM403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
EAST COAST PETROLEUM INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BAZINI ENGINEERING, P.C.1808212/22/2023
Building Lifecycle
All (22)Filed (2)Permit Issued (2)Signed Off (2)Violation (9)Inspection (1)Special Inspection (6)
08/15/2024
Signed off — Alteration
INSTALL REPLACEMENT FUEL OIL STORAGE TANK IN NEW TANK ROOM AS PER PLANS. ABANDON EXISTING BURIED FUEL STORAGE TANK. CHANGE GRADE OF FUEL FROM #4 TO #2 OIL. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00896658-I1
08/15/2024
Signed off — Alteration
INSTALL NEW PARTITION WALLS IN FUEL OIL STORAGE TANK AREA. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00896802-I1
01/16/2024
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
01/10/2024
Permit issued — Boiler Equipment
Q00896658-I1-BE
01/04/2024
Permit issued — General Construction
Q00896802-I1-GC
12/22/2023
Filed — Alteration
INSTALL REPLACEMENT FUEL OIL STORAGE TANK IN NEW TANK ROOM AS PER PLANS. ABANDON EXISTING BURIED FUEL STORAGE TANK. CHANGE GRADE OF FUEL FROM #4 TO #2 OIL. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00896658-I1
12/22/2023
Filed — Alteration
INSTALL NEW PARTITION WALLS IN FUEL OIL STORAGE TANK AREA. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00896802-I1
06/27/2023
Special inspection requirement — Tenant Protection Plan Compliance
Joseph Bazini
06/27/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Joseph Bazini
06/27/2023
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
Joseph Bazini
06/27/2023
Special inspection requirement — Tenant Protection Plan Compliance
Joseph Bazini
06/27/2023
Special inspection requirement — Final
Joseph Bazini
06/27/2023
Special inspection requirement — Fire-Resistance Rated Construction
Joseph Bazini
03/08/2022
Violation issued (HPD, closed)
A
04/16/2021
Violation issued (HPD, closed)
A
01/03/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/06/2006
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/31/2005
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/13/2004
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/16/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/10/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/10/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offEAST COAST PETROLEUM INC01/10/2024
DOB NOWGeneral ConstructionSigned-offEAST COAST PETROLEUM INC01/04/2024
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
01/16/2024Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
06/27/2023Tenant Protection Plan ComplianceJoseph Bazinispecial
06/27/2023Fire-Resistant Penetrations and JointsJoseph Bazinispecial
06/27/2023Fuel-Oil Storage and Fuel-Oil Piping SystemsJoseph Bazinispecial
06/27/2023Tenant Protection Plan ComplianceJoseph Bazinispecial
06/27/2023FinalJoseph Baziniprogress
06/27/2023Fire-Resistance Rated ConstructionJoseph Baziniprogress
▾Documents — 11 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/23/2026Q00896658-I1Request digital key ↗
08/23/2026Q00896802-I1Request digital key ↗
▸Seals & Professional Certifications7
▸DOB NOWSpecial Inspector Seal & Signature4
09/23/2026Q00896658-I1Open ↗
09/23/2026Q00896658-I1Open ↗
09/23/2026Q00896658-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/23/2026Q00896658-I1Open ↗
08/13/2026Q00896802-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/23/2026Q00896802-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/23/2026Q00896658-I1Open ↗
08/13/2026Q00896802-I1Open ↗