← Back
Two stories - detached, small or mid-size
155-37 100 STREET
QUEENS · BIN 4294770
💬 Discuss this project
1930Year Built
2.5Stories
A1Building Class
R3XZoning
2,276 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · 4,000 sf lot · 0.57 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
KARIM MOBAROK 1103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/28/2022$850K—— → —$373/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ARCALHEK304/09/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A&A BUILDING CONSULTANTS INC.403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ZR UNIVERSAL CONSTRUCTIONGeneral Contractor207/08/2026
SIGNORE & SONS PLBG CORPPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ARCALHEK PC3340204/09/2026
AA BUILDING & INSPECTION1519106/21/2024
Building Lifecycle
All (42)Filed (3)Permit Issued (4)Signed Off (2)Violation (22)Inspection (6)Objection (4)Special Inspection (1)
06/22/2026
Signed off — Alteration
In cellar cap and remove illegal 3 pc bathroom , gas range and residential sink. In first floor cap and remove illegal toilet. In second floor cap and remove illegal gas range and residential sink. In attic cap and remove illegal 3 pc bathroom.
Q01065304-S1
04/09/2026
Filed — Alteration
In cellar cap and remove illegal 3 pc bathroom , gas range and residential sink. In first floor cap and remove illegal toilet. In second floor cap and remove illegal gas range and residential sink. In attic cap and remove illegal 3 pc bathroom.
Q01065304-P1
04/07/2026
Signed off — Alteration
In cellar cap and remove illegal 3 pc bathroom , gas range and residential sink. In first floor cap and remove illegal toilet. In second floor cap and remove illegal gas range and residential sink. In attic cap and remove illegal 3 pc bathroom.
Q01065304-I1
03/31/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
03/10/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
RAYMOND CALAMARI
10/08/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/26/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
09/19/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
06/25/2025
Permit issued — Plumbing
Q01065304-S1-PL
06/04/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/09/2025
Permit issued — General Construction
Q01065304-I1-GC
02/20/2025
Inspection — No Access-Final PL - Up to 3 Requested Floors
No Access
View inspection ↗
01/14/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
11/12/2024
Permit issued — Plumbing
Q01065304-S1-PL
11/07/2024
Permit issued — General Construction
Q01065304-I1-GC
10/09/2024
Objection resolved — Addressed
09/25/2024
Objection resolved — Addressed
07/02/2024
Objection raised — Inspections
07/02/2024
Objection raised — Scope
06/21/2024
Filed — Alteration
In cellar cap and remove illegal 3 pc bathroom , gas range and residential sink. In first floor cap and remove illegal toilet. In second floor cap and remove illegal gas range and residential sink. In attic cap and remove illegal 3 pc bathroom.
Q01065304-S1
06/21/2024
Filed — Alteration
In cellar cap and remove illegal 3 pc bathroom , gas range and residential sink. In first floor cap and remove illegal toilet. In second floor cap and remove illegal gas range and residential sink. In attic cap and remove illegal 3 pc bathroom.
Q01065304-I1
05/24/2024
Violation issued (ECB, closed)
Quality of Life
05/24/2024
Violation issued (ECB, closed)
Quality of Life
05/24/2024
Violation issued (ECB, closed)
Quality of Life
05/24/2024
Violation issued (ECB, closed)
Quality of Life
05/24/2024
Violation issued (ECB, closed)
Quality of Life
05/24/2024
Violation issued (ECB, closed)
Quality of Life
05/24/2024
Violation issued (ECB, closed)
Quality of Life
05/24/2024
Violation issued (ECB, closed)
Quality of Life
05/24/2024
Violation issued (ECB, closed)
Quality of Life
05/24/2024
Violation issued (ECB, closed)
Construction
05/21/2024
Violation issued (ECB, closed)
Construction
05/21/2024
Violation issued (ECB, closed)
Construction
05/21/2024
Violation issued (ECB, closed)
Construction
05/21/2024
Violation issued (ECB, closed)
Construction
05/21/2024
Violation issued (ECB, closed)
Construction
05/21/2024
Violation issued (ECB, closed)
Construction
05/21/2024
Violation issued (ECB, closed)
Construction
05/21/2024
Violation issued (ECB, closed)
Construction
05/21/2024
Violation issued (ECB, closed)
Construction
05/21/2024
Violation issued (ECB, closed)
Construction
05/21/2024
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offSIGNORE & SONS PLBG CORP06/25/2025
DOB NOWGeneral ConstructionSigned-offZR UNIVERSAL CONSTRUCTION04/09/2025
DOB NOWPlumbingSigned-offSIGNORE & SONS PLBG CORP11/12/2024
DOB NOWGeneral ConstructionSigned-offZR UNIVERSAL CONSTRUCTION11/07/2024
1 project · most recent 04/09/2026
Gas Water/Sanitary
FiledStatusContractorScope
04/09/2026Signed-offSIGNORE & SONS PLBG CORPGas, Water/Sanitary
1 project · most recent 01/06/2025
General Wiring
FiledStatusContractorScope
01/06/2025Permit IssuedDNR ELECTRIC INCORPORATEGeneral Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
03/31/2026Pass-Final General Construction Non-Directive 14PassView ↗
10/08/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/26/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
09/19/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
02/20/2025No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
01/14/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 1
DateRequirementInspectorRole
03/10/2026Fire-Resistant Penetrations and JointsRAYMOND CALAMARIspecial
▾Documents — 10 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/22/2026Q01065304-P1Request digital key ↗
08/22/2026Q01065304-S1Request digital key ↗
08/22/2026Q01065304-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/22/2026Q01065304-S1Open ↗
08/13/2026Q01065304-P1Open ↗
08/13/2026Q01065304-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/23/2026Q01065304-P1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/22/2026Q01065304-S1Open ↗
08/13/2026Q01065304-I1Open ↗
08/13/2026Q01065304-P1Open ↗