| Owner | Filings | Most Recent |
|---|---|---|
| UNITED DEVELOPERS | 6 | 03/21/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| PIROOZ ENGINEERING, P.C. | 3 | 06/24/2025 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 06/24/2025 | — | — | Heating and Air Conditioning Systems, Ventilation Systems | Heat / Cool Mitsubishi Electric CU-1: MXZ-SM48NAMHZ
AH-1, AH-2 & AH-3: MSZ-GS09
AH-4: MSZ-GS12 48,000 BTU · Vrf Outdoor ×2 Ventilation |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/24/2025 | — | — | Plumbing-Sprinkler, Storm, Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/24/2025 | — | — | Steel, Concrete, Wood |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/24/2025 | — | — | Fence |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 04/08/2025 | Masonry | — | special |
| 02/12/2025 | Concrete - Cast-In-Place | — | special |
| 02/12/2025 | Excavations - Sheeting, Shoring, and Bracing | — | special |
| 02/12/2025 | Fire-Resistant Penetrations and Joints | — | special |
| 02/12/2025 | Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable) | — | special |
| 02/12/2025 | Heating Systems | — | special |
| 02/12/2025 | Subgrade Inspections | — | special |
| 02/12/2025 | Subsurface Investigations (Borings/Test Pits) | — | special |
| 02/12/2025 | Structural Cold-Formed Steel | — | special |
| 02/12/2025 | Structural Steel - Details | — | special |
| 02/12/2025 | Final | — | progress |
| 02/12/2025 | Lowest Floor Elevation | — | progress |
| 02/12/2025 | Footing and Foundation | — | progress |
| 02/12/2025 | Energy Code Compliance Inspections | — | progress |
| 02/12/2025 | Fire-Resistance Rated Construction | — | progress |
| 02/12/2025 | Preliminary | — | progress |
| 02/12/2025 | Structural Wood Frame | — | progress |
| 02/12/2025 | Fenestration air leakage | — | energy_progress |
| 02/12/2025 | HVAC-R and service water heating system controls | — | energy_progress |
| 02/12/2025 | Air barrier — testing | — | energy_progress |
| 02/12/2025 | HVAC-R and service water piping design and insulation | — | energy_progress |
| 02/12/2025 | Air barrier - visual inspection | — | energy_progress |
| 02/12/2025 | Maintenance information | — | energy_progress |
| 02/12/2025 | Fenestration and door U-factor and product ratings | — | energy_progress |
| 02/12/2025 | Metering | — | energy_progress |