← Back
BuildNYC
Two family converted from one family
155 PUGSLEY AVENUE
BRONX · BIN 2020026
💬 Discuss this project
1925Year Built
1.5Stories
B3Building Class
R3AZoning
1,669 sfGross Floor Area
2Units
Two family converted from one family · 5,571 sf lot · 0.3 FAR built · Flood zone X500
Locations of Work
Electrical
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofPhotovoltaic system installationUnder Construction1p · 1 filing · 15 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Parker and West Engineering210/13/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Sunrun Installation ServiceGeneral Contractor110/07/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Parker and West Engineering5272210/13/2026
Building Lifecycle
10/13/2026
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF-MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
X01463946-P1
10/12/2026
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
10/12/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
10/12/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
10/12/2026
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
13 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarPermit IssuedSunrun Installation Service10/06/2026
1 project · most recent 10/12/2026
General Wiring
FiledStatusContractorScope
10/12/2026Permit IssuedSunrun Solar ElectlGeneral Wiring
1 project · most recent 10/13/2026
FiledStatusContractorScope
10/13/2026Permit IssuedSunrun Installation Service—
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
10/12/2026Air barrier - visual inspectionWalid Abdullaenergy_progress
10/12/2026Fire-Resistant Penetrations and JointsWalid Abdullaspecial
10/12/2026Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
10/12/2026Energy Code Compliance InspectionsWalid Abdullaprogress
10/12/2026FinalWalid Abdullaprogress
09/24/2026Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
09/24/2026Air barrier - visual inspectionWalid Abdullaenergy_progress
09/22/2026Fire-Resistant Penetrations and JointsWalid Abdullaspecial
09/22/2026Energy Code Compliance InspectionsWalid Abdullaprogress
09/22/2026FinalWalid Abdullaprogress
15 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account