Over six families without stores
155 SMITH STREET
BROOKLYN · BIN 3005773
💬 Discuss this project
1931Year Built
2Stories
C1Building Class
R6AZoning
9,200 sfGross Floor Area
10Units
Rent Stabilized0 Open Violations
Over six families without stores · Owner of record: 155 SMITH STREET LLC · 2,500 sf lot · 3.68 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalPlumbingFire Protection
Roof37p · 1 filing · 20 docs
Penthouse45p · 1 filing · 20 docs
Floor 436p · 1 filing · 20 docs
Floor 339p · 1 filing · 20 docs
Floor 235p · 1 filing · 20 docs
Floor 139p · 1 filing · 20 docs
Cellar45p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BRUKLYN BUILDERS5507/08/2026
OWNERS REP1007/08/2026
155 SMITH STREET LLC203/22/2026
BK DEVELOPERS103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/30/2023$3.0M—155 SMITH LLC → 155 SMITH STREET LLC$321/sf building
03/09/2021$2.0M—— → —$217/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EXPEDITING 4 U1103/21/2026
BRUKLYN BUILDERS603/21/2026
AE DESIGN SOLUTION203/21/2026
BMG GROUP USA503/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BRUKLYN BUILDERS INCGeneral Contractor1707/08/2026
CORE SCAFFOLD SYSTEMS INC.General Contractor507/08/2026
PRIME PIPING & HEATING INFire Protection107/08/2026
MPI PLUMBING CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP56161511/25/2024
Building Lifecycle
All (157)Filed (20)Permit Issued (14)Signed Off (11)Violation (10)Inspection (16)Objection (56)Special Inspection (30)
05/05/2026
Violation issued (HPD, closed)
A
04/09/2025
Special inspection requirement — Protection of exposed foundation insulation
FAHAD FATEH
04/09/2025
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
04/09/2025
Special inspection requirement — Lighting controls
FAHAD FATEH
04/09/2025
Special inspection requirement — Fenestration areas
FAHAD FATEH
04/09/2025
Special inspection requirement — Interior lighting power
FAHAD FATEH
04/09/2025
Special inspection requirement — Exterior lighting power
FAHAD FATEH
04/09/2025
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
FAHAD FATEH
04/09/2025
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
04/09/2025
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
04/09/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
04/09/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
FAHAD FATEH
04/09/2025
Special inspection requirement — Metering
FAHAD FATEH
04/09/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
04/09/2025
Special inspection requirement — Maintenance information
FAHAD FATEH
04/09/2025
Special inspection requirement — Lighting in dwelling units
FAHAD FATEH
04/09/2025
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
04/09/2025
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
04/04/2025
Objection resolved — Addressed
12/04/2024
Objection raised — Cost
11/26/2024
Signed off — ALT-CO - New Building with Existing Elements to Remain
SUBSEQUENT MECHANICAL APPLICATION FILED HEREWITH.
B08012255-S6
11/26/2024
Signed off — Alteration
B00870897-I1
11/26/2024
Signed off — ALT-CO - New Building with Existing Elements to Remain
SUBSEQUENT MECHANICAL APPLICATION FILED HEREWITH.
B08012255-S5
11/26/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00870893-I1
11/26/2024
Signed off — Alteration
B00889559-I1
11/26/2024
Permit issued — Supported Scaffold
B00870897-I1-SF
11/26/2024
Permit issued — Protection and Mechanical Methods
B00889559-I1-PMM
11/25/2024
Filed — ALT-CO - New Building with Existing Elements to Remain
SUBSEQUENT MECHANICAL APPLICATION FILED HEREWITH.
B08012255-P9
11/21/2024
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
11/21/2024
Special inspection requirement — Interior lighting power
FAHAD FATEH
11/21/2024
Special inspection requirement — Lighting controls
FAHAD FATEH
11/21/2024
Special inspection requirement — Protection of exposed foundation insulation
FAHAD FATEH
11/21/2024
Special inspection requirement — Fenestration areas
FAHAD FATEH
11/21/2024
Special inspection requirement — Maintenance information
FAHAD FATEH
11/21/2024
Special inspection requirement — Lighting in dwelling units
FAHAD FATEH
11/21/2024
Special inspection requirement — Exterior lighting power
FAHAD FATEH
11/21/2024
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
11/21/2024
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
11/21/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
11/21/2024
Special inspection requirement — Metering
FAHAD FATEH
07/29/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
07/16/2024
Signed off — ALT-CO - New Building with Existing Elements to Remain
SUBSEQUENT MECHANICAL APPLICATION FILED HEREWITH.
B08012255-S3
07/16/2024
Signed off — ALT-CO - New Building with Existing Elements to Remain
SUBSEQUENT MECHANICAL APPLICATION FILED HEREWITH.
B08012255-S4
07/11/2024
Signed off — ALT-CO - New Building with Existing Elements to Remain
SUBSEQUENT MECHANICAL APPLICATION FILED HEREWITH.
B08012255-S7
07/02/2024
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
04/10/2024
Inspection — Pass-Final SP - Up to 9 Requested Floors
Pass
View inspection ↗
03/06/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
02/26/2024
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
02/23/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/20/2024
Permit issued — Sprinklers
B08012255-S6-EW-SP
02/15/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
02/02/2024
Objection resolved — Addressed
01/31/2024
Signed off — Alteration
FENCE APPLICATION FILED IN CONJUNCTION WITH ALTERATION CO JOB# B08012255.
B00801007-I1
01/18/2024
Objection raised — Scope
01/15/2024
Filed — ALT-CO - New Building with Existing Elements to Remain
SUBSEQUENT MECHANICAL APPLICATION FILED HEREWITH.
B08012255-P8
12/21/2023
Objection raised — Scope
12/21/2023
Objection resolved — Addressed
12/18/2023
Filed — ALT-CO - New Building with Existing Elements to Remain
SUBSEQUENT MECHANICAL APPLICATION FILED HEREWITH.
B08012255-P7
12/13/2023
Signed off — ALT-CO - New Building with Existing Elements to Remain
SUBSEQUENT MECHANICAL APPLICATION FILED HEREWITH.
B08012255-S2
11/29/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
Latest 60 of 157 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupported ScaffoldSigned-offBRUKLYN BUILDERS INC11/26/2024
DOB NOWProtection and Mechanical MethodsSigned-offBRUKLYN BUILDERS INC11/26/2024
DOB NOWSprinklersSigned-offA M B MECHANICAL INC02/20/2024
DOB NOWPlumbingSigned-offYG SERVICES INC08/02/2023
DOB NOWMechanical SystemsSigned-offBRUKLYN BUILDERS INC07/05/2023
DOB NOWStructuralSigned-offBRUKLYN BUILDERS INC06/22/2023
DOB NOWFoundationSigned-offBRUKLYN BUILDERS INC06/22/2023
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC06/15/2023
DOB NOWGeneral ConstructionPermit IssuedBRUKLYN BUILDERS INC06/07/2023
DOB NOWFoundationSigned-offBRUKLYN BUILDERS INC06/05/2023
DOB NOWSupport of ExcavationSigned-offBRUKLYN BUILDERS INC06/05/2023
DOB NOWSupported ScaffoldSigned-offCORE SCAFFOLD SYSTEMS INC05/09/2023
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC05/09/2023
DOB NOWConstruction FenceSigned-offBRUKLYN BUILDERS INC05/05/2023
BISPLISSUEDDELPHI PLBG. & HTG., INC05/16/2011
BISPLISSUEDBEST PLUMBING & HVAC INC05/26/2010
BISMHISSUEDNJ PAPPAS CONSTRUCTION CO04/16/2004
BISMHISSUEDN J PAPPAS CONSTRUCTION CO08/07/2003
BISPLISSUEDACE CONTRACTING INC.06/19/2003
BIS—ISSUEDN J PAPPAS CONST CO05/23/2003
BISEQISSUEDN J PAPPAS CONST CO05/23/2003
1 project · most recent 11/25/2024
Storm Water/Sanitary
FiledStatusContractorScope
11/25/2024Signed-offYG SERVICES INCStorm, Water/Sanitary
4 projects · most recent 10/11/2023
General Wiring
FiledStatusContractorScope
10/11/2023CompletePOWER DIRECT ELECTRIC INCGeneral Wiring
08/24/2023CompletePOWER DIRECT ELECTRIC INC—
05/05/2023CompleteSOLAS ELECTRICAL CORP—
10/05/2019CompleteMACK ELECTRICAL INC—
1 project · most recent 11/25/2024
FiledStatusContractorScope
11/25/2024Signed-offA M B MECHANICAL INC3 scope_items
▾Field Inspections (DOB CAP) — 16
DateTypeResultReport
07/29/2024Pass-Final General Construction Non-Directive 14PassView ↗
07/02/2024Fail-Final General Construction Non-Directive 14FailView ↗
04/10/2024Pass-Final SP - Up to 9 Requested FloorsPassView ↗
03/06/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/26/2024Fail-Final General Construction Non-Directive 14FailView ↗
02/23/2024Pass-Final CND-Occupancy InspectionPassView ↗
11/29/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
11/20/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/13/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
11/09/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/30/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
09/05/2023Pass-Final PL - UndergroundPassView ↗
08/09/2023Pass-Final PL - UndergroundPassView ↗
06/22/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/22/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/22/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 88
DateRequirementInspectorRole
04/09/2025MeteringFAHAD FATEHenergy_progress
04/09/2025Protection of exposed foundation insulationFAHAD FATEHenergy_progress
04/09/2025Fenestration areasFAHAD FATEHenergy_progress
04/09/2025Lighting controlsFAHAD FATEHenergy_progress
04/09/2025Lighting in dwelling unitsFAHAD FATEHenergy_progress
04/09/2025Fenestration air leakageFAHAD FATEHenergy_progress
04/09/2025Air barrier - visual inspectionFAHAD FATEHenergy_progress
04/09/2025Insulation placement and R valuesFAHAD FATEHenergy_progress
04/09/2025Exterior lighting powerFAHAD FATEHenergy_progress
04/09/2025Maintenance informationFAHAD FATEHenergy_progress
04/09/2025Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
04/09/2025Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
04/09/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
04/09/2025Exterior Insulation and Finish Systems (EIFS)FAHAD FATEHspecial
04/09/2025Energy Code Compliance InspectionsFAHAD FATEHprogress
04/09/2025Fire-Resistance Rated ConstructionFAHAD FATEHprogress
04/09/2025Interior lighting powerFAHAD FATEHenergy_progress
11/21/2024Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
11/21/2024MeteringFAHAD FATEHenergy_progress
11/21/2024Insulation placement and R valuesFAHAD FATEHenergy_progress
11/21/2024Maintenance informationFAHAD FATEHenergy_progress
11/21/2024Protection of exposed foundation insulationFAHAD FATEHenergy_progress
11/21/2024Air barrier - visual inspectionFAHAD FATEHenergy_progress
11/21/2024Fenestration areasFAHAD FATEHenergy_progress
11/21/2024Exterior lighting powerFAHAD FATEHenergy_progress
Latest 25 of 88.
▾Documents — 142 on file (BIS + DOB NOW)
▸Plans & Drawings20
▸DOB NOWPlans/Sketch20
08/28/2026B08012255-P3Request digital key ↗
08/28/2026B08012255-P4Request digital key ↗
08/28/2026B08012255-P1Request digital key ↗
Showing 3 of 20 on file for this type
▸Applications & Permits6
▸BISPLAN / WORK APPROVAL APPLICATION3
03/25/2024320146061Open ↗
02/28/2024302142170Open ↗
03/31/2010320146061Open ↗
▸BISWORK PERMIT APPLICATION2
05/20/2011320146061Open ↗
06/15/2010320146061Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
06/15/2023340884975Open ↗
▸Zoning, Tax Lot & Property Records7
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026B08012255-I1Open ↗
08/13/2026B08012255-P9Open ↗
08/13/2026B08012255-P5Open ↗
▸DOB NOWZoning Exhibit form (1-5)3
08/13/2026B08012255-I1Open ↗
08/13/2026B08012255-P5Open ↗
08/13/2026B08012255-P9Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B08012255-I1Open ↗
▸Seals & Professional Certifications51
▸DOB NOWDPL-1: Design Professional Seal & Signature20
08/28/2026B08012255-P3Open ↗
08/28/2026B08012255-P4Open ↗
08/28/2026B08012255-I1Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWProgress Inspector Seal & Signature15
09/01/2026B08012255-P3Open ↗
08/26/2026B08012255-S3Open ↗
08/25/2026B08012255-P9Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature13
09/01/2026B08012255-P3Open ↗
09/01/2026B08012255-S6Open ↗
08/26/2026B08012255-S3Open ↗
Showing 3 of 13 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
06/07/2023340884975Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
06/07/2023340884975Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
03/31/2010320146061Open ↗
▸Trade Schedules & Equipment8
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/13/2026B08012255-P9Open ↗
08/13/2026B08012255-I1Open ↗
08/13/2026B08012255-P5Open ↗
▸BISWATER METER PERMIT : DEP-METER2
07/14/2011320146061Open ↗
07/14/2011320146061Open ↗
▸BISSELF-CERT PLUMBING NOTICE1
07/14/2011320146061Open ↗
▸BISSCHEDULE B - PLUMBING1
03/31/2010320146061Open ↗
▸BISRPZ/DDCV TEST REPORT : GEN215B1
07/14/2011320146061Open ↗
▸Safety & Tenant Protection6
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
06/15/2023340884975Open ↗
▸BISBPP: STREET TREES SITE PLAN1
06/15/2023340884975Open ↗
▸BISSTREET TREE CHECKLIST1
06/07/2023340884975Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B08012255-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026B08012255-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026B08012255-I1Open ↗
▸Environmental & Asbestos18
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
08/28/2026B08012255-P5Open ↗
08/28/2026B08012255-S3Open ↗
08/28/2026B08012255-S4Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form7
08/28/2026B08012255-S2Open ↗
08/28/2026B08012255-S3Open ↗
08/28/2026B08012255-S4Open ↗
Showing 3 of 7 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
03/31/2010320146061Open ↗
▸Energy Compliance1
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026B08012255-S4Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY2
02/07/2024320146061Open ↗
02/07/2024320146061Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
02/07/2024320146061Open ↗
▸Approvals, Objections & Sign-offs3
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
02/26/2024320146061Open ↗
▸BISFINAL1
02/07/2024320146061Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
03/31/2010320146061Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT1
03/31/2010320146061Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
01/31/2024320146061Open ↗
▸Filing & Intake Forms4
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
06/07/2023340884975Open ↗
▸BISEFILING COVER SHEET1
03/31/2010320146061Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
06/07/2023340884975Open ↗
▸BISADDITIONAL INFORMATION1
06/20/2023340884975Open ↗
▸Other Documents13
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026B08012255-P5Open ↗
08/13/2026B08012255-P9Open ↗
08/13/2026B08012255-I1Open ↗
▸DOB NOWProperty Ownership Certification3
08/28/2026B08012255-P5Open ↗
08/14/2026B08012255-P9Open ↗
08/14/2026B08012255-I1Open ↗
▸DOB NOWSite Survey: Initial3
08/13/2026B08012255-I1Open ↗
08/13/2026B08012255-P9Open ↗
08/13/2026B08012255-P5Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION2
06/15/2023340884975Open ↗
06/15/2023340884975Open ↗
▸DOB NOWFinal Survey1
08/13/2026B08012255-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B08012255-S1Open ↗