← Back
BuildNYC
Self-storage warehouse
155 WEST 29TH STREET
MANHATTAN · BIN 1091717
💬 Discuss this project
2022Year Built
17Stories
E7Building Class
M1-9A/R12Zoning
140,351 sfGross Floor Area
1Units
LL97 Covered0 Active Violations
Self-storage warehouse · Owner of record: Division West 29th Street · 13,093 sf lot · 10.72 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projectsW29TH Street Self-storage6 filings
RoofRoof protection1p · 1 filing
Floor 14W29TH Street Self-storageUnder Construction1 filing · 4 docs
Floor 13Personnel and material hoist installation1p · 1 filing
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6W29TH Street Self-storageUnder Construction2p · 3 filings · 4 docs
Floor 5W29TH Street Self-storage3p · 4 filings · 5 docs
Floor 4W29TH Street Self-storage3p · 3 filings · 5 docs
Floor 3W29TH Street Self-storage7p · 5 filings · 12 docs
Floor 2W29TH Street Self-storageUnder Construction4p · 3 filings · 8 docs
Floor 1Div West 29th Street, LLC1p · 3 filings · 4 docs
MezzanineDiv West 29th Street, LLC1p · 1 filing · 4 docs
CellarDiv West 29th Street, LLC2p · 3 filings · 4 docs
Sub-CellarW29TH Street Self-storage1p · 2 filings · 8 docs
Site & exteriorPublic Storage9 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Division West 29th Street10411/14/2026
NYC Department of Housing Preservation and Development307/08/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AE Design Solution1803/21/2026
Milrose Consultants1803/21/2026
Lizardos Engineering Associates203/21/2026
Kazam Consultants203/21/2026
Danico Services203/21/2026
Patuxent Engineering403/21/2026
ECC203/21/2026
Ggonzalez Bohlereng203/21/2026
Lombardo Building Consultants203/21/2026
Lombardo Professional Engineering103/21/2026
Consolidated Scaffold Bridge203/21/2026
KD Designs103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Core Scaffold SystemsScaffold2107/08/2026
Allstate Sprinklerspecialty_contractor1011/14/2026
S & J IndustrialFire Protection607/08/2026
Glenco Contracting GroupScaffold603/21/2026
Kenco Self Storage Services IGeneral Contractor511/08/2026
Consolidated ScaffoldingScaffold407/08/2026
Alba ServicesScaffold407/08/2026
Marine Plumbing & MechanicalPlumbing307/08/2026
Cauldwell Wingatespecialty_contractor307/08/2026
Cauldwell WingateGeneral Contractor203/22/2026
V. Vass ElectricElectrical203/22/2026
G & M WorksGeneral Contractor203/21/2026
Cauldwell WingateScaffold203/21/2026
Jseo StudioGeneral Contractor203/21/2026
Green Power ElectricElectrical103/22/2026
Accurate MechanicalFire Protection107/08/2026
Agir Electrical Ltd D/B/AElectrical103/22/2026
Lakhi General ContractorScaffold107/08/2026
Balaton ConsultingSign hanger107/08/2026
Cala/Sacco MechinicalPlumbing109/01/2010
Mega Fire ProtectionFire Protection109/07/2010
Mega Fire ProtectionGeneral Contractor109/17/2010
N.S. Famous ConstructionGeneral Contractor210/29/2010
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Whitestone Associates Engineering8144809/16/2026
MJ Engineering & Design55461401/02/2024
Building Lifecycle
11/13/2026
Permit issued — Sprinklers
M01460144-S1-EW-SP
11/06/2026
Permit issued — General Construction
M01460144-I1-GC
09/16/2026
Filed — Alteration
Cut back existing sprinkler heads serving lower storage units that are no longer needed. Cut and Cap piping only. No new sprinkler heads or piping to be installed.
M01460144-I1
09/16/2026
Filed — Alteration
Cut back existing sprinkler heads serving lower storage units that are no longer needed. Cut and Cap piping only. No new sprinkler heads or piping to be installed.
M01460144-S1
09/15/2026
Special inspection requirement — Sprinkler Systems
Mudar Khantamr
202 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersPermit IssuedAllstate Sprinkler11/13/2026
DOB NOWGeneral ConstructionPermit IssuedKenco Self Storage Services I11/06/2026
DOB NOWSprinklersSigned-offAllstate Sprinkler03/31/2025
DOB NOWGeneral ConstructionSigned-offKenco Self Storage Services I03/27/2025
DOB NOWSprinklersSigned-offAllstate Sprinkler11/07/2024
DOB NOWGeneral ConstructionSigned-offKenco Self Storage Services I11/01/2024
DOB NOWSprinklersSigned-offAccurate Mechanical02/16/2024
DOB NOWProtection and Mechanical MethodsSigned-offCore Scaffold Systems03/29/2023
DOB NOWProtection and Mechanical MethodsSigned-offCore Scaffold Systems03/29/2023
DOB NOWConstruction FenceSigned-offCore Scaffold Systems03/17/2023
DOB NOWCurb CutSigned-offG M Works02/24/2023
DOB NOWSidewalk ShedSigned-offCore Scaffold Systems02/09/2023
DOB NOWProtection and Mechanical MethodsSigned-offCore Scaffold Systems01/30/2023
DOB NOWSignSigned-offNorth Shore Neon Sign12/05/2022
DOB NOWPlumbingSigned-offMarine Plumbing & Mechanical10/06/2022
DOB NOWBoiler EquipmentSigned-offJack Piccini09/05/2022
DOB NOWProtection and Mechanical MethodsSigned-offCore Scaffold Systems07/13/2022
DOB NOWMechanical SystemsSigned-offCauldwell Wingate06/30/2022
DOB NOWSprinklersSigned-offS & J Industrial05/26/2022
DOB NOWStandpipeSigned-offS & J Industrial05/26/2022
DOB NOWStandpipeSigned-offS & J Industrial05/26/2022
DOB NOWProtection and Mechanical MethodsSigned-offCore Scaffold Systems04/01/2022
DOB NOWProtection and Mechanical MethodsSigned-offCore Scaffold Systems04/01/2022
DOB NOWConstruction FenceSigned-offCore Scaffold Systems04/01/2022
DOB NOWProtection and Mechanical MethodsSigned-offGlenco Contracting Group03/25/2022
DOB NOWProtection and Mechanical MethodsSigned-offGlenco Contracting Group03/25/2022
DOB NOWProtection and Mechanical MethodsSigned-offCore Scaffold Systems02/22/2022
DOB NOWSidewalk ShedSigned-offCore Scaffold Systems02/10/2022
DOB NOWPlumbingSigned-offMarine Plumbing & Mechanical01/24/2022
DOB NOWStandpipeSigned-offS & J Industrial10/08/2021
DOB NOWSprinklersSigned-offS & J Industrial10/08/2021
DOB NOWPlumbingSigned-offMarine Plumbing & Mechanical10/07/2021
DOB NOWConstruction FenceSigned-offCauldwell Wingate07/30/2021
DOB NOWMechanical SystemsSigned-offCauldwell Wingate07/02/2021
DOB NOWStandpipeSigned-offS & J Industrial06/18/2021
DOB NOWConstruction FenceSigned-offAlba Services04/05/2021
DOB NOWConstruction FenceSigned-offAlba Services03/22/2021
DOB NOWConstruction FenceSigned-offAlba Services02/04/2021
DOB NOWSupported ScaffoldSigned-offConsolidated Scaffolding11/24/2020
DOB NOWSidewalk ShedSigned-offConsolidated Scaffolding11/24/2020
+ 27 more permits on file
1 project · most recent 09/16/2026
Sprinkler System
FiledStatusContractorScope
09/16/2026Permit IssuedAllstate SprinklerSprinkler System
12 projects · most recent 10/27/2023
General Wiring
FiledStatusContractorScope
10/27/2023CompleteKnight Electrical ServiceGeneral Wiring
03/24/2023CompleteCity Electrical Sign Erectors—
12/07/2022CompleteAgir Electrical Ltd D/B/AGeneral Wiring
09/07/2022CompleteAgir Electrical Ltd D/B/A—
07/28/2022CompleteSolas Electrical—
07/28/2022CompleteSolas Electrical—
07/22/2022CompleteAgir Electrical Ltd D/B/AGeneral Wiring
02/15/2022CompleteV. Vass Electric—
02/09/2022CompleteV. Vass Electric—
07/22/2021CompleteAgir Electrical Ltd D/B/A—
11/17/2020CompleteV. Vass Electric—
04/01/2019Permit IssuedGreen Power Electric—
▾Field Inspections (DOB CAP) — 24
DateTypeResultReport
08/27/2025Pass-Final General Construction Non-Directive 14PassView ↗
07/17/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/14/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/14/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/28/2025Pass-Final General Construction Non-Directive 14PassView ↗
02/12/2025Fail-Final General Construction Non-Directive 14FailView ↗
01/21/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/16/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/16/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/20/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/05/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
06/05/2023Pass-Final SD - Up to 3 Requested FloorsPassView ↗
06/02/2023Pass-Final SD - More than 10 Requested FloorsPassView ↗
05/23/2023Pass-Final SD - More than 10 Requested FloorsPassView ↗
05/02/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/11/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/29/2023Fail-Final SD - Fire PumpFailView ↗
03/22/2023Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
03/15/2023Pass-Final Boiler Equipment InspectionPassView ↗
09/29/2022Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
09/29/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/02/2022Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
05/03/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/31/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 108
DateRequirementInspectorRole
09/15/2026Sprinkler SystemsMudar Khantamrspecial
03/10/2025Sprinkler SystemsMudar Khantamrspecial
02/26/2025Sprinkler SystemsKevin Feathspecial
02/11/2025Sprinkler SystemsKevin Feathspecial
01/11/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationMagdy Youssefspecial
01/11/2024Fire-Resistant Penetrations and JointsMagdy Youssefspecial
01/11/2024Energy Code Compliance InspectionsMagdy Youssefprogress
01/11/2024HVAC-R and service water piping design and insulationMagdy Youssefenergy_progress
01/11/2024HVAC-R and service water heating equipmentMagdy Youssefenergy_progress
01/11/2024HVAC-R and service water heating system controlsMagdy Youssefenergy_progress
01/11/2024Maintenance informationMagdy Youssefenergy_progress
01/11/2024Standpipe SystemsMagdy Youssefspecial
01/11/2024Sprinkler SystemsMagdy Youssefspecial
01/11/2024Post-installed AnchorsMagdy Youssefspecial
12/21/2023Sprinkler SystemsMagdy Youssefspecial
12/21/2023Maintenance informationMagdy Youssefenergy_progress
12/21/2023Standpipe SystemsMagdy Youssefspecial
12/21/2023Energy Code Compliance InspectionsMagdy Youssefprogress
12/21/2023HVAC-R and service water heating system controlsMagdy Youssefenergy_progress
12/21/2023HVAC-R and service water heating equipmentMagdy Youssefenergy_progress
12/21/2023HVAC-R and service water piping design and insulationMagdy Youssefenergy_progress
12/21/2023Post-installed AnchorsMagdy Youssefspecial
12/21/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationMagdy Youssefspecial
12/21/2023Fire-Resistant Penetrations and JointsMagdy Youssefspecial
10/24/2023Standpipe SystemsMagdy Youssefspecial
Latest 25 of 108.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
W29TH Street Self-storageIndustrial / WarehouseSub-cellar, Cellar, Floors 1–17, Roof
Project M01460144 Alteration · Permit Entire · 09/16/2026
Project M01192455 Alteration · LOC Issued · 03/21/2025
Project M01192486 Alteration · LOC Issued · 03/21/2025
Project M01122791 Alteration · LOC Issued · 10/15/2024
Project M01122810 Alteration · LOC Issued · 10/15/2024
Project M00570803 Alteration · LOC Issued · 09/27/2021
Project M00466871 Alteration · LOC Issued · 04/30/2021
Project M00447245 Alteration · LOC Issued · 04/22/2021
Public StorageIndustrial / WarehouseFloor 1
Project M08030766 Alteration · LOC Issued · 12/02/2022
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
578 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account