Other college and university
LC. McMahon Hall
155 WEST 60 STREET · Upper West Side-Lincoln Square · BIN 1085404
💬 Discuss this project
1950Year Built
20Stories
W6Building Class
C4-7Zoning
1,025,320 sfGross Floor Area
212Units
LL97 CoveredRent Stabilized4 Open Violations 1 unresolved · 3 paperwork only ▸FISP: SAFE
Other college and university · Owner of record: FORDHAM UNIVERSITY · 194,620 sf lot · 5.27 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Permit Issued — active, not yet Signed-off
RoofUnder Construction13p · 3 filings · 20 docs
Floor 20Under Construction8p · 1 filing · 16 docs
Floor 19
Floor 18
Floor 17
Floor 16
Floor 15
Floor 14
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 26p · 1 filing · 20 docs
Floor 1Under Construction9p · 1 filing · 16 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
FORDHAM UNIVERSITY3807/31/2026
OWNER OF 155 WEST 60 S103/22/2026
MORELLI MASOWG INC.103/22/2026
MRH CONSTRUCTION INC.103/22/2026
RELATED COMPANIES103/22/2026
LINCOLN CENTER103/21/2026
SHAH BUILDERS303/21/2026
SKYWORX CONTRACTING303/21/2026
FORDHMAN103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NYCCODE1403/21/2026
AE DESIGN SOLUTION203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RFA HUDSON INCGeneral Contractor1803/21/2026
TRANE U.S. INCGeneral Contractor207/31/2026
JEPOL CONSTRUCTION INCGeneral Contractor204/09/2026
FLORES, HECTORElectrical103/21/2026
RICHARD NEUElectrical103/21/2026
MACKLER MASTER FIRE INCFire Protection107/08/2026
ARSENAL SCAFFOLD INCGeneral Contractor107/08/2026
PHOENIX SUTTON STR INCGeneral Contractor104/09/2026
BLASKOVIC, ALDOElectrical103/21/2026
CARDOZA PLUMBING CORPPlumbing107/08/2026
CARMINE LIPPOLISElectrical103/21/2026
E-J ELEC. INSTALLATION COElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
FENAGH, INC6942207/23/2026
DELTA TESTING LABS687706/20/2025
Building Lifecycle
All (112)Filed (13)Permit Issued (14)Signed Off (8)Facade (FISP) (13)Violation (24)Inspection (8)Objection (2)Special Inspection (30)
07/30/2026
Permit issued — Structural
M01411139-S1-ST
07/28/2026
Permit issued — Mechanical Systems
M01411139-I1-MS
07/23/2026
Filed — Alteration
structural modifications as shown on plans
M01411139-S1
07/20/2026
Filed — Alteration
structural modifications as shown on plans
M01411139-I1
07/10/2026
Special inspection requirement — Tenant Protection Plan Compliance
AILANTO DANIEL MINAWI
07/10/2026
Special inspection requirement — Tenant Protection Plan Compliance
AILANTO DANIEL MINAWI
06/30/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
AILANTO DANIEL MINAWI
06/30/2026
Special inspection requirement — Energy Code Compliance Inspections
AILANTO DANIEL MINAWI
06/11/2026
Special inspection requirement — Post-installed Anchors
AILANTO DANIEL MINAWI
06/11/2026
Special inspection requirement — Duct leakage testing, insulation and design
AILANTO DANIEL MINAWI
06/11/2026
Special inspection requirement — Ventilation and air distribution system
AILANTO DANIEL MINAWI
06/02/2026
Special inspection requirement — Final
AILANTO DANIEL MINAWI
06/02/2026
Special inspection requirement — Mechanical Systems
AILANTO DANIEL MINAWI
06/02/2026
Special inspection requirement — Final
AILANTO DANIEL MINAWI
01/20/2026
Cycle 10 facade report submitted
01/20/2026
Cycle 10 facade report signed — SAFE
01/16/2026
Signed off — Alteration
McMahon Hall- FISP Cycle 8C Repairs, facade repairs including removal and replacement of cracked and spalled brick, replacement of deteriorated mortar joints, and miscellaneous concrete crack repairs. No change of use, egress or occupancy.
M01226187-I1
12/17/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M01249310-I1
12/17/2025
Cycle 10 facade inspection completed
12/01/2025
Signed off — Alteration
FACADE RESTORATION / INSPECTIONS
M01258448-I1
08/06/2025
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M01249310-P1
07/30/2025
Permit issued — General Construction
M01226187-I1-GC
07/22/2025
Permit issued — Suspended Scaffold
M01258448-I1-SC
07/22/2025
Objection raised — Admin
07/22/2025
Objection resolved — Addressed
07/19/2025
Filed — Alteration
FACADE RESTORATION / INSPECTIONS
M01258448-I1
07/09/2025
Permit issued — Sidewalk Shed
M01249310-I1-SH
07/08/2025
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M01249310-I1
06/20/2025
Filed — Alteration
McMahon Hall- FISP Cycle 8C Repairs, facade repairs including removal and replacement of cracked and spalled brick, replacement of deteriorated mortar joints, and miscellaneous concrete crack repairs. No change of use, egress or occupancy.
M01226187-P1
06/18/2025
Special inspection requirement — Tenant Protection Plan Compliance
RICHARD GREENWALD
06/18/2025
Special inspection requirement — Final
Juan Kuriyama
06/09/2025
Filed — Alteration
McMahon Hall- FISP Cycle 8C Repairs, facade repairs including removal and replacement of cracked and spalled brick, replacement of deteriorated mortar joints, and miscellaneous concrete crack repairs. No change of use, egress or occupancy.
M01226187-I1
05/19/2025
Violation issued (ECB, open)
Local Law
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/22/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/22/2023
Signed off — Alteration
Plumbing and Sprinkler scope associated with the interior renovation of the existing Fitness Center at McMahon Hall. No change of use, egress or occupancy.
M00685046-I1
09/06/2023
Signed off — Alteration
Plumbing and Sprinkler scope associated with the interior renovation of the existing Fitness Center at McMahon Hall. No change of use, egress or occupancy.
M00685046-S1
06/27/2023
Signed off — Alteration
Plumbing and Sprinkler scope associated with the interior renovation of the existing Fitness Center at McMahon Hall. No change of use, egress or occupancy.
M00685046-S3
06/27/2023
Signed off — Alteration
Plumbing and Sprinkler scope associated with the interior renovation of the existing Fitness Center at McMahon Hall. No change of use, egress or occupancy.
M00685046-S2
05/24/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/17/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/16/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/10/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/10/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/21/2023
Permit issued — Mechanical Systems
M00685046-S1-MS
04/21/2023
Permit issued — General Construction
M00685046-I1-GC
04/21/2023
Permit issued — Structural
M00685046-S3-ST
03/02/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
02/27/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
01/23/2023
Permit issued — Structural
M00685046-S3-ST
12/09/2022
Filed — Alteration
Plumbing and Sprinkler scope associated with the interior renovation of the existing Fitness Center at McMahon Hall. No change of use, egress or occupancy.
M00685046-P2
12/09/2022
Special inspection requirement — Final
RICHARD GREENWALD
12/09/2022
Special inspection requirement — Structural Steel - High Strength Bolting
RICHARD GREENWALD
12/09/2022
Special inspection requirement — Structural Steel - Details
RICHARD GREENWALD
12/09/2022
Special inspection requirement — Post-installed Anchors
RICHARD GREENWALD
12/09/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
RICHARD GREENWALD
11/28/2022
Special inspection requirement — Structural Steel - High Strength Bolting
RICHARD GREENWALD
11/28/2022
Special inspection requirement — Post-installed Anchors
RICHARD GREENWALD
11/28/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
RICHARD GREENWALD
Latest 60 of 112 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit IssuedTRANE U.S. INC07/30/2026
DOB NOWMechanical SystemsPermit IssuedTRANE U.S. INC07/28/2026
DOB NOWGeneral ConstructionSigned-offHUDSON MERIDIAN CONST GP07/30/2025
DOB NOWSuspended ScaffoldSigned-offHUDSON MERIDIAN CONST GP07/22/2025
DOB NOWSidewalk ShedSigned-offPHOENIX SUTTON STR INC07/09/2025
DOB NOWMechanical SystemsSigned-offRFA HUDSON INC04/21/2023
DOB NOWGeneral ConstructionSigned-offRFA HUDSON INC04/21/2023
DOB NOWStructuralSigned-offRFA HUDSON INC04/21/2023
DOB NOWStructuralSigned-offRFA HUDSON INC01/23/2023
DOB NOWSprinklersSigned-offCARDOZA PLUMBING CORP06/14/2022
DOB NOWPlumbingSigned-offMACKLER MASTER FIRE INC06/07/2022
DOB NOWGeneral ConstructionSigned-offRFA HUDSON INC05/09/2022
DOB NOWMechanical SystemsSigned-offRFA HUDSON INC05/09/2022
DOB NOWSidewalk ShedSigned-offARSENAL SCAFFOLD INC01/24/2019
BISOTISSUEDJEPOL CONSTRUCTION INC06/11/2020
BISOTISSUEDR J GREEN CONSTRUCTI CORP03/24/2015
BISEQISSUEDSHAH BUILDERS INC04/30/2013
BISEQISSUEDSKYWORX CONTRACTING INC04/04/2013
BISOTISSUEDR J GREEN CONSTRUCTI CORP03/22/2013
BISEQISSUEDSHAH BUILDERS INC02/05/2013
BISOTISSUEDR J GREEN CONSTRUCTI CORP11/03/2012
BISEQISSUEDSKYWORX CONTRACTING INC09/28/2012
BISSDISSUEDHYDRO MECHANICAL INC05/29/2012
BISSPISSUEDHYDRO MECHANICAL INC03/03/2011
BISSDISSUEDHYDRO MECHANICAL INC03/03/2011
BISSDISSUEDHYDRO MECHANICAL INC12/24/2009
BISEQISSUEDOUTDOOR INSTALLATIONS LLC.11/16/2005
BISFSISSUEDMANHATTAN BOILER & EQUIPMENT02/10/2005
BISPLISSUEDASHLAND PLUMBING CORP08/20/2004
BISEQISSUEDOESTREICHER CONSTRUCTION08/03/2004
BISMHISSUEDOESTREICHER CONSTRUCTION08/03/2004
BIS—ISSUEDSCORCIA & DIANN ASSOCTS INC.03/01/2000
BISSPISSUEDGRINNELL FIRE PROTECTION11/22/1999
BISOTISSUEDSCORCIA & DIANA ASSOCIATES,INC.11/21/1996
BIS—ISSUEDH R H CONSTRUCTION CORP03/10/1995
BIS—ISSUEDH R H CONSTRUCTION CORP06/21/1994
BIS—ISSUEDH R H CONSTRUCTION CORP02/25/1993
BISSPISSUEDRAEL AUTOMATIC SPRINKLER CO INC11/13/1992
BIS—ISSUEDH R H CONSTRUCTION CORP05/20/1992
BISEQISSUEDHRH CONSTRUCTION05/20/1992
+ 11 more permits on file
1 project · most recent 07/23/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
07/23/2026Permit IssuedTRANE U.S. INCHeating and Air Conditioning Systems
Heat / Cool
Trane D015 3,300 CFM ×2
D030 6,470 CFM ×1
5 projects · most recent 06/12/2026
General Wiring
FiledStatusContractorScope
06/12/2026Permit IssuedMULTI-PHASE ELEC'L SVCSGeneral Wiring
07/09/2025CompleteRICHARD NEU—
03/31/2020CompleteE-J ELEC. INSTALLATION COGeneral Wiring
01/16/2019CompleteNASH ELECTRIC SERVICES IN—
06/14/2018Permit IssuedCONTROL SPEC ELECL SYSTEMGeneral Wiring
1 project · most recent 07/23/2026
FiledStatusContractorScope
07/23/2026Permit IssuedTRANE U.S. INC1 scope_items
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
05/24/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/17/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/16/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/10/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/10/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/02/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
02/27/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/04/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 35
DateRequirementInspectorRole
07/10/2026Tenant Protection Plan ComplianceAILANTO DANIEL MINAWIspecial
07/10/2026Tenant Protection Plan ComplianceAILANTO DANIEL MINAWIspecial
06/30/2026Fire-Resistant Penetrations and JointsAILANTO DANIEL MINAWIspecial
06/30/2026Energy Code Compliance InspectionsAILANTO DANIEL MINAWIprogress
06/11/2026Post-installed AnchorsAILANTO DANIEL MINAWIspecial
06/11/2026Duct leakage testing, insulation and designAILANTO DANIEL MINAWIenergy_progress
06/11/2026Ventilation and air distribution systemAILANTO DANIEL MINAWIenergy_progress
06/02/2026FinalAILANTO DANIEL MINAWIprogress
06/02/2026Mechanical SystemsAILANTO DANIEL MINAWIspecial
06/02/2026FinalAILANTO DANIEL MINAWIprogress
06/18/2025Tenant Protection Plan ComplianceRICHARD GREENWALDspecial
06/18/2025FinalJuan Kuriyamaprogress
12/09/2022FinalRICHARD GREENWALDprogress
12/09/2022Structural Steel - High Strength BoltingRICHARD GREENWALDspecial
12/09/2022Structural Steel - DetailsRICHARD GREENWALDspecial
12/09/2022Post-installed AnchorsRICHARD GREENWALDspecial
12/09/2022Structural Stability – Alterations of existing buildingsRICHARD GREENWALDspecial
11/28/2022Structural Steel - High Strength BoltingRICHARD GREENWALDspecial
11/28/2022Post-installed AnchorsRICHARD GREENWALDspecial
11/28/2022Structural Stability – Alterations of existing buildingsRICHARD GREENWALDspecial
11/28/2022Structural Steel - DetailsRICHARD GREENWALDspecial
11/28/2022FinalRICHARD GREENWALDprogress
04/25/2022HVAC-R and service water heating system controlsRICHARD GREENWALDenergy_progress
04/25/2022Duct leakage testing, insulation and designRICHARD GREENWALDenergy_progress
04/25/2022HVAC-R and service water piping design and insulationRICHARD GREENWALDenergy_progress
Latest 25 of 35.
▾Documents — 174 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch10
09/01/2026M00685046-S3Request digital key ↗
09/01/2026M00685046-S2Request digital key ↗
09/01/2026M00685046-S1Request digital key ↗
Showing 3 of 10 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/05/2026M00120535-I1Request digital key ↗
▸Applications & Permits18
▸BISPLAN / WORK APPROVAL APPLICATION10
05/20/2020140902771Open ↗
05/08/2019123828867Open ↗
04/26/2019123828867Open ↗
Showing 3 of 10 on file for this type
▸BISWORK PERMIT APPLICATION8
06/11/2020140902771Open ↗
03/28/2015122091057Open ↗
05/07/2013121524724Open ↗
Showing 3 of 8 on file for this type
▸Seals & Professional Certifications63
▸DOB NOWProgress Inspector Seal & Signature18
09/29/2026M00120535-I1Open ↗
08/30/2026M01411139-S1Open ↗
08/29/2026M01226187-P1Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature17
08/30/2026M01411139-S1Open ↗
08/29/2026M01226187-P1Open ↗
08/28/2026M00685046-I1Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
09/01/2026M00685046-S2Open ↗
09/01/2026M00685046-S1Open ↗
09/01/2026M00685046-I1Open ↗
Showing 3 of 10 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION7
07/25/2016122091057Open ↗
03/28/2015122091057Open ↗
08/07/2014122091057Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST6
03/25/2015122091057Open ↗
03/23/2015122091057Open ↗
08/07/2014122091057Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
02/07/2013121524724Open ↗
10/10/2012121397988Open ↗
09/28/2012121390707Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
05/20/2020140902771Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
08/07/2014122091057Open ↗
▸Trade Schedules & Equipment1
▸BISFA - FDNY APPROVAL : FD-FAA1
09/03/2020123828867Open ↗
▸Environmental & Asbestos19
▸DOB NOWOER: Notice to Proceed7
08/13/2026M00685046-S3Open ↗
08/13/2026M00685046-S2Open ↗
08/13/2026M00120535-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWOER: Notice of Satisfaction6
08/13/2026M01226187-I1Open ↗
08/13/2026M00685046-S3Open ↗
08/13/2026M00685046-S1Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
03/17/2015122091057Open ↗
08/07/2014122091057Open ↗
10/10/2012121397988Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION2
04/21/2021140902771Open ↗
09/14/2020123828867Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED1
05/20/2020140902771Open ↗
▸Energy Compliance12
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
07/25/2016122091057Open ↗
03/28/2015122091057Open ↗
08/07/2014122091057Open ↗
Showing 3 of 5 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
07/25/2016122091057Open ↗
12/03/2013121397988Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
06/08/2020140902771Open ↗
05/20/2020140902771Open ↗
▸DOB NOWEN2: As Built Energy Analysis2
08/13/2026M00685046-I1Open ↗
08/13/2026M00685046-S1Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
04/21/2021140902771Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY3
04/21/2021140902771Open ↗
06/08/2020140902771Open ↗
05/20/2020140902771Open ↗
▸Approvals, Objections & Sign-offs22
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter10
09/01/2026M00685046-I1Open ↗
09/01/2026M00685046-S3Open ↗
09/01/2026M00685046-S2Open ↗
Showing 3 of 10 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
04/21/2021140902771Open ↗
09/14/2020123828867Open ↗
07/25/2016122091057Open ↗
Showing 3 of 5 on file for this type
▸BISADMINISTRATIVE OBJECTIONS3
02/07/2013121524724Open ↗
10/10/2012121397988Open ↗
09/28/2012121390707Open ↗
▸BISSHED LETTER2
05/07/2013121524724Open ↗
04/10/2013121390707Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
04/21/2021140902771Open ↗
07/25/2016122091057Open ↗
▸Cost, Insurance & Ownership9
▸BISCOST AFFIDAVIT7
06/08/2020140902771Open ↗
05/20/2020140902771Open ↗
03/15/2019123828867Open ↗
Showing 3 of 7 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
04/21/2021140902771Open ↗
09/14/2020123828867Open ↗
▸Filing & Intake Forms9
▸BISEFILING COVER SHEET5
03/15/2019123828867Open ↗
08/07/2014122091057Open ↗
02/07/2013121524724Open ↗
Showing 3 of 5 on file for this type
▸BISADDITIONAL INFORMATION3
12/22/2020140902771Open ↗
10/22/2020140902771Open ↗
06/08/2020140902771Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
05/20/2020140902771Open ↗
▸Other Documents7
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
03/15/2019123828867Open ↗
08/07/2014122091057Open ↗
▸DOB NOWFee Exempt Supporting Document - DOF Property Tax Assessment Roll2
08/13/2026M01249310-I1Open ↗
08/13/2026M01249310-P1Open ↗
▸BISSupporting Document: Fee Exempt1
05/20/2020140902771Open ↗
▸DOB NOWCalculations1
08/13/2026M01258448-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026M01258448-I1Open ↗