← Back
Other college and university
LC. Law School/McKeon Hall
155 WEST 60 STREET · Upper West Side-Lincoln Square · BIN 1090920
💬 Discuss this project
1950Year Built
20Stories
W6Building Class
C4-7Zoning
1,025,320 sfGross Floor Area
212Units
LL97 CoveredRent Stabilized4 Open Violations 1 unresolved · 3 paperwork only ▸FISP: No Report FiledFDNY Report ↗
Other college and university · Owner of record: FORDHAM UNIVERSITY · 194,620 sf lot · 5.27 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingFire ProtectionGeneral
Floor 51p · 1 filing · 20 docs
Floor 4
Floor 31p · 1 filing · 20 docs
Floor 21p · 1 filing · 6 docs
Floor 11p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BENSON INDUSTRIES303/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NAPACH DESIGN GROUP204/30/2026
ADS ENGINEERS506/27/2023
JACK L. GORDON ARCHITECTS, PC104/14/2022
BIANCA V. SKVIRSKY, PE108/19/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NYCCODE1403/21/2026
LOUIS STRIAR203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RFA HUDSON INCGeneral Contractor603/21/2026
IDEAL INTERIORS GROUP LLCGeneral Contractor307/08/2026
MAMAIS CONTRACTING CORPGeneral Contractor107/08/2026
CARDOZA PLUMBING CORPPlumbing107/08/2026
PELHAM PLUMBING & HTG CORPPlumbing107/08/2026
ANTHONY MANNElectrical103/21/2026
Z-CAR-DScaffold107/08/2026
MACKLER MASTER FIRE INCFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
FENAGH, INC6942104/30/2026
DELTA TESTING LABS687706/27/2023
Building Lifecycle
All (60)Filed (10)Permit Issued (9)Signed Off (7)Facade (FISP) (2)Violation (8)Inspection (7)Special Inspection (17)
06/30/2026
Violation issued (ECB, open)
Construction
06/02/2026
Cycle 10 facade report submitted
05/14/2026
Cycle 10 facade inspection completed
05/11/2026
Permit issued — General Construction
M01394437-I1-GC
04/30/2026
Filed — Alteration
interior renovation of the existing cafe space to accommodate THE DROP EATERY as shown on plans filed herewith. No change to use, egress or occupancy.
M01394437-I1
04/29/2026
Special inspection requirement — Final
AILANTO DANIEL MINAWI
04/29/2026
Special inspection requirement — Tenant Protection Plan Compliance
AILANTO DANIEL MINAWI
04/29/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
AILANTO DANIEL MINAWI
01/06/2026
Filed — Alteration
facade inspection
M01341873-I1
05/19/2025
Violation issued (ECB, open)
Local Law
03/26/2025
Violation issued (FDNY_ORDER, closed)
02/22/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/07/2023
Signed off — Alteration
Plumbing and Sprinkler scope associated with the renovation of the existing Employee Lounge at Fordham Law School. No change of use, egress or occupancy.
M00708169-S2
06/30/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/27/2023
Filed — Alteration
Plumbing and Sprinkler scope associated with the renovation of the existing Employee Lounge at Fordham Law School. No change of use, egress or occupancy.
M00708169-P1
06/14/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
RICHARD GREENWALD
06/14/2023
Special inspection requirement — Sprinkler Systems
RICHARD GREENWALD
05/04/2023
Signed off — Alteration
Plumbing and Sprinkler scope associated with the renovation of the existing Employee Lounge at Fordham Law School. No change of use, egress or occupancy.
M00708169-S1
05/04/2023
Signed off — Alteration
Plumbing and Sprinkler scope associated with the renovation of the existing Employee Lounge at Fordham Law School. No change of use, egress or occupancy.
M00708169-I1
05/04/2023
Signed off — Alteration
Plumbing scope, including the new sink installation and piping associated with the new lactation room at Fordham Law School. No change of use, egress or occupancy.
M00754038-I1
05/04/2023
Signed off — Alteration
Plumbing scope, including the new sink installation and piping associated with the new lactation room at Fordham Law School. No change of use, egress or occupancy.
M00754038-S2
05/04/2023
Signed off — Alteration
Plumbing scope, including the new sink installation and piping associated with the new lactation room at Fordham Law School. No change of use, egress or occupancy.
M00754038-S1
03/09/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
03/06/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
02/23/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/03/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/23/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/18/2022
Permit issued — Mechanical Systems
M00754038-S1-MS
08/10/2022
Permit issued — General Construction
M00754038-I1-GC
08/10/2022
Permit issued — Plumbing
M00754038-S2-PL
08/05/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/24/2022
Filed — Alteration
Plumbing scope, including the new sink installation and piping associated with the new lactation room at Fordham Law School. No change of use, egress or occupancy.
M00754038-S2
06/24/2022
Filed — Alteration
Plumbing scope, including the new sink installation and piping associated with the new lactation room at Fordham Law School. No change of use, egress or occupancy.
M00754038-S1
06/24/2022
Special inspection requirement — Mechanical Systems
RICHARD GREENWALD
06/24/2022
Special inspection requirement — Final
RICHARD GREENWALD
06/24/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
RICHARD GREENWALD
06/23/2022
Filed — Alteration
Plumbing scope, including the new sink installation and piping associated with the new lactation room at Fordham Law School. No change of use, egress or occupancy.
M00754038-I1
06/22/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
RICHARD GREENWALD
06/16/2022
Special inspection requirement — Final
RICHARD GREENWALD
05/19/2022
Permit issued — Plumbing
M00708169-S2-EW-SP
05/17/2022
Permit issued — Plumbing
M00708169-S2-PL
05/05/2022
Permit issued — General Construction
M00708169-I1-GC
05/05/2022
Permit issued — Mechanical Systems
M00708169-S1-MS
04/20/2022
Filed — Alteration
Plumbing and Sprinkler scope associated with the renovation of the existing Employee Lounge at Fordham Law School. No change of use, egress or occupancy.
M00708169-S2
04/20/2022
Filed — Alteration
Plumbing and Sprinkler scope associated with the renovation of the existing Employee Lounge at Fordham Law School. No change of use, egress or occupancy.
M00708169-S1
04/14/2022
Filed — Alteration
Plumbing and Sprinkler scope associated with the renovation of the existing Employee Lounge at Fordham Law School. No change of use, egress or occupancy.
M00708169-I1
04/14/2022
Special inspection requirement — Mechanical Systems
RICHARD GREENWALD
04/14/2022
Special inspection requirement — Final
RICHARD GREENWALD
04/14/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
RICHARD GREENWALD
04/14/2022
Special inspection requirement — Fire-Resistance Rated Construction
RICHARD GREENWALD
04/14/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
RICHARD GREENWALD
03/29/2022
Special inspection requirement — Final
RICHARD GREENWALD
10/18/2021
Signed off — Alteration
ILLUMINATED NON ADVERTISING DOUBLE SIDED PROJECTING ACCESSORY SIGN - SVK FOOD HALL. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
M00572291-I1
08/24/2021
Permit issued — Sign
M00572291-I1-SG
08/19/2021
Filed — Alteration
ILLUMINATED NON ADVERTISING DOUBLE SIDED PROJECTING ACCESSORY SIGN - SVK FOOD HALL. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
M00572291-I1
08/19/2021
Special inspection requirement — Final
BIANCA SKVIRSKY
05/01/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/01/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/01/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/01/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offMAMAIS CONTRACTING CORP05/11/2026
DOB NOWMechanical SystemsSigned-offIDEAL INTERIORS GROUP LLC08/18/2022
DOB NOWGeneral ConstructionSigned-offIDEAL INTERIORS GROUP LLC08/10/2022
DOB NOWPlumbingSigned-offPELHAM PLUMBING & HTG COR08/10/2022
DOB NOWPlumbingSigned-offMACKLER MASTER FIRE INC05/19/2022
DOB NOWPlumbingSigned-offCARDOZA PLUMBING CORP05/17/2022
DOB NOWGeneral ConstructionSigned-offRFA HUDSON INC05/05/2022
DOB NOWMechanical SystemsSigned-offRFA HUDSON INC05/05/2022
DOB NOWSignSigned-offZ-CAR-D CORP08/24/2021
BIS—ISSUEDIDEAL INTERIORS GROUP LLC04/19/2019
BISSPISSUEDFULL CAPACITY FIRE CORP10/31/2018
BISPLISSUEDBEDROCK PLBG. & HTG., INC07/26/2018
BISMHISSUEDIDEAL INTERIORS GROUP LLC07/24/2018
BISOTISSUEDIDEAL INTERIORS GROUP LLC07/24/2018
BISEQISSUEDKING HOIST & SCAFFOLDING06/01/2015
BISPLISSUEDCARDOZA PLUMBING CORP02/26/2015
BIS—ISSUEDNORTH SHORE NEON SIGN CO02/17/2015
BISOTISSUEDC.W. BROWN INC02/12/2015
BISOTISSUEDC.W. BROWN INC02/12/2015
BISMHISSUEDC.W. BROWN INC02/12/2015
BISOTISSUEDC.W. BROWN INC02/12/2015
BISOTISSUEDSTAMFORD TENT & EQUIP CO09/05/2014
BISPLISSUEDCARDOZA PLUMBING CORP08/08/2014
BISFPISSUEDUNITED FIRE PROT CORP04/28/2014
BIS—ISSUEDGOTHAM CONSTRUCTION CO.LL12/04/2013
BISFSISSUEDMANHATTAN BOILER & EQUIP10/31/2013
BISBLISSUEDFIRST CHOICE PLUMBING COR10/10/2013
BISEQISSUEDUNIVERSAL BUILD SUPP LLC09/30/2013
BISOTISSUEDGOTHAM CONSTRUCTION CO.LL09/27/2013
BISEQISSUEDUNIVERSAL BUILD SUPP LLC09/16/2013
BISFPISSUEDFIREMASTERS07/30/2013
BISPLISSUEDCARDOZA PLUMBING CORP06/17/2013
BIS—ISSUEDGOTHAM CONSTRUCTION CO.LL05/17/2013
BISSPISSUEDPACE PLUMBING CORP03/27/2013
BISSDISSUEDPACE PLUMBING CORP03/27/2013
BISPLISSUEDCARDOZA PLUMBING CORP01/21/2013
BISEQISSUEDBENSON INDUSTRIES LLC01/15/2013
BISCCISSUEDJCC CONSTRUCTION CORP01/11/2013
BIS—ISSUEDGOTHAM CONSTRUCTION CO.LL11/27/2012
BISEQISSUEDUNIVERSAL BUILD SUPP LLC09/19/2012
+ 19 more permits on file
3 projects · most recent 05/17/2026
General Wiring
FiledStatusContractorScope
05/17/2026Permit IssuedRND ELECTRIC CORPGeneral Wiring
05/30/2025Permit IssuedE-J ELEC. INSTALLATION COGeneral Wiring
11/18/2021Permit IssuedISLAND ELECTRIC CORP—
1 project · most recent 01/06/2026
FiledStatusContractorScope
01/06/2026———
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
06/30/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/09/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/06/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/23/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/03/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/23/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/05/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 17
DateRequirementInspectorRole
04/29/2026FinalAILANTO DANIEL MINAWIprogress
04/29/2026Tenant Protection Plan ComplianceAILANTO DANIEL MINAWIspecial
04/29/2026Fire-Resistant Penetrations and JointsAILANTO DANIEL MINAWIspecial
06/14/2023Fire-Resistant Penetrations and JointsRICHARD GREENWALDspecial
06/14/2023Sprinkler SystemsRICHARD GREENWALDspecial
06/24/2022Mechanical SystemsRICHARD GREENWALDspecial
06/24/2022FinalRICHARD GREENWALDprogress
06/24/2022Fire-Resistant Penetrations and JointsRICHARD GREENWALDspecial
06/22/2022Fire-Resistant Penetrations and JointsRICHARD GREENWALDspecial
06/16/2022FinalRICHARD GREENWALDprogress
04/14/2022Mechanical SystemsRICHARD GREENWALDspecial
04/14/2022FinalRICHARD GREENWALDprogress
04/14/2022Fire-Resistant Penetrations and JointsRICHARD GREENWALDspecial
04/14/2022Fire-Resistance Rated ConstructionRICHARD GREENWALDprogress
04/14/2022Fire-Resistant Penetrations and JointsRICHARD GREENWALDspecial
03/29/2022FinalRICHARD GREENWALDprogress
08/19/2021FinalBIANCA SKVIRSKYprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
SVK Food HallRestaurant / Food ServiceFloors 1–5
Project M00572291 Alteration · LOC Issued · 08/19/2021
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 881 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
09/03/2026M00572291-I1Request digital key ↗
09/02/2026M00708169-P1Request digital key ↗
09/02/2026M00708169-I1Request digital key ↗
Showing 3 of 10 on file for this type
▸Applications & Permits205
▸BISPLAN / WORK APPROVAL APPLICATION102
10/02/2020120203751Open ↗
09/30/2020120203751Open ↗
09/10/2020120203751Open ↗
Showing 3 of 102 on file for this type
▸BISWORK PERMIT APPLICATION55
04/22/2019120203751Open ↗
10/31/2018123184972Open ↗
07/30/2018123184972Open ↗
Showing 3 of 55 on file for this type
▸BISPLACE OF ASSEMBLY45
06/04/2016121707947Open ↗
06/04/2016121714430Open ↗
06/02/2016121714430Open ↗
Showing 3 of 45 on file for this type
▸BISPLACE OF ASSEMBLY APPLICATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISAFTER-HOUR WORK PERMIT APPLICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Zoning, Tax Lot & Property Records5
▸BISVERIFY TAX LOT1
09/24/2020120203751Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
11/05/2020120203751Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
10/09/2020120203751Open ↗
▸BISZONING DIAGRAM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISZoning Diagram (ZD1)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications179
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION125
01/17/2019123184972Open ↗
01/17/2019123184972Open ↗
11/20/2018123184972Open ↗
Showing 3 of 125 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST10
07/23/2018123184972Open ↗
06/10/2015122420512Open ↗
Showing 2 of 10 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT10
07/24/2018123184972Open ↗
07/23/2018123184972Open ↗
06/10/2015122420512Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
09/01/2026M00708169-I1Open ↗
09/01/2026M00754038-I1Open ↗
08/28/2026M00754038-S1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
09/03/2026M00572291-I1Open ↗
09/02/2026M00708169-P1Open ↗
09/02/2026M00708169-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
09/01/2026M00708169-I1Open ↗
09/01/2026M00708169-I1Open ↗
09/01/2026M00754038-I1Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment69
▸BISSELF-CERT PLUMBING NOTICE33
07/14/2015120203779Open ↗
07/06/2015122219722Open ↗
04/29/2015120203779Open ↗
Showing 3 of 33 on file for this type
▸BISSCHEDULE B - PLUMBING15
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 15 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA12
10/08/2019123431081Open ↗
10/03/2019123431081Open ↗
08/07/2019120841633Open ↗
Showing 3 of 12 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE5
02/15/2019121773688Open ↗
07/24/2018123184972Open ↗
Showing 2 of 5 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT2
08/10/2018120203751Open ↗
08/10/2018120203751Open ↗
▸Safety & Tenant Protection5
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISSTREET TREE CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSTREET TREE SIGNOFF1
09/24/2020120203751Open ↗
▸Environmental & Asbestos43
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER18
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 18 on file for this type
▸BISASBESTOS-EXEMPTION (ASB4)11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸DOB NOWOER: Notice to Proceed7
09/03/2026M00572291-I1Open ↗
09/02/2026M00708169-I1Open ↗
09/02/2026M00708169-S1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWOER: Notice of Satisfaction6
09/02/2026M00708169-I1Open ↗
09/02/2026M00708169-S1Open ↗
09/02/2026M00708169-S2Open ↗
Showing 3 of 6 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED1
07/24/2018123184972Open ↗
▸Energy Compliance22
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS16
01/17/2019123184972Open ↗
07/24/2018123184972Open ↗
07/24/2018123184972Open ↗
Showing 3 of 16 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS4
01/17/2019123184972Open ↗
11/17/2015121557396Open ↗
07/24/2015122219722Open ↗
Showing 3 of 4 on file for this type
▸BISTR8: Energy Code Progress Inspections2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Inspections & Test Reports14
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT: SOIL INSPECTION3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISNOTIF.-PROPOSED STEAM/HOT WATER INSPECTION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs157
▸BISLETTERS - SUPPORTING DOCUMENTATION52
11/26/2019120203751Open ↗
11/26/2019120203751Open ↗
01/17/2019123184972Open ↗
Showing 3 of 52 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST48
11/05/2020120203751Open ↗
10/14/2020120203751Open ↗
07/24/2020120203751Open ↗
Showing 3 of 48 on file for this type
▸BISADMINISTRATIVE OBJECTIONS27
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 27 on file for this type
▸BISSCHEDULE A - OCCUPANCY - USE17
10/09/2020120203751Open ↗
10/02/2020120203751Open ↗
09/30/2020120203751Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter8
09/02/2026M00708169-P1Open ↗
09/02/2026M00708169-I1Open ↗
09/02/2026M00708169-S1Open ↗
Showing 3 of 8 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸Cost, Insurance & Ownership41
▸BISCOST AFFIDAVIT38
10/08/2019123431081Open ↗
01/17/2019123184972Open ↗
09/20/2018122162845Open ↗
Showing 3 of 38 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE3
04/22/2019120203751Open ↗
Showing 1 of 3 on file for this type
▸Filing & Intake Forms95
▸BISEFILING COVER SHEET38
07/24/2018123184972Open ↗
07/24/2018123184972Open ↗
07/03/2018123431081Open ↗
Showing 3 of 38 on file for this type
▸BISADDITIONAL INFORMATION38
02/26/2019121773688Open ↗
12/22/2016121557412Open ↗
11/27/2015120203813Open ↗
Showing 3 of 38 on file for this type
▸BISBOROUGH INTAKE FORM15
02/11/2020120203751Open ↗
12/05/2019120203751Open ↗
10/08/2019123431081Open ↗
Showing 3 of 15 on file for this type
▸BISeFiling Job Application Cover Sheet4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Other Documents29
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION20
10/09/2020120203751Open ↗
07/11/2018123184972Open ↗
07/24/2015122258957Open ↗
Showing 3 of 20 on file for this type
▸BISSITE CONNECTION: DEP2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSupporting Document: Fee Exempt2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPLOT DIAGRAM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISENVIRONMENTAL -E- DEP NOTICE OF SATIS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWIRA Certification1
08/13/2026M01341873-I1Open ↗