← Back
Three families
1551 EASTERN PARKWAY
BROOKLYN · BIN 3039410
💬 Discuss this project
1920Year Built
3Stories
C0Building Class
R6Zoning
2,772 sfGross Floor Area
3Units
Rent Stabilized8 Open Violations ▸FDNY Report ↗
Three families · Owner of record: 1551 EASTERN BH LLC · 1,600 sf lot · 1.73 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Roof1p · 1 filing · 11 docs
Floor 32p · 1 filing · 20 docs
Floor 2
Floor 1
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/27/2023$670K—Private party → 1551 EASTERN BH LLC$242/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SYED ENGINEERING, P.C.209/08/2023
ASR ENGINEERING PC309/07/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ADOR BUILDERS LLCGeneral Contractor207/08/2026
PLBG P & H INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SYED ENGINEERING, P.C.7054409/08/2023
Building Lifecycle
All (68)Filed (5)Permit Issued (3)Signed Off (3)Violation (28)Inspection (5)Objection (2)Special Inspection (22)
05/04/2026
Violation issued (HPD, closed)
A
06/09/2025
Violation issued (HPD, closed)
A
04/10/2024
Violation issued (HPD, closed)
A
12/14/2023
Signed off — Alteration
INSTALLATION OF NEW MECHANICAL UNITS HVAC/HEAT PUMPS AS PER PLANS. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
B00930868-I1
12/13/2023
Signed off — Alteration
CAP AND REMOVE ALL GAS FIXTURES. REPLACE AND PROPOSE NEW PLUMBING FIXTURES AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00877248-I1
12/13/2023
Signed off — Alteration
CAP AND REMOVE ALL GAS FIXTURES. REPLACE AND PROPOSE NEW PLUMBING FIXTURES AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00877248-S1
12/12/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
11/22/2023
Violation issued (HPD, closed)
I
10/04/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/18/2023
Permit issued — Mechanical Systems
B00930868-I1-MS
09/14/2023
Objection raised — Other
09/14/2023
Objection resolved — Addressed
09/12/2023
Permit issued — General Construction
B00877248-S1-GC
09/08/2023
Filed — Alteration
INSTALLATION OF NEW MECHANICAL UNITS HVAC/HEAT PUMPS AS PER PLANS. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
B00930868-I1
09/08/2023
Special inspection requirement — Maintenance information
RAFI HAMID
09/08/2023
Special inspection requirement — Permanent certificate
RAFI HAMID
09/08/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
RAFI HAMID
09/08/2023
Special inspection requirement — HVAC-R and service water heating system controls
RAFI HAMID
09/08/2023
Special inspection requirement — Heating Systems
RAFI HAMID
09/08/2023
Special inspection requirement — HVAC-R and service water heating equipment
RAFI HAMID
09/07/2023
Filed — Alteration
CAP AND REMOVE ALL GAS FIXTURES. REPLACE AND PROPOSE NEW PLUMBING FIXTURES AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00877248-S1
09/07/2023
Special inspection requirement — Mechanical Systems
RAFI HAMID
09/07/2023
Special inspection requirement — Final
RAFI HAMID
08/30/2023
Special inspection requirement — Fenestration air leakage
RAFI HAMID
08/30/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
RAFI HAMID
08/10/2023
Special inspection requirement — Insulation placement and R values
RAFI HAMID
08/03/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
RAFI HAMID
08/03/2023
Special inspection requirement — Energy Code Compliance Inspections
RAFI HAMID
08/03/2023
Special inspection requirement — Fire-Resistance Rated Construction
RAFI HAMID
08/03/2023
Special inspection requirement — Lighting controls
RAFI HAMID
08/03/2023
Special inspection requirement — Interior lighting power
RAFI HAMID
08/03/2023
Special inspection requirement — Lighting in dwelling units
RAFI HAMID
08/03/2023
Special inspection requirement — Fenestration areas
RAFI HAMID
07/07/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/07/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
07/05/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/27/2023
Permit issued — Plumbing
B00877248-I1-PL
06/26/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
RAFI HAMID
06/26/2023
Special inspection requirement — Energy Code Compliance Inspections
RAFI HAMID
06/22/2023
Filed — Alteration
CAP AND REMOVE ALL GAS FIXTURES. REPLACE AND PROPOSE NEW PLUMBING FIXTURES AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00877248-P1
06/22/2023
Special inspection requirement — Energy Code Compliance Inspections
RAFI HAMID
06/22/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
RAFI HAMID
05/30/2023
Filed — Alteration
CAP AND REMOVE ALL GAS FIXTURES. REPLACE AND PROPOSE NEW PLUMBING FIXTURES AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00877248-I1
05/30/2023
Filed — Alteration
B00863769-I1
03/22/2023
Violation issued (HPD, closed)
A
11/14/2022
Violation issued (HPD, closed)
I
02/24/2022
Violation issued (HPD, closed)
A
02/24/2022
Violation issued (HPD, closed)
I
04/08/2021
Violation issued (HPD, closed)
I
04/08/2021
Violation issued (HPD, closed)
A
10/30/2019
Violation issued (HPD, closed)
I
08/22/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/17/2018
Violation issued (HPD, closed)
I
04/30/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/22/2017
Violation issued (HPD, closed)
I
11/07/2016
Violation issued (HPD, closed)
I
10/08/2015
Violation issued (HPD, closed)
I
02/20/2015
Violation issued (HPD, closed)
I
01/26/2013
Violation issued (DOB, closed)
V%*-DOB VIOLATION - DISMISSED
01/04/2010
Violation issued (HPD, open)
B
Latest 60 of 68 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offADOR BUILDERS LLC09/18/2023
DOB NOWGeneral ConstructionSigned-offADOR BUILDERS LLC09/12/2023
DOB NOWPlumbingSigned-offPLBG P & H INC06/27/2023
1 project · most recent 03/08/2023
General Wiring
FiledStatusContractorScope
03/08/2023Permit IssuedACCURATE ELEC'L CORP.General Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
12/12/2023Pass-Final General Construction Non-Directive 14PassView ↗
10/04/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/07/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/07/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
07/05/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 22
DateRequirementInspectorRole
09/08/2023Maintenance informationRAFI HAMIDenergy_progress
09/08/2023Permanent certificateRAFI HAMIDenergy_progress
09/08/2023HVAC-R and service water piping design and insulationRAFI HAMIDenergy_progress
09/08/2023HVAC-R and service water heating system controlsRAFI HAMIDenergy_progress
09/08/2023Heating SystemsRAFI HAMIDspecial
09/08/2023HVAC-R and service water heating equipmentRAFI HAMIDenergy_progress
09/07/2023Mechanical SystemsRAFI HAMIDspecial
09/07/2023FinalRAFI HAMIDprogress
08/30/2023Fenestration air leakageRAFI HAMIDenergy_progress
08/30/2023Fenestration and door U-factor and product ratingsRAFI HAMIDenergy_progress
08/10/2023Insulation placement and R valuesRAFI HAMIDenergy_progress
08/03/2023Fire-Resistant Penetrations and JointsRAFI HAMIDspecial
08/03/2023Energy Code Compliance InspectionsRAFI HAMIDprogress
08/03/2023Fire-Resistance Rated ConstructionRAFI HAMIDprogress
08/03/2023Lighting controlsRAFI HAMIDenergy_progress
08/03/2023Interior lighting powerRAFI HAMIDenergy_progress
08/03/2023Lighting in dwelling unitsRAFI HAMIDenergy_progress
08/03/2023Fenestration areasRAFI HAMIDenergy_progress
06/26/2023Fire-Resistant Penetrations and JointsRAFI HAMIDspecial
06/26/2023Energy Code Compliance InspectionsRAFI HAMIDprogress
06/22/2023Energy Code Compliance InspectionsRAFI HAMIDprogress
06/22/2023Fire-Resistant Penetrations and JointsRAFI HAMIDspecial
▾Documents — 41 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/27/2026B00877248-P1Request digital key ↗
08/27/2026B00877248-I1Request digital key ↗
08/27/2026B00877248-S1Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications27
▸DOB NOWProgress Inspector Seal & Signature17
08/28/2026B00877248-P1Open ↗
08/25/2026B00877248-I1Open ↗
08/25/2026B00930868-I1Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/27/2026B00877248-I1Open ↗
08/27/2026B00877248-P1Open ↗
08/27/2026B00877248-S1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
08/28/2026B00877248-P1Open ↗
08/25/2026B00877248-I1Open ↗
08/25/2026B00930868-I1Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/27/2026B00877248-P1Open ↗
08/27/2026B00877248-I1Open ↗
08/27/2026B00877248-S1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWOER: Notice of Satisfaction2
08/13/2026B00877248-S1Open ↗
08/13/2026B00877248-I1Open ↗
▸DOB NOWOER: Notice to Proceed2
08/13/2026B00877248-S1Open ↗
08/13/2026B00877248-I1Open ↗