← Back
Two family converted from one family
1553 82 STREET
BROOKLYN · BIN 3163730
💬 Discuss this project
1955Year Built
2Stories
B3Building Class
R4Zoning
1,683 sfGross Floor Area
2Units
Two family converted from one family · 2,200 sf lot · 0.77 FAR built · Flood zone X
Locations of Work
Architecture
Floor 28p · 1 filing · 20 docs
Floor 18p · 1 filing · 20 docs
Basement8p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SD DESIGN STUDIO1807/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/08/2021$759K—Private party → Private party$451/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JIMENEZ BUILDING CONSULTING LLC702/10/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JRL SKYLINE1403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
WINWAY DEVELOPMENT LLCGeneral Contractor303/21/2026
PIPESTYLISTS, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SD TESTING & INSPECTION S7010602/10/2023
JIMENEZ BUILDING CONSULTI7944101/14/2022
Building Lifecycle
All (54)Filed (7)Permit Issued (2)Signed Off (1)Inspection (9)Objection (5)Special Inspection (30)
05/13/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/12/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/10/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/16/2023
Special inspection requirement — Air barrier - visual inspection
XIUCHENG LI
02/16/2023
Special inspection requirement — Interior lighting power
XIUCHENG LI
02/16/2023
Special inspection requirement — Concrete - Cast-In-Place
XIUCHENG LI
02/16/2023
Special inspection requirement — Metering
XIUCHENG LI
02/16/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
XIUCHENG LI
02/16/2023
Special inspection requirement — Fenestration air leakage
XIUCHENG LI
02/16/2023
Special inspection requirement — Interior lighting power
XIUCHENG LI
02/16/2023
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
XIUCHENG LI
02/16/2023
Special inspection requirement — Energy Code Compliance Inspections
XIUCHENG LI
02/16/2023
Special inspection requirement — Fire-Resistance Rated Construction
XIUCHENG LI
02/16/2023
Special inspection requirement — Maintenance information
XIUCHENG LI
02/16/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
XIUCHENG LI
02/16/2023
Special inspection requirement — Maintenance information
XIUCHENG LI
02/16/2023
Special inspection requirement — Fenestration areas
XIUCHENG LI
02/16/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
XIUCHENG LI
02/16/2023
Special inspection requirement — Metering
XIUCHENG LI
02/16/2023
Special inspection requirement — Subgrade Inspections
XIUCHENG LI
02/16/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
XIUCHENG LI
02/16/2023
Special inspection requirement — Fenestration air leakage
XIUCHENG LI
02/16/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIUCHENG LI
02/16/2023
Special inspection requirement — Fire-Resistance Rated Construction
XIUCHENG LI
02/16/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIUCHENG LI
02/16/2023
Special inspection requirement — Fenestration areas
XIUCHENG LI
02/16/2023
Special inspection requirement — Energy Code Compliance Inspections
XIUCHENG LI
02/16/2023
Special inspection requirement — Air barrier - visual inspection
XIUCHENG LI
02/16/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
XIUCHENG LI
02/16/2023
Special inspection requirement — Concrete - Cast-In-Place
XIUCHENG LI
02/16/2023
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
XIUCHENG LI
02/16/2023
Special inspection requirement — Subgrade Inspections
XIUCHENG LI
02/16/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
XIUCHENG LI
02/10/2023
Filed — Alteration CO
CONVERT EXISTING ONE-FAMILY RESIDENTIAL BUILDING TO TWO-FAMILY. INTERIOR PARTITIONS, CEILING, AND FLOORING WORKS AS PER PLAN. OBTAIN NEW CERTIFICATE OF OCCUPANCY.
B00645469-P3
11/02/2022
Objection raised — Zoning
10/27/2022
Objection resolved — Addressed
10/25/2022
Objection raised — Scope
10/20/2022
Filed — Alteration CO
CONVERT EXISTING ONE-FAMILY RESIDENTIAL BUILDING TO TWO-FAMILY. INTERIOR PARTITIONS, CEILING, AND FLOORING WORKS AS PER PLAN. OBTAIN NEW CERTIFICATE OF OCCUPANCY.
B00645469-P2
10/06/2022
Signed off — Alteration
PLUMBING APPLICATION FILED IN CONJUNCTION WITH JOB#B00645469-I1. PROPOSED PLUMBING WORK ON BASEMENT, 1ST FLOOR, AND 2ND FLOOR AS PER PLAN.
B00648065-I1
07/18/2022
Filed — Alteration
PLUMBING APPLICATION FILED IN CONJUNCTION WITH JOB#B00645469-I1. PROPOSED PLUMBING WORK ON BASEMENT, 1ST FLOOR, AND 2ND FLOOR AS PER PLAN.
B00648065-P3
07/18/2022
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/24/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/23/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/09/2022
Objection resolved — Addressed
05/04/2022
Objection raised — Other
04/26/2022
Filed — Alteration CO
CONVERT EXISTING ONE-FAMILY RESIDENTIAL BUILDING TO TWO-FAMILY. INTERIOR PARTITIONS, CEILING, AND FLOORING WORKS AS PER PLAN. OBTAIN NEW CERTIFICATE OF OCCUPANCY.
B00645469-P1
03/28/2022
Permit issued — General Construction
B00645469-I1-GC
01/31/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
01/31/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/31/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
01/14/2022
Filed — Alteration
PLUMBING APPLICATION FILED IN CONJUNCTION WITH JOB#B00645469-I1. PROPOSED PLUMBING WORK ON BASEMENT, 1ST FLOOR, AND 2ND FLOOR AS PER PLAN.
B00648065-P2
01/04/2022
Permit issued — Plumbing
B00648065-I1-PL
12/14/2021
Filed — Alteration
PLUMBING APPLICATION FILED IN CONJUNCTION WITH JOB#B00645469-I1. PROPOSED PLUMBING WORK ON BASEMENT, 1ST FLOOR, AND 2ND FLOOR AS PER PLAN.
B00648065-I1
12/10/2021
Filed — Alteration CO
CONVERT EXISTING ONE-FAMILY RESIDENTIAL BUILDING TO TWO-FAMILY. INTERIOR PARTITIONS, CEILING, AND FLOORING WORKS AS PER PLAN. OBTAIN NEW CERTIFICATE OF OCCUPANCY.
B00645469-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedWINWAY DEVELOPMENT LLC03/28/2022
DOB NOWPlumbingSigned-offT & T PLUMBING INC01/04/2022
2 projects · most recent 10/01/2022
General Wiring
FiledStatusContractorScope
10/01/2022CompleteJ Y ELECTRIC INCGeneral Wiring
11/16/2021CompleteJ Y ELECTRIC INC—
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
05/13/2025Pass-Final CND-Occupancy InspectionPassView ↗
03/12/2025Pass-Final CND-Occupancy InspectionPassView ↗
06/10/2024Pass-Final CND-Occupancy InspectionPassView ↗
07/18/2022Pass-Final CND-Occupancy InspectionPassView ↗
05/24/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/23/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/31/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/31/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/31/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 72
DateRequirementInspectorRole
02/16/2023Structural Stability – Alterations of existing buildingsXIUCHENG LIspecial
02/16/2023Fire-Resistant Penetrations and JointsXIUCHENG LIspecial
02/16/2023Fire-Resistance Rated ConstructionXIUCHENG LIprogress
02/16/2023Energy Code Compliance InspectionsXIUCHENG LIprogress
02/16/2023Fenestration areasXIUCHENG LIenergy_progress
02/16/2023Fenestration air leakageXIUCHENG LIenergy_progress
02/16/2023MeteringXIUCHENG LIenergy_progress
02/16/2023HVAC-R and service water piping design and insulationXIUCHENG LIenergy_progress
02/16/2023Air barrier - visual inspectionXIUCHENG LIenergy_progress
02/16/2023Maintenance informationXIUCHENG LIenergy_progress
02/16/2023Fenestration and door U-factor and product ratingsXIUCHENG LIenergy_progress
02/16/2023Interior lighting powerXIUCHENG LIenergy_progress
02/16/2023Subgrade InspectionsXIUCHENG LIspecial
02/16/2023Structural Stability – Alterations of existing buildingsXIUCHENG LIspecial
02/16/2023Subsurface Investigations (Borings/Test Pits)XIUCHENG LIspecial
02/16/2023Maintenance informationXIUCHENG LIenergy_progress
02/16/2023HVAC-R and service water piping design and insulationXIUCHENG LIenergy_progress
02/16/2023Interior lighting powerXIUCHENG LIenergy_progress
02/16/2023Fenestration and door U-factor and product ratingsXIUCHENG LIenergy_progress
02/16/2023Fenestration air leakageXIUCHENG LIenergy_progress
02/16/2023Fenestration areasXIUCHENG LIenergy_progress
02/16/2023Air barrier - visual inspectionXIUCHENG LIenergy_progress
02/16/2023MeteringXIUCHENG LIenergy_progress
02/16/2023Fire-Resistance Rated ConstructionXIUCHENG LIprogress
02/16/2023Energy Code Compliance InspectionsXIUCHENG LIprogress
Latest 25 of 72.
▾Documents — 59 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/31/2026B00648065-P2Request digital key ↗
08/31/2026B00648065-P3Request digital key ↗
08/31/2026B00648065-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00645469-I1Open ↗
▸Seals & Professional Certifications31
▸DOB NOWProgress Inspector Seal & Signature12
09/01/2026B00645469-I1Open ↗
09/01/2026B00645469-I1Open ↗
08/31/2026B00648065-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
09/01/2026B00645469-I1Open ↗
09/01/2026B00645469-I1Open ↗
09/01/2026B00645469-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/31/2026B00648065-P2Open ↗
08/31/2026B00648065-P3Open ↗
08/31/2026B00648065-I1Open ↗
Showing 3 of 7 on file for this type
▸Safety & Tenant Protection1
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00645469-I1Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/31/2026B00648065-I1Open ↗
08/31/2026B00648065-P2Open ↗
08/31/2026B00648065-P3Open ↗
Showing 3 of 7 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis2
08/31/2026B00648065-I1Open ↗
08/13/2026B00645469-I1Open ↗
▸Inspections & Test Reports6
▸DOB NOWSOIL REPORT4
08/27/2026B00645469-I1Open ↗
08/15/2026B00645469-P1Open ↗
08/14/2026B00645469-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B00645469-I1Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026B00645469-I1Open ↗
▸Other Documents4
▸DOB NOWProperty Ownership Certification4
08/27/2026B00645469-I1Open ↗
08/15/2026B00645469-P1Open ↗
08/14/2026B00645469-P2Open ↗
Showing 3 of 4 on file for this type