← Back
One story retail building
1553 WESTCHESTER AVENUE
BRONX · Soundview-Bruckner-Bronx River · BIN 2025221
💬 Discuss this project
1927Year Built
1Stories
K1Building Class
C4-2Zoning
9,600 sfGross Floor Area
4Units
0 Open Violations
One story retail building · Owner of record: WILCO MANAGEMENT LLC · 10,133 sf lot · 0.95 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingCivilGeneral
Roof28p · 3 filings · 20 docs
Floor 181p · 5 filings · 20 docs
Cellar24p · 2 filings · 20 docs
Site & exterior5p · 4 filings · 14 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
REXCO2107/08/2026
WILCO MANAGEMENT1607/08/2026
1553 WESTCHESTER AVE1503/21/2026
BLUE EAGLE REALTY803/21/2026
JACK KAHN REALTY SERVICES707/08/2026
SABROSURA203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/26/2021$6.2M—— → —$651/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CATAPANO ENGINEERING PC809/21/2022
COSCIA MOOS ARCHITECTURE208/03/2022
ASDA ARCHITECTURE + DESIGN104/11/2022
CL ENGINEERING P.C.604/07/2022
LEON SKVIRSKY PE212/28/2017
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CATAPANO ENGINEERING2003/21/2026
METRO DESIGN CONSULTANTS INC1203/21/2026
BUILDING BROTHERS403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ACC CONSTRUCTION CORPGeneral Contractor504/09/2026
DAVID KLEEMANElectrical403/21/2026
PIPESTYLISTS, INCPlumbing307/08/2026
DPH PLUMBING & HTG CORPPlumbing307/08/2026
SIGNSTAR NYCScaffold207/08/2026
TCS CONSTRUCTION CORPGeneral Contractor104/09/2026
YOUNG CHOEElectrical103/21/2026
TREVOR DUNWELLElectrical103/21/2026
TRI CITY MECHANICAL GROUP CORPPlumbing107/08/2026
SERVICE SIGN ERECTORSScaffold107/08/2026
POWER SURGE ELECTRIC, INCElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CATAPANO ENGINEERING & AR3235709/21/2022
C.M. TESTING LABORATORY,1352207/15/2022
CL ENGINEERING P.C.6781604/07/2022
Building Lifecycle
All (88)Filed (19)Permit Issued (12)Signed Off (9)Violation (5)Inspection (9)Objection (4)Special Inspection (30)
01/26/2023
Signed off — Alteration
Proposing-new tenant space conversion 6B for Treatment Fac. -Remove demising wall, interior partitions, storefront, stair & landing, new concrete slab, finishes & furring on columns. Install Interior partitions, finishes, casework & new storefront.
X00679074-I1
01/13/2023
Signed off — Alteration
Install for Tenant Space for Oak Street Health Remove- Existing RTU's & ductwork,fan,venting & wall cap Install (2) Rooftop HVAC Units, (1) VRF Split System, (5) Exhaust Fans, (2) unit heaters(1) Air Curtain- all with associated ductwork and components
X00678714-I1
12/06/2022
Signed off — Alteration
Proposing OSH Treat. Fac. tenant space-Remove (3)W.C.(3) Lavs,(1) NR sink,(1)grease interceptor Install-(14)non res.sinks (4) lavs,(4)Toilets, (1)dishwash,(1)HW Recir. Pump,(1)RPZ ((1)water fount.,(10) drains,(1) HW Heat,(2)HVACs w/piping,replace (1)DCDA
X00678719-I1
10/28/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/24/2022
Permit issued — Plumbing
X00678719-I1-PL
10/18/2022
Signed off — Alteration
Proposing for OSH Treatment Facility Tenant Space to Install a Construction Fence during work relating to the storefront.
X00679131-I1
10/17/2022
Signed off — Alteration
Install concrete footing & steel column in cellar to support 1st floor of tenant space for OSH, new concrete slab for level flooring, steel angles,metal decking to close stair opening, steel dunnage on underside of roof to support HVAC's. All as per plans
X00720060-I1
09/21/2022
Filed — Alteration
Proposing OSH Treat. Fac. tenant space-Remove (3)W.C.(3) Lavs,(1) NR sink,(1)grease interceptor Install-(14)non res.sinks (4) lavs,(4)Toilets, (1)dishwash,(1)HW Recir. Pump,(1)RPZ ((1)water fount.,(10) drains,(1) HW Heat,(2)HVACs w/piping,replace (1)DCDA
X00678719-P2
09/19/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
JOHN CATAPANO
09/19/2022
Special inspection requirement — Maintenance information
JOHN CATAPANO
09/19/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN CATAPANO
09/19/2022
Special inspection requirement — HVAC-R and service water heating system controls
JOHN CATAPANO
09/19/2022
Special inspection requirement — HVAC-R and service water heating equipment
JOHN CATAPANO
09/19/2022
Special inspection requirement — Energy Code Compliance Inspections
JOHN CATAPANO
08/16/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/05/2022
Special inspection requirement — Insulation placement and R values
JOHN CATAPANO
08/05/2022
Special inspection requirement — Exterior lighting power
JOHN CATAPANO
08/05/2022
Special inspection requirement — Air barrier - visual inspection
JOHN CATAPANO
08/05/2022
Special inspection requirement — Fenestration areas
JOHN CATAPANO
08/05/2022
Special inspection requirement — Energy Code Compliance Inspections
JOHN CATAPANO
08/05/2022
Special inspection requirement — Interior lighting power
JOHN CATAPANO
08/05/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN CATAPANO
08/05/2022
Special inspection requirement — Fenestration air leakage
JOHN CATAPANO
08/05/2022
Special inspection requirement — Vestibules
JOHN CATAPANO
08/05/2022
Special inspection requirement — Fire-Resistance Rated Construction
JOHN CATAPANO
08/05/2022
Special inspection requirement — Lighting controls
JOHN CATAPANO
08/05/2022
Special inspection requirement — Final
JOHN CATAPANO
08/05/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
JOHN CATAPANO
08/03/2022
Filed — Alteration
Proposing-new tenant space conversion 6B for Treatment Fac. -Remove demising wall, interior partitions, storefront, stair & landing, new concrete slab, finishes & furring on columns. Install Interior partitions, finishes, casework & new storefront.
X00679074-P1
08/03/2022
Signed off — Alteration
FILED HEREWITH PLUMBING WORK TYPE. THIS APPLICATION IS FILED IN CONJUNCTION WITH DOB NOW BUILD JOB # X00685298-I1.
X00685298-I1
08/03/2022
Signed off — Alteration
FILED HEREWITH PLUMBING WORK TYPE. THIS APPLICATION IS FILED IN CONJUNCTION WITH DOB NOW BUILD JOB # X00685298-I1.
X00685298-S1
08/03/2022
Special inspection requirement — HVAC-R and service water heating equipment
JOHN CATAPANO
08/03/2022
Special inspection requirement — HVAC-R and service water heating system controls
JOHN CATAPANO
08/03/2022
Special inspection requirement — Shutoff dampers
JOHN CATAPANO
08/03/2022
Special inspection requirement — Maintenance information
JOHN CATAPANO
08/03/2022
Special inspection requirement — Final
JOHN CATAPANO
08/03/2022
Special inspection requirement — Energy Code Compliance Inspections
JOHN CATAPANO
08/03/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
JOHN CATAPANO
08/03/2022
Special inspection requirement — Mechanical Systems
JOHN CATAPANO
08/03/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN CATAPANO
08/03/2022
Special inspection requirement — Fire-Resistance Rated Construction
JOHN CATAPANO
08/02/2022
Filed — Alteration
Proposing OSH Treat. Fac. tenant space-Remove (3)W.C.(3) Lavs,(1) NR sink,(1)grease interceptor Install-(14)non res.sinks (4) lavs,(4)Toilets, (1)dishwash,(1)HW Recir. Pump,(1)RPZ ((1)water fount.,(10) drains,(1) HW Heat,(2)HVACs w/piping,replace (1)DCDA
X00678719-P1
08/02/2022
Filed — Alteration
Install for Tenant Space for Oak Street Health Remove- Existing RTU's & ductwork,fan,venting & wall cap Install (2) Rooftop HVAC Units, (1) VRF Split System, (5) Exhaust Fans, (2) unit heaters(1) Air Curtain- all with associated ductwork and components
X00678714-P1
08/02/2022
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/27/2022
Special inspection requirement — Structural Steel - Welding
JOHN SEMIOLI
07/15/2022
Filed — Alteration
Install concrete footing & steel column in cellar to support 1st floor of tenant space for OSH, new concrete slab for level flooring, steel angles,metal decking to close stair opening, steel dunnage on underside of roof to support HVAC's. All as per plans
X00720060-P1
07/15/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
07/15/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/29/2022
Permit issued — Plumbing
X00678719-I1-PL
06/18/2022
Permit issued — Earth Work
X00720060-I1-FO-EA
06/17/2022
Permit issued — Structural
X00720060-I1-ST
06/13/2022
Permit issued — General Construction
X00679074-I1-GC
06/09/2022
Filed — Alteration
Install concrete footing & steel column in cellar to support 1st floor of tenant space for OSH, new concrete slab for level flooring, steel angles,metal decking to close stair opening, steel dunnage on underside of roof to support HVAC's. All as per plans
X00720060-I1
06/09/2022
Objection resolved — Addressed
06/09/2022
Objection resolved — Addressed
06/03/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/27/2022
Permit issued — Mechanical Systems
X00678714-I1-MS
05/27/2022
Permit issued — Construction Fence
X00679131-I1-FN
05/12/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/05/2022
Objection raised — Other
Latest 60 of 88 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offDPH PLUMBING & HTG CORP10/24/2022
DOB NOWPlumbingSigned-offT & T PLUMBING INC06/29/2022
DOB NOWEarth WorkSigned-offACC CONSTRUCTION CORP06/18/2022
DOB NOWStructuralSigned-offACC CONSTRUCTION CORP06/17/2022
DOB NOWGeneral ConstructionSigned-offACC CONSTRUCTION CORP06/13/2022
DOB NOWMechanical SystemsSigned-offACC CONSTRUCTION CORP05/27/2022
DOB NOWConstruction FenceSigned-offACC CONSTRUCTION CORP05/27/2022
DOB NOWSignPermit IssuedSERVICE SIGN ERECTORS CO04/13/2022
DOB NOWPlumbingSigned-offFLAVIO MECHANICAL CORP03/31/2022
DOB NOWGeneral ConstructionSigned-offTCS CONSTRUCTION CORP03/11/2022
DOB NOWSignSigned-offSIGNSTAR NYC12/29/2017
DOB NOWSignSigned-offSIGNSTAR NYC12/29/2017
BISFPISSUEDMASTER FIRE SYSTEMS, INC02/26/2018
BISPLISSUEDQMB PLUMBING & HEATING INC10/27/2017
BISEQISSUEDSUPER POWER CONSTRUCTION10/06/2017
BISMHISSUEDSUPER POWER CONSTRUCTION10/06/2017
BISPLISSUEDROCK E SMALL PLBG&HTG INC06/21/2012
BISOTISSUEDAIRITAN MANAGEMENT CORP06/05/2012
BISPLISSUEDAARON PLBG AND MECH SYST03/27/2009
BISMHISSUEDJ.D.R. FIXTURES, INC02/26/2009
BISOTISSUEDJ.D.R. FIXTURES, INC02/26/2009
BISOTISSUEDNEW YORK SIGN CONTRACTORS02/04/2009
BISOTISSUEDNEW YORK SIGN CONTRACTORS02/04/2009
BIS—ISSUEDNEW YORK SIGN CONTRACTOR10/24/2008
BIS—ISSUEDNEW YORK SIGN CONTRACTOR10/24/2008
BISMHISSUED1557 WESTCHESTER CORP01/18/2002
BISPLISSUEDAVON PLBG & HTG INC12/04/2001
BISMHISSUEDNOVA PLG & HTG INC12/04/2001
BISOTISSUED1557 WESTCHESTER CORP03/16/2001
BISPLISSUEDAVON PLBG & HTG INC08/08/2000
BISPLISSUEDEBM PLUMBING CORP01/19/2000
BISMHISSUEDNAVA PLUMBING & HEATING11/04/1999
BISPLISSUEDAVON PLBG & HTG INC11/04/1999
BISEQISSUEDTERRA FIRMA08/30/1999
BISOTISSUEDNOVA PLBG. & HTG. INC07/02/1999
BISOTISSUEDYOON DAM CONSTRUCTION06/29/1999
BISSPISSUEDDANICA PLUMBING & HEATING CORP04/16/1999
BISPLISSUEDAVON PLBG & HTG INC04/06/1999
BISMHISSUEDNOVA PLBG. & HTG. INC04/06/1999
BISEQISSUEDTERRA FIRMA11/25/1998
+ 6 more permits on file
4 projects · most recent 07/27/2022
General Wiring
FiledStatusContractorScope
07/27/2022CompleteA.S.K. ELECTRICAL CORPGeneral Wiring
03/17/2022Permit IssuedPOWER SURGE ELECTRIC, INC2 meters, 1 new_meters
02/17/2018CompleteROBERT S. COVELLO—
02/17/2018CompleteROBERT S. COVELLO—
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
10/28/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/16/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/02/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/15/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/15/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/03/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/12/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/08/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/08/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 108
DateRequirementInspectorRole
09/19/2022Fire-Resistant Penetrations and JointsJOHN CATAPANOspecial
09/19/2022Energy Code Compliance InspectionsJOHN CATAPANOprogress
09/19/2022HVAC-R and service water piping design and insulationJOHN CATAPANOenergy_progress
09/19/2022HVAC-R and service water heating equipmentJOHN CATAPANOenergy_progress
09/19/2022Maintenance informationJOHN CATAPANOenergy_progress
09/19/2022HVAC-R and service water heating system controlsJOHN CATAPANOenergy_progress
08/05/2022Interior lighting powerJOHN CATAPANOenergy_progress
08/05/2022Air barrier - visual inspectionJOHN CATAPANOenergy_progress
08/05/2022Fenestration areasJOHN CATAPANOenergy_progress
08/05/2022Fenestration air leakageJOHN CATAPANOenergy_progress
08/05/2022Exterior lighting powerJOHN CATAPANOenergy_progress
08/05/2022Fire-Resistant Penetrations and JointsJOHN CATAPANOspecial
08/05/2022Fire-Resistance Rated ConstructionJOHN CATAPANOprogress
08/05/2022Energy Code Compliance InspectionsJOHN CATAPANOprogress
08/05/2022FinalJOHN CATAPANOprogress
08/05/2022VestibulesJOHN CATAPANOenergy_progress
08/05/2022Lighting controlsJOHN CATAPANOenergy_progress
08/05/2022Insulation placement and R valuesJOHN CATAPANOenergy_progress
08/05/2022Fenestration and door U-factor and product ratingsJOHN CATAPANOenergy_progress
08/03/2022HVAC-R and service water heating equipmentJOHN CATAPANOenergy_progress
08/03/2022Fire-Resistant Penetrations and JointsJOHN CATAPANOspecial
08/03/2022Mechanical SystemsJOHN CATAPANOspecial
08/03/2022Energy Code Compliance InspectionsJOHN CATAPANOprogress
08/03/2022FinalJOHN CATAPANOprogress
08/03/2022Maintenance informationJOHN CATAPANOenergy_progress
Latest 25 of 108.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Oak Street HealthMedical / Healthcare—
Project X00679131 Alteration · LOC Issued · 04/25/2022
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 251 on file (BIS + DOB NOW)
▸Plans & Drawings19
▸DOB NOWPlans/Sketch19
08/26/2026X00003899-I1Request digital key ↗
08/26/2026X00003903-I1Request digital key ↗
08/24/2026X00685298-P4Request digital key ↗
Showing 3 of 19 on file for this type
▸Applications & Permits30
▸BISWORK PERMIT APPLICATION14
02/26/2018220635141Open ↗
10/27/2017220617456Open ↗
10/10/2017220617456Open ↗
Showing 3 of 14 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION14
05/24/2018220617456Open ↗
05/22/2018220617456Open ↗
02/16/2018220635141Open ↗
Showing 3 of 14 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications2
06/15/2018220617456Open ↗
06/07/2018220617456Open ↗
▸Seals & Professional Certifications100
▸DOB NOWProgress Inspector Seal & Signature28
09/23/2026X00720060-P1Open ↗
09/02/2026X00003899-I1Open ↗
09/01/2026X00678714-P1Open ↗
Showing 3 of 28 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature24
09/23/2026X00720060-P1Open ↗
09/23/2026X00720060-P1Open ↗
09/23/2026X00720060-P1Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature19
08/26/2026X00003899-I1Open ↗
08/24/2026X00709747-I1Open ↗
08/24/2026X00679074-I1Open ↗
Showing 3 of 19 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION14
06/07/2018220617456Open ↗
02/16/2018220635141Open ↗
09/29/2017220617456Open ↗
Showing 3 of 14 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST8
05/24/2018220617456Open ↗
02/16/2018220635141Open ↗
09/22/2017220617456Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM5
06/04/2012220207611Open ↗
02/02/2009210110002Open ↗
02/02/2009210110011Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
02/16/2018220635141Open ↗
09/22/2017220617456Open ↗
▸Trade Schedules & Equipment13
▸BISSCHEDULE B - PLUMBING3
06/04/2012220207611Open ↗
04/01/2009210108202Open ↗
01/16/2009210108202Open ↗
▸BISSELF-CERT PLUMBING NOTICE3
04/28/2009210108202Open ↗
04/17/2009210108202Open ↗
04/06/2009210108202Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
05/24/2018220617456Open ↗
01/02/2018220617456Open ↗
11/21/2017220617456Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA2
08/10/2018220635141Open ↗
03/05/2018220635141Open ↗
▸BISEQUIPMENT USE PERMITS1
06/15/2018220617456Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
06/15/2018220617456Open ↗
▸Safety & Tenant Protection1
▸BISTenant Protection Plan and Notes1
09/22/2017220617456Open ↗
▸Environmental & Asbestos24
▸DOB NOWDEP ACP-5: Asbestos Assessment Report17
08/26/2026X00003899-I1Open ↗
08/24/2026X00679074-P1Open ↗
08/24/2026X00678719-P2Open ↗
Showing 3 of 17 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER4
02/02/2009210110002Open ↗
02/02/2009210110011Open ↗
10/21/2008210074346Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
09/22/2017220617456Open ↗
06/04/2012220207611Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
01/16/2009210108202Open ↗
▸Energy Compliance9
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
06/07/2018220617456Open ↗
09/29/2017220617456Open ↗
09/22/2017220617456Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWEN2: As Built Energy Analysis4
08/13/2026X00678714-I1Open ↗
08/13/2026X00678719-I1Open ↗
08/13/2026X00679074-I1Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS1
06/07/2018220617456Open ↗
▸Approvals, Objections & Sign-offs21
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST10
08/10/2018220635141Open ↗
06/15/2018220617456Open ↗
06/07/2018220617456Open ↗
Showing 3 of 10 on file for this type
▸BISADMINISTRATIVE OBJECTIONS6
06/04/2012220207611Open ↗
02/02/2009210110002Open ↗
02/02/2009210110011Open ↗
Showing 3 of 6 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION5
03/23/2010210108202Open ↗
03/19/2010210074346Open ↗
03/11/2010210074337Open ↗
Showing 3 of 5 on file for this type
▸Cost, Insurance & Ownership16
▸BISCOST AFFIDAVIT16
08/10/2018220635141Open ↗
06/07/2018220617456Open ↗
02/16/2018220635141Open ↗
Showing 3 of 16 on file for this type
▸Filing & Intake Forms17
▸BISEFILING COVER SHEET8
02/16/2018220635141Open ↗
09/22/2017220617456Open ↗
06/04/2012220207611Open ↗
Showing 3 of 8 on file for this type
▸BISADDITIONAL INFORMATION6
05/24/2018220617456Open ↗
05/22/2018220617456Open ↗
04/09/2018220617456Open ↗
Showing 3 of 6 on file for this type
▸BISBOROUGH INTAKE FORM3
08/10/2018220635141Open ↗
06/15/2018220617456Open ↗
06/07/2018220617456Open ↗
▸Other Documents1
▸DOB NOWProject Specific General Liability (PGL1)1
08/13/2026X00679074-I1Open ↗