← Back
BuildNYC
Two stories - detached, small or mid-size
1554 ST LAWRENCE AVENUE
BRONX · BIN 2028604
💬 Discuss this project
1925Year Built
2.5Stories
A1Building Class
R5Zoning
1,582 sfGross Floor Area
1Units
0 Active Violations
Two stories - detached, small or mid-size · 1,900 sf lot · 0.83 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalPlumbingLandscapeGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofBuilding mounted solar electric generation array installatio6p · 2 filings · 20 docs
Attic22p · 1 filing · 20 docs
Floor 224p · 1 filing · 20 docs
Floor 1Unit 1IC224p · 1 filing · 20 docs
Basement28p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Innation Engineering505/08/2025
Momentum Solar102/08/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Next Step Building Solutions1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Columbia East ConstructionGeneral Contractor207/08/2026
HI-Rite ElectricElectrical103/22/2026
Island ElectricElectrical103/22/2026
John Fitzgerald Plumbing & HeatingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CL Engineering6781405/08/2025
MXV Sia9281102/08/2024
Building Lifecycle
06/05/2025
Signed off — Alteration CO
TO CONVERT 1 FAMILY TO 2 FAMILY DWELLING.
X00772682-I1
05/20/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
05/20/2025
Special inspection requirement — Fire-Resistance Rated Construction
CHRISTIAN LOZADA
05/20/2025
Special inspection requirement — Energy Code Compliance Inspections
CHRISTIAN LOZADA
05/20/2025
Special inspection requirement — Interior lighting power
CHRISTIAN LOZADA
68 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offJohn Fitzgerald Plumbing & Heating12/02/2024
DOB NOWSolarPermit IssuedMomentum Solar02/28/2024
DOB NOWGeneral ConstructionPermit IssuedColumbia East Construction08/22/2023
DOB NOWGeneral ConstructionPermit IssuedColumbia East Construction07/22/2023
2 projects · most recent 02/07/2024
General Wiring Lighting
FiledStatusContractorScope
02/07/2024CompleteIsland Electric—
07/26/2023CompleteHI-Rite ElectricGeneral Wiring, Lighting
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
04/03/2025Pass-Final CND-Occupancy InspectionPassView ↗
12/13/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/09/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/14/2024Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 25
DateRequirementInspectorRole
05/20/2025Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
05/20/2025Fire-Resistance Rated ConstructionCHRISTIAN LOZADAprogress
05/20/2025Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
05/20/2025Interior lighting powerCHRISTIAN LOZADAenergy_progress
05/20/2025Air barrier - visual inspectionCHRISTIAN LOZADAenergy_progress
05/20/2025Insulation placement and R valuesCHRISTIAN LOZADAenergy_progress
05/20/2025Fenestration and door U-factor and product ratingsCHRISTIAN LOZADAenergy_progress
05/20/2025Fenestration air leakageCHRISTIAN LOZADAenergy_progress
04/15/2025Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
04/15/2025Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
04/15/2025Fire-Resistance Rated ConstructionCHRISTIAN LOZADAprogress
04/15/2025Air barrier - visual inspectionCHRISTIAN LOZADAenergy_progress
04/15/2025Fenestration and door U-factor and product ratingsCHRISTIAN LOZADAenergy_progress
04/15/2025Fenestration air leakageCHRISTIAN LOZADAenergy_progress
04/15/2025Insulation placement and R valuesCHRISTIAN LOZADAenergy_progress
04/15/2025Interior lighting powerCHRISTIAN LOZADAenergy_progress
02/04/2025Fire-Resistance Rated ConstructionCHRISTIAN LOZADAprogress
02/04/2025Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
02/04/2025Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
09/10/2024Maintenance informationCHRISTIAN LOZADAenergy_progress
09/10/2024MeteringCHRISTIAN LOZADAenergy_progress
09/10/2024HVAC-R and service water heating equipmentCHRISTIAN LOZADAenergy_progress
09/10/2024HVAC-R and service water piping design and insulationCHRISTIAN LOZADAenergy_progress
09/10/2024HVAC-R and service water heating system controlsCHRISTIAN LOZADAenergy_progress
09/10/2024Permanent certificateCHRISTIAN LOZADAenergy_progress
49 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account