← Back
BRONX
1555 STORY AVENUE
BRONX · Soundview-Bruckner-Bronx River · BIN 2815058
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Flood zone X
Locations of Work
ArchitectureStructuralMechanicalFire ProtectionCivilGeneralOther
Permit Issued — active, not yet Signed-off
Roof73p · 3 filings · 20 docs
Floor 2Under Construction1p · 1 filing · 2 docs
Floor 1Under Construction2p · 2 filings · 5 docs
Mezzanine63p · 1 filing · 20 docs
Site & exterior90p · 1 filing · 20 docs
Filed — no permit issued19p · 4 filings · 16 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CONSOLITADED EDISON CO1607/08/2026
CONSOLITADED EDISON CO OF NY1103/22/2026
CONSOLIDATED EDISON COMPANY503/21/2026
CONSOLIDATED EDISON COMPANY OF NY103/21/2026
CONEDISON103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
S.M. BERGER ARCHITECTURE PC302/17/2026
PARSONS TRANSPORTATION GROUP305/23/2024
CHA CONSULTING INC.310/24/2023
CHA COMPANIES110/17/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
TACCETTA CONSULTING103/21/2026
CROWN DESIGN CONSULTING603/21/2026
MUNICIPAL BUILDING CONSULTANTS403/21/2026
JAM CONSULTANTS, INC.403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GIANFIA CORPGeneral Contractor707/08/2026
ACME INDUSTRIAL INCGeneral Contractor507/08/2026
UNI ASSOCIATESGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CATALPA SPECIAL INSPECTIO2004302/17/2026
TECTONIC ENGINEERING CONS106705/23/2024
Building Lifecycle
All (57)Filed (10)Permit Issued (10)Signed Off (4)Objection (4)Special Inspection (29)
04/29/2026
Permit issued — Mechanical Systems
X01357856-I1-MS
02/17/2026
Filed — Alteration
X01357856-I1
11/20/2025
Signed off — Alteration
PROPOSED WORK INCLUDES REPLACEMENT OF EXISTING VEHICULAR RAMP TO BUILDING 3 ROOF PARKINGDECK IN NEW LOCTION, SITE IMPROVEMENTS, CURBS, PAVEMENT MARKINGS, & HARDSCAPING WITHIN THE SITE. PARTIAL DEMOLITION TO BE FILED SEPARATELY.
X00449254-I1
11/20/2025
Signed off — Alteration
PROPOSED WORK INCLUDES REPLACEMENT OF EXISTING VEHICULAR RAMP TO BUILDING 3 ROOF PARKINGDECK IN NEW LOCTION, SITE IMPROVEMENTS, CURBS, PAVEMENT MARKINGS, & HARDSCAPING WITHIN THE SITE. PARTIAL DEMOLITION TO BE FILED SEPARATELY.
X00449254-S1
11/10/2024
Permit issued — Earth Work
X00449254-S1-FO-EA
11/10/2024
Permit issued — Structural
X00449254-I1-ST
06/13/2024
Special inspection requirement — Footing and Foundation
GEORGE GHEBRYAL
06/13/2024
Special inspection requirement — Subgrade Inspections
GEORGE GHEBRYAL
06/13/2024
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
GEORGE GHEBRYAL
06/13/2024
Special inspection requirement — Deep Foundation Elements
GEORGE GHEBRYAL
06/13/2024
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
GEORGE GHEBRYAL
06/13/2024
Special inspection requirement — Final
GEORGE GHEBRYAL
05/29/2024
Objection raised — Other
05/29/2024
Objection resolved — Addressed
05/29/2024
Objection raised — Other
05/29/2024
Objection resolved — Addressed
05/23/2024
Filed — Alteration
PROPOSED WORK INCLUDES REPLACEMENT OF EXISTING VEHICULAR RAMP TO BUILDING 3 ROOF PARKINGDECK IN NEW LOCTION, SITE IMPROVEMENTS, CURBS, PAVEMENT MARKINGS, & HARDSCAPING WITHIN THE SITE. PARTIAL DEMOLITION TO BE FILED SEPARATELY.
X00449254-P1
05/10/2024
Special inspection requirement — Footing and Foundation
GEORGE GHEBRYAL
05/10/2024
Special inspection requirement — Deep Foundation Elements
GEORGE GHEBRYAL
05/10/2024
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
GEORGE GHEBRYAL
05/10/2024
Special inspection requirement — Subgrade Inspections
GEORGE GHEBRYAL
05/10/2024
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
GEORGE GHEBRYAL
05/10/2024
Special inspection requirement — Final
GEORGE GHEBRYAL
04/15/2024
Permit issued — Foundation
X00449254-S1-FO-EA
04/11/2024
Signed off — Alteration
X00912053-I1
03/14/2024
Permit issued — Structural
X00449254-I1-ST
10/24/2023
Filed — Alteration
CONCRETE SLAB REPLACEMENT FOR CONED BUILDING 3 AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
X00927865-I1
10/17/2023
Filed — Alteration
INTERIOR AND EXTERIOR RENOVATIONS ON EXISTING CONED BUILDING 3 AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
X00927808-I1
10/13/2023
Filed — Alteration
SPRINKLER MODIFICATIONS FOR CONED SPACE FOR BUILDING 3 AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
X00927854-I1
10/13/2023
Filed — Alteration
X00927835-I1
09/25/2023
Filed — Alteration
X00912053-I1
09/25/2023
Permit issued — Mechanical Systems
X00912053-I1-MS
08/31/2023
Special inspection requirement — Sprinkler Systems
GEORGE GHEBRYAL
08/31/2023
Special inspection requirement — Concrete - Cast-In-Place
GEORGE GHEBRYAL
08/31/2023
Special inspection requirement — Subgrade Inspections
GEORGE GHEBRYAL
08/31/2023
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
GEORGE GHEBRYAL
08/31/2023
Special inspection requirement — Deep Foundation Elements
GEORGE GHEBRYAL
08/31/2023
Special inspection requirement — Final
GEORGE GHEBRYAL
08/31/2023
Special inspection requirement — Footing and Foundation
GEORGE GHEBRYAL
04/18/2023
Permit issued — Earth Work
X00449254-S1-FO-EA
03/15/2023
Permit issued — Structural
X00449254-I1-ST
12/22/2021
Filed — Alteration
PROPOSED WORK INCLUDES REPLACEMENT OF EXISTING VEHICULAR RAMP TO BUILDING 3 ROOF PARKINGDECK IN NEW LOCTION, SITE IMPROVEMENTS, CURBS, PAVEMENT MARKINGS, & HARDSCAPING WITHIN THE SITE. PARTIAL DEMOLITION TO BE FILED SEPARATELY.
X00449254-S1
04/13/2021
Filed — Alteration
PROPOSED WORK INCLUDES REPLACEMENT OF EXISTING VEHICULAR RAMP TO BUILDING 3 ROOF PARKINGDECK IN NEW LOCTION, SITE IMPROVEMENTS, CURBS, PAVEMENT MARKINGS, & HARDSCAPING WITHIN THE SITE. PARTIAL DEMOLITION TO BE FILED SEPARATELY.
X00449254-I1
01/07/2021
Special inspection requirement — Structural Steel - Welding
GEORGE GHEBRYAL
01/07/2021
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
GEORGE GHEBRYAL
01/07/2021
Special inspection requirement — Final
GEORGE GHEBRYAL
01/07/2021
Special inspection requirement — Energy Code Compliance Inspections
GEORGE GHEBRYAL
01/07/2021
Special inspection requirement — Concrete - Cast-In-Place
GEORGE GHEBRYAL
01/07/2021
Special inspection requirement — Concrete - Precast
GEORGE GHEBRYAL
01/07/2021
Special inspection requirement — Masonry
GEORGE GHEBRYAL
01/07/2021
Special inspection requirement — Post-installed Anchors
GEORGE GHEBRYAL
01/07/2021
Special inspection requirement — Structural Steel - Details
GEORGE GHEBRYAL
01/07/2021
Special inspection requirement — Structural Steel - High Strength Bolting
GEORGE GHEBRYAL
06/29/2020
Signed off — Alteration
Replace 3 existing AC units. New units to be installed on existing dunnage.
X00224761-I1
01/09/2020
Permit issued — Mechanical Systems
X00224761-I1-MS
12/02/2019
Permit issued — Mechanical Systems
X00224761-I1-MS
10/04/2019
Filed — Alteration
Replace 3 existing AC units. New units to be installed on existing dunnage.
X00224761-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedUNI ASSOCIATES INC04/29/2026
DOB NOWEarth WorkSigned-offGIANFIA CORP11/10/2024
DOB NOWStructuralSigned-offGIANFIA CORP11/10/2024
DOB NOWFoundationSigned-offGIANFIA CORP04/15/2024
DOB NOWStructuralSigned-offGIANFIA CORP03/14/2024
DOB NOWMechanical SystemsSigned-offACME INDUSTRIAL INC09/25/2023
DOB NOWEarth WorkSigned-offGIANFIA CORP04/18/2023
DOB NOWStructuralSigned-offGIANFIA CORP03/15/2023
DOB NOWMechanical SystemsSigned-offACME INDUSTRIAL INC01/09/2020
DOB NOWMechanical SystemsSigned-offACME INDUSTRIAL INC12/02/2019
BISMHISSUEDACME INDUSTRIAL INC05/08/2018
BISOTISSUEDCROWN AC HEAT & POWER CORP07/08/2004
BISOTISSUEDMONARCH CONSTRUCTION04/04/2003
BISPLISSUEDSANTIS PLUMBING01/08/2003
BISOTISSUEDMONARCH CONSTRUCTION11/13/2002
BISMHISSUEDCROWN HVAC SERVICE CORP.06/15/2001
BISOTISSUEDCKR CONSTRUCTION CORP.08/23/1999
BISOTISSUEDICS BUILDERS, INC.12/27/1990
BISOTISSUEDCONSOLIDATED EDISON CO., INC.06/01/1990
1 project · most recent 10/13/2023
FiledStatusContractorScope
10/13/2023——67 heads
1 project · most recent 01/09/2018
General Wiring
FiledStatusContractorScope
01/09/2018Permit IssuedLOWY & DONNATH INC.General Wiring
1 project · most recent 10/24/2023
FiledStatusContractorScope
10/24/2023——1 scope_items
▾Special Inspection Requirements (DOB NOW) — 29
DateRequirementInspectorRole
06/13/2024Footing and FoundationGEORGE GHEBRYALprogress
06/13/2024Subgrade InspectionsGEORGE GHEBRYALspecial
06/13/2024Excavations - Sheeting, Shoring, and BracingGEORGE GHEBRYALspecial
06/13/2024Deep Foundation ElementsGEORGE GHEBRYALspecial
06/13/2024Subsurface Conditions – Fill Placement & In-Place DensityGEORGE GHEBRYALspecial
06/13/2024FinalGEORGE GHEBRYALprogress
05/10/2024Footing and FoundationGEORGE GHEBRYALprogress
05/10/2024Deep Foundation ElementsGEORGE GHEBRYALspecial
05/10/2024Excavations - Sheeting, Shoring, and BracingGEORGE GHEBRYALspecial
05/10/2024Subgrade InspectionsGEORGE GHEBRYALspecial
05/10/2024Subsurface Conditions – Fill Placement & In-Place DensityGEORGE GHEBRYALspecial
05/10/2024FinalGEORGE GHEBRYALprogress
08/31/2023Sprinkler SystemsGEORGE GHEBRYALspecial
08/31/2023Concrete - Cast-In-PlaceGEORGE GHEBRYALspecial
08/31/2023Subgrade InspectionsGEORGE GHEBRYALspecial
08/31/2023Subsurface Conditions – Fill Placement & In-Place DensityGEORGE GHEBRYALspecial
08/31/2023Deep Foundation ElementsGEORGE GHEBRYALspecial
08/31/2023FinalGEORGE GHEBRYALprogress
08/31/2023Footing and FoundationGEORGE GHEBRYALprogress
01/07/2021Structural Steel - WeldingGEORGE GHEBRYALspecial
01/07/2021Subsurface Conditions – Fill Placement & In-Place DensityGEORGE GHEBRYALspecial
01/07/2021FinalGEORGE GHEBRYALprogress
01/07/2021Energy Code Compliance InspectionsGEORGE GHEBRYALprogress
01/07/2021Concrete - Cast-In-PlaceGEORGE GHEBRYALspecial
01/07/2021Concrete - PrecastGEORGE GHEBRYALspecial
Latest 25 of 29.
▾Documents — 86 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch8
08/25/2026X00449254-S1Request digital key ↗
08/25/2026X00449254-P1Request digital key ↗
08/22/2026X00912053-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/26/2026X00224761-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
08/25/2026X00449254-I1Request digital key ↗
▸Applications & Permits3
▸BISPLAN / WORK APPROVAL APPLICATION2
05/07/2018220647389Open ↗
10/03/2017220419045Open ↗
▸BISWORK PERMIT APPLICATION1
05/08/2018220647389Open ↗
▸Seals & Professional Certifications41
▸DOB NOWSpecial Inspector Seal & Signature19
09/02/2026X00449254-I1Open ↗
09/02/2026X00449254-I1Open ↗
09/02/2026X00449254-I1Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/25/2026X00449254-P1Open ↗
08/25/2026X00449254-I1Open ↗
08/25/2026X00449254-S1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
09/02/2026X00449254-I1Open ↗
09/02/2026X00449254-I1Open ↗
08/27/2026X00449254-P1Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
01/15/2019220647389Open ↗
05/07/2018220647389Open ↗
05/07/2018220647389Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
05/07/2018220647389Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
05/07/2018220647389Open ↗
▸Trade Schedules & Equipment3
▸BISEQUIPMENT USE PERMITS1
02/28/2019220647389Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
02/28/2019220647389Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
09/20/2018220419045Open ↗
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/25/2026X00449254-S1Open ↗
08/25/2026X00449254-P1Open ↗
08/25/2026X00449254-I1Open ↗
Showing 3 of 8 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
05/07/2018220647389Open ↗
10/03/2017220419045Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
01/15/2019220647389Open ↗
05/08/2018220647389Open ↗
05/08/2018220647389Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
01/15/2019220647389Open ↗
▸Inspections & Test Reports1
▸DOB NOWTR5 Test Report1
08/13/2026X00449254-S1Open ↗
▸Approvals, Objections & Sign-offs5
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST4
02/28/2019220647389Open ↗
02/21/2019220647389Open ↗
01/15/2019220647389Open ↗
Showing 3 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION1
01/15/2019220647389Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT4
01/15/2019220647389Open ↗
11/01/2018220419045Open ↗
05/07/2018220647389Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms5
▸BISBOROUGH INTAKE FORM3
02/28/2019220647389Open ↗
01/15/2019220647389Open ↗
11/01/2018220419045Open ↗
▸BISEFILING COVER SHEET2
05/07/2018220647389Open ↗
10/03/2017220419045Open ↗