← Back
Over six families without stores
1557 SELWYN AVENUE
BRONX · Mount Eden-Claremont (West) · BIN 2007814
💬 Discuss this project
1920Year Built
2Stories
C1Building Class
R7-1Zoning
4,677 sfGross Floor Area
10Units
Rent Stabilized4 Open Violations ▸
Over six families without stores · Owner of record: 1557 BH LLC · 2,970 sf lot · 1.57 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Floor 239p · 1 filing · 20 docs
Floor 141p · 1 filing · 20 docs
Basement43p · 1 filing · 20 docs
Site & exterior6p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
LEFKO CAPITAL GROUP1907/08/2026
1557 BH LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/13/2020$460K—Private party → KOSH DEVELOPMENT BRONX LLC$98/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ADB ASSOCIATES1007/30/2025
ROBERT SIQECA PE104/30/2025
VASILIOS ARTEMIOU PE112/20/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NYC DESIGN FILE1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BUILDERS GROUP USA INCGeneral Contractor607/08/2026
POWER DIRECT ELECTRIC INCElectrical303/22/2026
TARGET PIPING NY LLCFire Protection107/08/2026
B&B MECH PLBG & HTG LLCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP56161107/30/2025
SHAHRISH SHUVO ENGINEERIN8524104/30/2025
Building Lifecycle
All (130)Filed (12)Permit Issued (6)Signed Off (5)Violation (27)Inspection (10)Objection (40)Special Inspection (30)
05/01/2026
Signed off — Alteration CO
Existing 2 story and basement, 2-Family to be converted into a 10-unit building
X01055985-I1
04/15/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/21/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/04/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/15/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/05/2025
Signed off — Alteration CO
Existing 2 story and basement, 2-Family to be converted into a 10-unit building
X01055985-S2
07/30/2025
Filed — Alteration CO
Existing 2 story and basement, 2-Family to be converted into a 10-unit building
X01055985-P8
07/16/2025
Signed off — Alteration CO
Existing 2 story and basement, 2-Family to be converted into a 10-unit building
X01055985-S1
07/16/2025
Special inspection requirement — Mechanical Systems
FAHAD FATEH
07/16/2025
Special inspection requirement — Final
FAHAD FATEH
07/16/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
07/16/2025
Special inspection requirement — Ventilation and air distribution system
FAHAD FATEH
07/16/2025
Special inspection requirement — Permanent certificate
FAHAD FATEH
07/16/2025
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
07/16/2025
Special inspection requirement — Maintenance information
FAHAD FATEH
07/16/2025
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
07/14/2025
Filed — Alteration CO
Existing 2 story and basement, 2-Family to be converted into a 10-unit building
X01055985-P7
07/09/2025
Signed off — Alteration CO
Existing 2 story and basement, 2-Family to be converted into a 10-unit building
X01055985-S3
07/09/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/09/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/07/2025
Signed off — Alteration CO
Existing 2 story and basement, 2-Family to be converted into a 10-unit building
X01055985-S4
07/07/2025
Filed — Alteration CO
Existing 2 story and basement, 2-Family to be converted into a 10-unit building
X01055985-P6
07/07/2025
Special inspection requirement — Mechanical Systems
FAHAD FATEH
07/07/2025
Special inspection requirement — Final
FAHAD FATEH
07/07/2025
Special inspection requirement — Permanent certificate
FAHAD FATEH
07/07/2025
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
07/07/2025
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
07/07/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
07/07/2025
Special inspection requirement — Maintenance information
FAHAD FATEH
07/07/2025
Special inspection requirement — Ventilation and air distribution system
FAHAD FATEH
07/01/2025
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
06/23/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
06/18/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/04/2025
Objection resolved — Addressed
06/02/2025
Objection raised — Admin
05/28/2025
Permit issued — General Construction
X01055985-I1-GC
05/22/2025
Filed — Alteration CO
Existing 2 story and basement, 2-Family to be converted into a 10-unit building
X01055985-P5
05/15/2025
Permit issued — Structural
X01055985-S4-ST
04/30/2025
Filed — Alteration CO
Existing 2 story and basement, 2-Family to be converted into a 10-unit building
X01055985-S4
04/30/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Shahrish Shuvo
04/30/2025
Special inspection requirement — Structural Cold-Formed Steel
Shahrish Shuvo
04/30/2025
Special inspection requirement — Structural Steel - Details
Shahrish Shuvo
04/24/2025
Filed — Alteration CO
Existing 2 story and basement, 2-Family to be converted into a 10-unit building
X01055985-P4
04/08/2025
Violation issued (ECB, closed)
Construction
04/07/2025
Violation issued (ECB, closed)
Construction
04/01/2025
Filed — Alteration CO
Existing 2 story and basement, 2-Family to be converted into a 10-unit building
X01055985-P2
03/26/2025
Filed — Alteration CO
Existing 2 story and basement, 2-Family to be converted into a 10-unit building
X01055985-P1
03/19/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
03/19/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
03/19/2025
Special inspection requirement — Maintenance information
FAHAD FATEH
03/19/2025
Special inspection requirement — Permanent certificate
FAHAD FATEH
03/19/2025
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
03/19/2025
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
03/19/2025
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
03/17/2025
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
03/13/2025
Permit issued — Sprinklers
X01055985-S3-EW-SP
03/10/2025
Permit issued — General Construction
X01055985-I1-GC
02/28/2025
Permit issued — Plumbing
X01055985-S2-PL
02/27/2025
Permit issued — Mechanical Systems
X01055985-S1-MS
01/31/2025
Objection resolved — Addressed
Latest 60 of 130 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedBUILDERS GROUP USA05/28/2025
DOB NOWStructuralSigned-offBUILDERS GROUP USA05/15/2025
DOB NOWSprinklersSigned-offTARGET PIPING NY LLC03/13/2025
DOB NOWGeneral ConstructionPermit IssuedBUILDERS GROUP USA03/10/2025
DOB NOWPlumbingSigned-offTARGET PIPING NY LLC02/28/2025
DOB NOWMechanical SystemsSigned-offBUILDERS GROUP USA02/27/2025
1 project · most recent 07/30/2025
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
07/30/2025Permit IssuedBUILDERS GROUP USA INCHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Daikin 2MXM18AVJU9 249,900 BTU · Heat Pump Outdoor ×21
RXC12ACVJU 46,600 BTU · Condensing Unit ×6
4MXM36AVJU9 68,600 BTU · Split System ×3
Ventilation
Nutone AEN110 110 CFM · Exhaust Fan ×30
QTXEN150 150 CFM · Exhaust Fan ×30
1 project · most recent 07/30/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
07/30/2025Signed-offTARGET PIPING NY LLCGas, Storm, Water/Sanitary
4 projects · most recent 01/07/2026
General Wiring
FiledStatusContractorScope
01/07/2026CompletePOWER DIRECT ELECTRIC INCGeneral Wiring
09/17/2025CompletePOWER DIRECT ELECTRIC INCGeneral Wiring
02/20/2025CompletePOWER DIRECT ELECTRIC INC—
05/17/2022CompleteAPPROVED ELECTRIC CORP.General Wiring
1 project · most recent 07/30/2025
Steel
FiledStatusContractorScope
07/30/2025Permit IssuedBUILDERS GROUP USA INCSteel
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
04/15/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/21/2025Pass-Final CND-Occupancy InspectionPassView ↗
11/04/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/15/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/09/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/09/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/01/2025Pass-Final SP - Up to 3 Requested FloorsPassView ↗
06/23/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/18/2025Pass-Final CND-Occupancy InspectionPassView ↗
03/17/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 30
DateRequirementInspectorRole
07/16/2025Mechanical SystemsFAHAD FATEHspecial
07/16/2025FinalFAHAD FATEHprogress
07/16/2025HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
07/16/2025Ventilation and air distribution systemFAHAD FATEHenergy_progress
07/16/2025Permanent certificateFAHAD FATEHenergy_progress
07/16/2025HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
07/16/2025Maintenance informationFAHAD FATEHenergy_progress
07/16/2025HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
07/07/2025Mechanical SystemsFAHAD FATEHspecial
07/07/2025FinalFAHAD FATEHprogress
07/07/2025Permanent certificateFAHAD FATEHenergy_progress
07/07/2025HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
07/07/2025HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
07/07/2025HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
07/07/2025Maintenance informationFAHAD FATEHenergy_progress
07/07/2025Ventilation and air distribution systemFAHAD FATEHenergy_progress
04/30/2025Structural Stability – Alterations of existing buildingsShahrish Shuvospecial
04/30/2025Structural Cold-Formed SteelShahrish Shuvospecial
04/30/2025Structural Steel - DetailsShahrish Shuvospecial
03/19/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
03/19/2025HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
03/19/2025Maintenance informationFAHAD FATEHenergy_progress
03/19/2025Permanent certificateFAHAD FATEHenergy_progress
03/19/2025HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
03/19/2025Energy Code Compliance InspectionsFAHAD FATEHprogress
Latest 25 of 30.
▾Documents — 64 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch12
08/19/2026X01055985-P6Request digital key ↗
08/19/2026X01055985-P4Request digital key ↗
08/19/2026X01055985-P2Request digital key ↗
Showing 3 of 12 on file for this type
▸Zoning, Tax Lot & Property Records4
▸DOB NOWHouse Number Verification: TOPO Stamp4
08/13/2026X01055985-P4Open ↗
08/13/2026X01055985-P2Open ↗
08/13/2026X01055985-P8Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications24
▸DOB NOWDPL-1: Design Professional Seal & Signature12
08/19/2026X01055985-S4Open ↗
08/19/2026X01055985-P5Open ↗
08/19/2026X01055985-P4Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
09/30/2026X01055985-S1Open ↗
09/30/2026X01055985-S1Open ↗
09/01/2026X01055985-S4Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/30/2026X01055985-S1Open ↗
09/01/2026X01055985-S4Open ↗
08/28/2026X01055985-P1Open ↗
Showing 3 of 5 on file for this type
▸Safety & Tenant Protection7
▸DOB NOWStreet Tree Checklist4
08/13/2026X01055985-P4Open ↗
08/13/2026X01055985-P2Open ↗
08/13/2026X01055985-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWStreet Trees Site Plan1
08/13/2026X01055985-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026X01055985-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026X01055985-I1Open ↗
▸Environmental & Asbestos12
▸DOB NOWDEP ACP-5: Asbestos Assessment Report12
08/19/2026X01055985-P4Open ↗
08/19/2026X01055985-P2Open ↗
08/19/2026X01055985-P1Open ↗
Showing 3 of 12 on file for this type
▸Other Documents5
▸DOB NOWProperty Ownership Certification4
08/19/2026X01055985-P4Open ↗
08/19/2026X01055985-P2Open ↗
08/19/2026X01055985-P8Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWFinal Survey1
08/15/2026X01055985-I1Open ↗