Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Whole building & multi-floor projectsThe Bridge5 filings
Project X00347696Signed-off · 08/12/2025
Filing herwith for structural work as per plans in conjunction with New Building application # 210181248.
On file for this project
7 documents
Project X00347678Signed-off · 04/10/2025
Filing herewith for mechanical work as per plans related to New Building Filing 210181248.
On file for this project
10 documents
Filing herewith for Sprinkler Work as per plans related to New Building Filing 210181248.
On file for this project
5 documents · 1 drawing sheet
Latest 3 of 5 filings on this floor.
RoofThe Bridge4p · 4 filings · 4 docs
ElectricalFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Solar · Sprinklers · Structural
INSTALLATION OF MULTI-POINT SUSPENDED SCAFFOLDING IN ACCORDANCE WITH NYCC CHAPTER 33 BUILDING CODE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
On file for this project
4 documents · 1 drawing sheet
Project X01217656Signed-off · 07/22/2025
INSTALLATION OF AN ACTIVE SUB-SLAB DEPRESSURIZATION SYSTEM INCLUDING: SUB-SLAB GRAVEL ANDSLOTTED/SOLID PVC PIPING; SYSTEM MANIFOLDS AND ACCESSORIES; ABOVE GROUND INTERIOR STEEL PIPING; AND ROOF-MOUNTED VENT STACK WITH A FAN (FOR ACTIVE SSDS).
On file for this project
7 documents
INSTALLATION OF SOLAR PANELS ON EXISTING ROOF. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. NO CHANGE IN BULK
On file for this project
7 documents · 2 drawing sheets
Latest 3 of 4 filings on this floor.
BulkheadMultipoint project1p · 1 filing · 4 docs
Structural
INSTALLATION OF MULTI-POINT SUSPENDED SCAFFOLDING IN ACCORDANCE WITH NYCC CHAPTER 33 BUILDING CODE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
On file for this project
4 documents · 1 drawing sheet
Floor 8The Bridge1p · 2 filings · 4 docs
Fire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers · Structural
INSTALLATION OF TWO POINT SUSPENDED SCAFFOLDING IN ACCORDANCE WITH NYCC CHAPTER 33 BUILDING CODE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
On file for this project
4 documents · 1 drawing sheet
Project X01217656Signed-off · 07/22/2025
INSTALLATION OF AN ACTIVE SUB-SLAB DEPRESSURIZATION SYSTEM INCLUDING: SUB-SLAB GRAVEL ANDSLOTTED/SOLID PVC PIPING; SYSTEM MANIFOLDS AND ACCESSORIES; ABOVE GROUND INTERIOR STEEL PIPING; AND ROOF-MOUNTED VENT STACK WITH A FAN (FOR ACTIVE SSDS).
On file for this project
7 documents
Floor 7Multipoint project1p · 1 filing · 4 docs
Fire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers · Structural
INSTALLATION OF MULTI-POINT SUSPENDED SCAFFOLDING IN ACCORDANCE WITH NYCC CHAPTER 33 BUILDING CODE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
On file for this project
4 documents · 1 drawing sheet
Floor 6Multipoint project1p · 1 filing · 4 docs
Fire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers · Structural
INSTALLATION OF MULTI-POINT SUSPENDED SCAFFOLDING IN ACCORDANCE WITH NYCC CHAPTER 33 BUILDING CODE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
On file for this project
4 documents · 1 drawing sheet
Floor 5Multipoint project1p · 1 filing · 4 docs
Fire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers · Structural
INSTALLATION OF MULTI-POINT SUSPENDED SCAFFOLDING IN ACCORDANCE WITH NYCC CHAPTER 33 BUILDING CODE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
On file for this project
4 documents · 1 drawing sheet
Floor 4
Floor 3
Floor 2The Bridge1 filing
Fire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers · Structural
Project X01217656Signed-off · 07/22/2025
INSTALLATION OF AN ACTIVE SUB-SLAB DEPRESSURIZATION SYSTEM INCLUDING: SUB-SLAB GRAVEL ANDSLOTTED/SOLID PVC PIPING; SYSTEM MANIFOLDS AND ACCESSORIES; ABOVE GROUND INTERIOR STEEL PIPING; AND ROOF-MOUNTED VENT STACK WITH A FAN (FOR ACTIVE SSDS).
On file for this project
7 documents
Floor 1The Bridge2 filings
ElectricalFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers · Structural · Supported Scaffold
Project X01217656Signed-off · 07/22/2025
INSTALLATION OF AN ACTIVE SUB-SLAB DEPRESSURIZATION SYSTEM INCLUDING: SUB-SLAB GRAVEL ANDSLOTTED/SOLID PVC PIPING; SYSTEM MANIFOLDS AND ACCESSORIES; ABOVE GROUND INTERIOR STEEL PIPING; AND ROOF-MOUNTED VENT STACK WITH A FAN (FOR ACTIVE SSDS).
On file for this project
7 documents
PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents
Site & exteriorThe Bridge5 filings · 10 docs
ArchitectureEquipmentFire ProtectionPlumbingStructural
Issued Permit Scope
Construction Fence · Plumbing · Protection and Mechanical Methods · Sidewalk Shed · Sprinklers
Project X01210969Signed-off · 06/03/2025
FILING HEREWITH SITE PLUMBING WORK AS PER PLANS IN CONJUNCTION WITH NB APPLICATION 210181248.
On file for this project
3 documents
INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE NYC CODE 2022, NO CHANGES IN USE EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
On file for this project
2 documents · 3 drawing sheets
PROPOSAL TO INSTALL TEMPORARY CONSTRUCTION FENCE IN CONJUNCTION WITH NEW BUILDING FILING, JOB # 210181248. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
On file for this project
2 documents · 2 drawing sheets
Latest 3 of 5 filings on this floor.