Rent Stabilized0 Open Violations
Elevator apt, semi-fireproof with stores · Owner of record: 1559 BOONE AVENUE HOUSING DEVELOPMENT FU ND COMPANY · 10,000 sf lot · 3.75 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Roof4p · 4 filings · 4 docs
Bulkhead1p · 1 filing · 4 docs
Floor 81 filing
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 21 filing
Floor 12 filings
Site & exterior5 filings · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BRIDGE5207/08/2026
1559 BOONE AVE HDFC1203/21/2026
PLATINUM SERVICES NY807/08/2026
1559 BOONE AVENUE HOUSING DEVELOPMENT FU ND COMPANY103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/01/2019$2.6M—COMPASS JV FOUR LLC → 1559 BOONE AVENUE HOUSING DEVELOPMENT FUND COMPANY— not available
10/05/2016$1.2M—— → —— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LORING CONSULTING ENGINEERS, INC.1009/08/2025
AKRF, INC.105/22/2025
LEONARD J. STRANDBERG & ASSOCAITES104/21/2025
TECTONIC ENGINEERING104/08/2025
MCHENERY TESTING LAB106/05/2024
TOHFAZ UDDIN PE PC105/29/2024
ASHRAF CORP105/14/2024
SILMAN201/31/2024
PATUXENT ENGINEERING LLC212/27/2023
YL ENGINEERING PLLC210/03/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BMB BUILDING CONSULTING1603/21/2026
JM ZONING, LLC.803/21/2026
PATUXENT ENGINEERING403/21/2026
NKM ENGINEERING PLLC203/21/2026
EXPEDITE DEM203/21/2026
GREEN STUDIO203/21/2026
KD DESIGNS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
D.P. GROUP GENERAL CONTRAGeneral Contractor1207/08/2026
VAYA RESTORATION INCGeneral Contractor704/09/2026
PLATINUM SERVICES NY LLCGeneral Contractor307/08/2026
RO-SAL PLUMBING & HTG INC INC.Plumbing307/08/2026
RO-SAL PLBG HTG INCFire Protection207/08/2026
SEA BRIGHT SOLAR LLCGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
VIBRANALYSIS INC., DBA VT68641509/08/2025
NKM ENGINEERING PLLC6244104/08/2025
Building Lifecycle
All (183)Filed (22)Permit Issued (22)Signed Off (16)Violation (31)Inspection (10)Objection (52)Special Inspection (30)
08/28/2026
Signed off — Alteration
INSTALLATION OF SOLAR PANELS ON EXISTING ROOF. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. NO CHANGE IN BULK
X01196860-I1
01/07/2026
Signed off — Alteration
INSTALLATION OF TWO POINT SUSPENDED SCAFFOLDING IN ACCORDANCE WITH NYCC CHAPTER 33 BUILDING CODE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
X00982627-I1
01/07/2026
Signed off — Alteration
X00982646-I1
12/23/2025
Signed off — Alteration
X01210969-I1
12/15/2025
Signed off — Alteration
Filing herewith for plumbing work as per plans in conjunction with NB application #210181248.
X00347704-I1
12/12/2025
Signed off — Alteration
Filing herewith for mechanical work as per plans related to New Building Filing 210181248.
X00347678-I1
12/12/2025
Signed off — Alteration
X00693528-I1
12/12/2025
Signed off — Alteration
Filing herewith for Sprinkler Work as per plans related to New Building Filing 210181248.
X00634601-I1
12/08/2025
Permit issued — Suspended Scaffold
X00982627-I1-SC
12/08/2025
Permit issued — Suspended Scaffold
X00982646-I1-SC
12/05/2025
Signed off — Alteration
PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
X01062221-I1
10/14/2025
Signed off — Alteration
Propose temporary Standpipe work as per plan filed in conjunction with NB # 210181248.
X00914184-I1
10/14/2025
Signed off — Alteration
INSTALLATION OF AN ACTIVE SUB-SLAB DEPRESSURIZATION SYSTEM INCLUDING: SUB-SLAB GRAVEL ANDSLOTTED/SOLID PVC PIPING; SYSTEM MANIFOLDS AND ACCESSORIES; ABOVE GROUND INTERIOR STEEL PIPING; AND ROOF-MOUNTED VENT STACK WITH A FAN (FOR ACTIVE SSDS).
X01217656-I1
09/15/2025
Signed off — Alteration
PROPOSAL TO INSTALL TEMPORARY CONSTRUCTION FENCE IN CONJUNCTION WITH NEW BUILDING FILING, JOB # 210181248. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
X00941133-I1
09/12/2025
Signed off — Alteration
Filing herwith for structural work as per plans in conjunction with New Building application # 210181248.
X00347696-I1
09/08/2025
Filed — Alteration
Filing herewith for plumbing work as per plans in conjunction with NB application #210181248.
X00347704-P3
08/29/2025
Signed off — Alteration
X01058594-I1
08/29/2025
Special inspection requirement — HVAC-R and service water heating system controls
JUAN GOMEZ
08/29/2025
Special inspection requirement — Maintenance information
JUAN GOMEZ
08/29/2025
Special inspection requirement — HVAC-R and service water heating equipment
JUAN GOMEZ
08/29/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
JUAN GOMEZ
08/29/2025
Special inspection requirement — Post-installed Anchors
JUAN GOMEZ
08/29/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JUAN GOMEZ
08/29/2025
Special inspection requirement — Energy Code Compliance Inspections
JUAN GOMEZ
08/29/2025
Special inspection requirement — HVAC insulation and sealing
JUAN GOMEZ
08/20/2025
Inspection — Pass-Final SP - More than 10 Requested Floors
Pass
View inspection ↗
08/18/2025
Inspection — Certified Sprinkler (SP) - Booster Pump Test
Certified
View inspection ↗
08/18/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
08/12/2025
Signed off — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE NYC CODE 2022, NO CHANGES IN USE EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
X00999313-I1
08/12/2025
Filed — Alteration
Filing herewith for Sprinkler Work as per plans related to New Building Filing 210181248.
X00634601-P1
08/12/2025
Permit issued — Structural
X00347696-I1-ST
08/09/2025
Violation issued (ECB, closed)
Unknown
08/07/2025
Special inspection requirement — Mechanical Systems
JUAN GOMEZ
08/07/2025
Special inspection requirement — Shutoff dampers
JUAN GOMEZ
08/07/2025
Special inspection requirement — HVAC insulation and sealing
JUAN GOMEZ
08/07/2025
Special inspection requirement — HVAC and service water heating equipment
JUAN GOMEZ
08/07/2025
Special inspection requirement — Maintenance information
JUAN GOMEZ
08/07/2025
Special inspection requirement — HVAC and service water heating system controls
JUAN GOMEZ
08/07/2025
Special inspection requirement — Final
JUAN GOMEZ
08/07/2025
Special inspection requirement — Heating Systems
JUAN GOMEZ
08/06/2025
Special inspection requirement — Sprinkler Systems
JUAN GOMEZ
08/06/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JUAN GOMEZ
08/06/2025
Special inspection requirement — Post-installed Anchors
JUAN GOMEZ
08/05/2025
Inspection — Pass-Final SP - More than 10 Requested Floors
Pass
View inspection ↗
07/31/2025
Filed — Alteration
Filing herewith for plumbing work as per plans in conjunction with NB application #210181248.
X00347704-P2
07/31/2025
Filed — Alteration
Filing herewith for mechanical work as per plans related to New Building Filing 210181248.
X00347678-P1
07/23/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JUAN GOMEZ
07/23/2025
Special inspection requirement — Energy Code Compliance Inspections
JUAN GOMEZ
07/23/2025
Special inspection requirement — HVAC-R and service water heating equipment
JUAN GOMEZ
07/23/2025
Special inspection requirement — HVAC insulation and sealing
JUAN GOMEZ
07/23/2025
Special inspection requirement — Maintenance information
JUAN GOMEZ
07/23/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
JUAN GOMEZ
07/23/2025
Special inspection requirement — HVAC-R and service water heating system controls
JUAN GOMEZ
07/23/2025
Special inspection requirement — Post-installed Anchors
JUAN GOMEZ
07/22/2025
Permit issued — Mechanical Systems
X01217656-I1-MS
07/21/2025
Violation issued (ECB, closed)
Construction
06/09/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
06/03/2025
Permit issued — Plumbing
X01210969-I1-PL
06/03/2025
Objection resolved — Addressed
06/02/2025
Objection resolved — Addressed
Latest 60 of 183 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldSigned-offVAYA RESTORATION INC12/08/2025
DOB NOWSuspended ScaffoldSigned-offVAYA RESTORATION INC12/08/2025
DOB NOWStructuralSigned-offD.P. GROUP GENERAL CONTRA08/12/2025
DOB NOWMechanical SystemsSigned-offD.P. GROUP GENERAL CONTRA07/22/2025
DOB NOWPlumbingSigned-offRO-SAL PLUMBING & HTG INC06/03/2025
DOB NOWSidewalk ShedSigned-offPLATINUM SERVICES NY LLC05/12/2025
DOB NOWSolarSigned-offSEA BRIGHT SOLAR LLC04/17/2025
DOB NOWMechanical SystemsSigned-offD.P. GROUP GENERAL CONTRA04/10/2025
DOB NOWMechanical SystemsSigned-offD.P. GROUP GENERAL CONTRA04/10/2025
DOB NOWSprinklersSigned-offRO-SAL PLBG HTG INC03/31/2025
DOB NOWConstruction FenceSigned-offD.P. GROUP GENERAL CONTRA02/07/2025
DOB NOWPlumbingSigned-offRO-SAL PLUMBING & HTG INC11/19/2024
DOB NOWSupported ScaffoldSigned-offVAYA RESTORATION INC06/06/2024
DOB NOWProtection and Mechanical MethodsSigned-offPLATINUM SERVICES NY LLC05/30/2024
DOB NOWSidewalk ShedSigned-offPLATINUM SERVICES NY LLC05/15/2024
DOB NOWSprinklersSigned-offRO-SAL PLBG HTG INC04/10/2024
DOB NOWConstruction FenceSigned-offD.P. GROUP GENERAL CONTRA02/16/2024
DOB NOWSuspended ScaffoldSigned-offVAYA RESTORATION INC12/28/2023
DOB NOWSuspended ScaffoldSigned-offVAYA RESTORATION INC12/27/2023
DOB NOWPlumbingSigned-offRO-SAL PLUMBING & HTG INC11/29/2023
DOB NOWConstruction FenceSigned-offD.P. GROUP GENERAL CONTRA10/17/2023
DOB NOWConstruction FenceSigned-offD.P. GROUP GENERAL CONTRA04/27/2023
BIS—ISSUEDD.P. GROUP GENERAL CONTRA03/14/2025
BIS—ISSUEDD.P. GROUP GENERAL CONTRA03/14/2025
BIS—ISSUEDD.P. GROUP GENERAL CONTRA03/19/2024
BIS—ISSUEDD.P. GROUP GENERAL CONTRA03/19/2024
BIS—ISSUEDD.P. GROUP GENERAL CONTRA08/25/2023
BIS—ISSUEDD.P. GROUP GENERAL CONTRA08/25/2023
6 projects · most recent 02/24/2026
General Wiring
FiledStatusContractorScope
02/24/2026CompleteALL PURPOSE ELECTRIC CORPGeneral Wiring
03/11/2025CompleteAMBER ELECTL CONTNG INC—
06/05/2024CompleteILLUMINOUS ELECTRIC CORP.—
05/24/2024CompleteTUXEDO ELEC'L CONTR'G INC—
02/09/2024CompleteILLUMINOUS ELECTRIC CORP.General Wiring
10/31/2023CompleteALL PURPOSE ELECTRIC CORP1 meters, 1 new_meters
1 project · most recent 04/08/2025
FiledStatusContractorScope
04/08/2025Signed-offSEA BRIGHT SOLAR LLC28 panels, 13.44 kw, 4,000 roof_area_sqft
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
08/20/2025Pass-Final SP - More than 10 Requested FloorsPassView ↗
08/18/2025Certified Sprinkler (SP) - Booster Pump TestCertifiedView ↗
08/18/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/05/2025Pass-Final SP - More than 10 Requested FloorsPassView ↗
06/09/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
11/08/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/25/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
06/13/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
03/13/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
01/18/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 49
DateRequirementInspectorRole
08/29/2025HVAC-R and service water heating system controlsJUAN GOMEZenergy_progress
08/29/2025Maintenance informationJUAN GOMEZenergy_progress
08/29/2025HVAC-R and service water heating equipmentJUAN GOMEZenergy_progress
08/29/2025HVAC-R and service water piping design and insulationJUAN GOMEZenergy_progress
08/29/2025Post-installed AnchorsJUAN GOMEZspecial
08/29/2025Fire-Resistant Penetrations and JointsJUAN GOMEZspecial
08/29/2025Energy Code Compliance InspectionsJUAN GOMEZprogress
08/29/2025HVAC insulation and sealing JUAN GOMEZenergy_progress
08/07/2025Mechanical SystemsJUAN GOMEZspecial
08/07/2025Shutoff dampersJUAN GOMEZenergy_progress
08/07/2025HVAC insulation and sealing JUAN GOMEZenergy_progress
08/07/2025HVAC and service water heating equipment JUAN GOMEZenergy_progress
08/07/2025Maintenance informationJUAN GOMEZenergy_progress
08/07/2025HVAC and service water heating system controls JUAN GOMEZenergy_progress
08/07/2025FinalJUAN GOMEZprogress
08/07/2025Heating SystemsJUAN GOMEZspecial
08/06/2025Sprinkler SystemsJUAN GOMEZspecial
08/06/2025Fire-Resistant Penetrations and JointsJUAN GOMEZspecial
08/06/2025Post-installed AnchorsJUAN GOMEZspecial
07/23/2025Fire-Resistant Penetrations and JointsJUAN GOMEZspecial
07/23/2025Energy Code Compliance InspectionsJUAN GOMEZprogress
07/23/2025HVAC-R and service water heating equipmentJUAN GOMEZenergy_progress
07/23/2025HVAC insulation and sealing JUAN GOMEZenergy_progress
07/23/2025Maintenance informationJUAN GOMEZenergy_progress
07/23/2025HVAC-R and service water piping design and insulationJUAN GOMEZenergy_progress
Latest 25 of 49.
▾Documents — 254 on file (BIS + DOB NOW)
▸Plans & Drawings22
▸DOB NOWPlans/Sketch14
08/24/2026X00693528-I1Request digital key ↗
08/23/2026X00856403-I1Request digital key ↗
08/22/2026X00914184-I1Request digital key ↗
Showing 3 of 14 on file for this type
▸DOB NOWPlans/Sketch - Plumbing4
08/18/2026X00347704-P3Request digital key ↗
08/18/2026X00347704-P2Request digital key ↗
08/18/2026X00347704-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems2
08/18/2026X00347678-P1Request digital key ↗
08/14/2026X00347678-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural2
08/26/2026X00347696-I1Request digital key ↗
08/15/2026X00347696-P1Request digital key ↗
▸Applications & Permits30
▸BISPLAN / WORK APPROVAL APPLICATION22
08/18/2025210181248Open ↗
07/23/2025210181248Open ↗
06/18/2025210181248Open ↗
Showing 3 of 22 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION5
07/25/2023210181248Open ↗
07/06/2023210181248Open ↗
08/09/2022240285071Open ↗
Showing 3 of 5 on file for this type
▸BISWORK PERMIT APPLICATION3
09/13/2023210181248Open ↗
09/13/2023210181248Open ↗
09/13/2023210181248Open ↗
▸Zoning, Tax Lot & Property Records6
▸BISZONING DIAGRAM3
02/22/2024210181248Open ↗
04/11/2022210181248Open ↗
03/30/2022210181248Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
10/19/2021210181248Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
05/12/2025210181248Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
10/19/2021210181248Open ↗
▸Seals & Professional Certifications61
▸DOB NOWDPL-1: Design Professional Seal & Signature23
08/26/2026X00347696-I1Open ↗
08/24/2026X00693528-I1Open ↗
08/23/2026X00856403-I1Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWProgress Inspector Seal & Signature20
09/01/2026X00347704-P3Open ↗
09/01/2026X00347704-P3Open ↗
09/01/2026X00347704-P3Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature13
09/01/2026X00347704-P3Open ↗
09/01/2026X00347704-P3Open ↗
08/29/2026X00693528-I1Open ↗
Showing 3 of 13 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
08/18/2023210181248Open ↗
08/18/2023210181248Open ↗
08/18/2023210181248Open ↗
Showing 3 of 4 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
12/17/2020240285071Open ↗
▸Trade Schedules & Equipment3
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
11/07/2025210181248Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
11/07/2025210181248Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
11/20/2025210181248Open ↗
▸Safety & Tenant Protection3
▸BISSTREET TREE CHECKLIST2
07/01/2022240285071Open ↗
08/16/2021210181248Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
08/16/2023210181248Open ↗
▸Environmental & Asbestos19
▸DOB NOWOER: Notice to Proceed11
08/26/2026X00347696-I1Open ↗
08/13/2026X00347678-P1Open ↗
08/13/2026X00347704-P1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWOER: Notice of Satisfaction6
08/13/2026X01217656-I1Open ↗
08/13/2026X01210969-I1Open ↗
08/13/2026X00347678-I1Open ↗
Showing 3 of 6 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION1
07/01/2022240285071Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED1
10/19/2021210181248Open ↗
▸Energy Compliance22
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY6
11/07/2025210181248Open ↗
08/03/2023210181248Open ↗
08/03/2023210181248Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026X00347678-I1Open ↗
08/13/2026X00347704-I1Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
11/07/2025210181248Open ↗
▸BISINTERIOR LIGHTING POWER1
11/07/2025210181248Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
11/07/2025210181248Open ↗
▸BISFENESTRATION AREAS1
11/07/2025210181248Open ↗
▸BISAIR SEALING AND INSULATION - TESTING1
11/07/2025210181248Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
11/07/2025210181248Open ↗
▸BISLIGHTING IN DWELLING UNITS1
11/07/2025210181248Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
11/07/2025210181248Open ↗
▸BISELECTRIC MOTORS1
11/07/2025210181248Open ↗
▸BISLIGHTING CONTROLS1
11/07/2025210181248Open ↗
▸BIS* HVAC INSULATION AND SEALING1
11/07/2025210181248Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
08/18/2023210181248Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
11/07/2025210181248Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026X00347678-I1Open ↗
▸Inspections & Test Reports33
▸BISTECHNICAL REPORT: RESPONSIBILITY14
11/07/2025210181248Open ↗
11/07/2025210181248Open ↗
11/07/2025210181248Open ↗
Showing 3 of 14 on file for this type
▸BISDEMOLITION (DM) JOB SIGNOFF2
11/20/2025210181248Open ↗
08/14/2023210181248Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
12/05/2025210181248Open ↗
08/18/2023210181248Open ↗
▸BISDEEP FOUNDATIONS / PILES2
11/05/2025210181248Open ↗
11/05/2025210181248Open ↗
▸BISTR2: CONCRETE FIELD TESTING TECHNICAL REPORT1
08/14/2023210181248Open ↗
▸BISCONCRETE - PRECAST1
11/05/2025210181248Open ↗
▸BISSTRUCTURAL STEEL - DETAILS1
11/05/2025210181248Open ↗
▸BISTR3: CONCRETE DESIGN MIX TECHNICAL REPORT1
08/16/2023210181248Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
11/05/2025210181248Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
11/05/2025210181248Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
11/05/2025210181248Open ↗
▸BISMASONRY1
11/05/2025210181248Open ↗
▸BISPOST-INSTALLED ANCHORS1
11/05/2025210181248Open ↗
▸BISSTRUCTURAL STEEL - HIGH STRENGTH BOLTING1
11/05/2025210181248Open ↗
▸BISSTRUCTURAL STEEL - WELDING1
11/05/2025210181248Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP1
11/05/2025210181248Open ↗
▸BISSOIL REPORT1
04/11/2022210181248Open ↗
▸Approvals, Objections & Sign-offs12
▸BISSCHEDULE A - OCCUPANCY / USE10
07/23/2025210181248Open ↗
06/18/2025210181248Open ↗
06/16/2025210181248Open ↗
Showing 3 of 10 on file for this type
▸BISHCR LETTER1
12/04/2025210181248Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026X01196860-I1Open ↗
▸Cost, Insurance & Ownership2
▸BISPROJECT-SPECIFIC GL INSURANCE2
09/13/2023210181248Open ↗
08/14/2023210181248Open ↗
▸Filing & Intake Forms15
▸BISADDITIONAL INFORMATION12
08/12/2025210181248Open ↗
08/12/2025210181248Open ↗
08/04/2025210181248Open ↗
Showing 3 of 12 on file for this type
▸BISEFILING COVER SHEET2
05/11/2020210181248Open ↗
05/11/2020210181248Open ↗
▸BISBOROUGH INTAKE FORM1
09/13/2023210181248Open ↗
▸Other Documents11
▸DOB NOWCalculations2
08/13/2026X00982627-I1Open ↗
08/13/2026X00982646-I1Open ↗
▸DOB NOWManufacturer's Specifications2
08/13/2026X00982646-I1Open ↗
08/13/2026X00982627-I1Open ↗
▸BISSHUTOFF DAMPERS1
11/07/2025210181248Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM1
08/04/2023210181248Open ↗
▸BISVESTIBULES1
11/07/2025210181248Open ↗
▸BISSTRUCTURAL COLD-FORMED STEEL1
11/05/2025210181248Open ↗
▸BISMAINTENANCE INFORMATION1
11/07/2025210181248Open ↗
▸BISHVAC & SERVICE WATER PIPING DESIGN AND INSULATION1
11/07/2025210181248Open ↗
▸BISPROTECTION OF EXPOSED FOUNDATION INSULATION1
11/07/2025210181248Open ↗