← Back
BuildNYC
Over six families without stores
1559 DEKALB AVENUE
BROOKLYN · BIN 3073659
💬 Discuss this project
1931Year Built
4Stories
C1Building Class
R6Zoning
8,060 sfGross Floor Area
8Units
Rent Stabilized1 Active Violation ▸FDNY Report ↗
Over six families without stores · Owner of record: 1559 Dekalb · 3,100 sf lot · 2.6 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalCivil
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 4Proposed boiler work1p · 1 filing · 18 docs
Floor 3Proposed boiler work1 filing · 18 docs
Floor 2
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Oasis Apartment1503/21/2026
1559 Dekalb203/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/28/2022$2.0M—Oasis Apartment → 1559 DEKALB LLC$248/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Harry Tenenbaum, PE202/10/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Mei Buildings Services403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Fortress ConstructionGeneral Contractor403/21/2026
Ipex Plumbing & HeatingPlumbing103/21/2026
Rugova GroupPlumbing107/08/2026
All Hour Sewer ServicePlumbing107/12/2016
H2O Concept Plumbing & HeatingPlumbing107/16/2013
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
M. International Engineering3129202/10/2020
Building Lifecycle
12/10/2025
Boiler inspection report filed
Initial · no defects · Accepted
11/20/2025
§27-2107 ADM code owner failed to file a valid registration statement with the department as required by ADM code §27-2097 and is therefore subject…
HPD violation · closed
06/09/2025
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · closed
12/04/2024
Boiler inspection report filed
Initial · no defects · Accepted
04/09/2024
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · closed
38 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentPermit IssuedRugova Group12/21/2019
BISPLISSUEDRugova Group12/14/2019
BISOTISSUEDFortress Construction02/07/2019
BISPLISSUEDRugova Group11/20/2018
BISOTISSUEDFortress Construction11/09/2018
BISMHISSUEDFortress Construction03/08/2018
BISPLISSUEDIpex Plumbing and Heating02/22/2018
BISOTISSUEDFortress Construction01/10/2018
BISOTISSUEDFortress Construction04/12/2017
BISPLISSUEDAll Hour Sewer Service07/12/2016
BISOTISSUEDFortress Construction06/10/2016
BISPLISSUEDH2O Concept Plumbing & Heating07/16/2013
BISOTISSUEDFortress Construction06/18/2013
BISOTISSUEDFortress Construction12/19/2012
1 project · most recent 04/12/2019
General Wiring
FiledStatusContractorScope
04/12/2019CompleteSalvatore Campisi & SonsGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
02/11/2020Fire-Resistant Penetrations and JointsNANIK MASSANDspecial
02/11/2020Heating SystemsNANIK MASSANDspecial
02/11/2020Maintenance informationNANIK MASSANDenergy_progress
02/11/2020HVAC and service water heating system controls NANIK MASSANDenergy_progress
02/11/2020HVAC and service water heating equipment NANIK MASSANDenergy_progress
01/14/2020Fire-Resistant Penetrations and JointsNANIK MASSANDspecial
01/14/2020Heating SystemsNANIK MASSANDspecial
01/14/2020HVAC and service water heating system controls NANIK MASSANDenergy_progress
01/14/2020Maintenance informationNANIK MASSANDenergy_progress
01/14/2020HVAC and service water heating equipment NANIK MASSANDenergy_progress
174 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account