156-10 BAISLEY BOULEVARD
QUEENS · BIN 4624964
💬 Discuss this project
1942Year Built
3Stories
W1Building Class
R3XZoning
175,040 sfGross Floor Area
1Units
LL97 Covered14 Open Violations 0 unresolved · 14 paperwork only ▸FDNY Report ↗
Public elementary, junior or senior high · Owner of record: NYC DEPARTMENT OF EDUCATION · 443,900 sf lot · 0.39 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbing
Permit Issued — active, not yet Signed-off
RoofUnder Construction24p · 1 filing · 20 docs
Floor 1Under Construction67p · 1 filing · 20 docs
CellarUnder Construction16p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC SCHOOL CONSTRUCTION909/02/2026
NYC SCHOOL CONSTRUCTION AUTHORITY4007/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NYC SCA1207/20/2026
GREGORY CELLAMARE207/15/2026
HANSEN ENGINEERING, PC104/21/2026
THOMAS MOLNAR302/25/2026
IGOR SHIMANOVSKIY202/25/2026
TAREK M. ZEID, PE, PLLC208/28/2024
HOWARD I SHAPIRO & ASSOCIATES204/26/2024
SEAN P. CUNNINGHAM PE, PC104/01/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NY CONTRACTING & SAFETY CONSULTING203/21/2026
NYCDDC103/21/2026
NYC SCHOOL CONSTRUCTION AUTHORITY1503/21/2026
HOWARD I SHAPIRO ASSOCIATES403/21/2026
JMV ASSOCIATES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DARCON CONSTRUCTION INCGeneral Contractor2507/08/2026
TAMEER INCGeneral Contractor407/08/2026
EAGLE 1 MECHANICAL, INCPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
UNIVERSAL TESTING AND INS4002107/20/2026
Building Lifecycle
All (97)Filed (25)Permit Issued (24)Signed Off (2)Inspection (6)Objection (10)Special Inspection (30)
07/22/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/22/2026
Objection raised — Other
07/22/2026
Objection resolved — Addressed
07/22/2026
Objection resolved — Addressed
07/22/2026
Special inspection requirement — Final
NELSON LOPEZ
07/22/2026
Special inspection requirement — HVAC-R and service water heating system controls
NELSON LOPEZ
07/22/2026
Special inspection requirement — Energy Code Compliance Inspections
NELSON LOPEZ
07/22/2026
Special inspection requirement — Shutoff dampers
NELSON LOPEZ
07/22/2026
Special inspection requirement — Maintenance information
NELSON LOPEZ
07/22/2026
Special inspection requirement — Duct leakage testing, insulation and design
NELSON LOPEZ
07/22/2026
Special inspection requirement — HVAC-R and service water heating equipment
NELSON LOPEZ
07/22/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
NELSON LOPEZ
07/22/2026
Special inspection requirement — Mechanical Systems
NELSON LOPEZ
07/22/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
NELSON LOPEZ
07/20/2026
Filed — New Building
foundation and structural work for new field house at Q401.
Q00793388-A3
07/20/2026
Objection raised — Other
07/17/2026
Signed off — Alteration
SOE for Sanitary Service
Q01389707-I1
07/17/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/15/2026
Filed — New Building
foundation and structural work for new field house at Q401.
Q00793388-A2
07/09/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
NELSON LOPEZ
07/09/2026
Special inspection requirement — HVAC-R and service water heating system controls
NELSON LOPEZ
07/09/2026
Special inspection requirement — Shutoff dampers
NELSON LOPEZ
07/09/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
NELSON LOPEZ
07/09/2026
Special inspection requirement — Mechanical Systems
NELSON LOPEZ
07/09/2026
Special inspection requirement — Energy Code Compliance Inspections
NELSON LOPEZ
07/09/2026
Special inspection requirement — Duct leakage testing, insulation and design
NELSON LOPEZ
07/09/2026
Special inspection requirement — Maintenance information
NELSON LOPEZ
07/09/2026
Special inspection requirement — Final
NELSON LOPEZ
07/09/2026
Special inspection requirement — HVAC-R and service water heating equipment
NELSON LOPEZ
07/06/2026
Signed off — Alteration
SOE in conjunction with existing field house removal (Q00991916), new field house (DOB # Q00793388) and Alteration work (DOB # 421902418) including detention system.
Q01039519-I1
07/02/2026
Special inspection requirement — Mechanical Systems
NELSON LOPEZ
07/02/2026
Special inspection requirement — Post-installed Anchors
NELSON LOPEZ
07/02/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
NELSON LOPEZ
07/02/2026
Special inspection requirement — Final
NELSON LOPEZ
07/02/2026
Special inspection requirement — Shutoff dampers
07/02/2026
Special inspection requirement — HVAC-R and service water heating system controls
07/02/2026
Special inspection requirement — HVAC-R and service water heating equipment
07/02/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
06/26/2026
Permit issued — General Construction
Q00793388-S8-GC
06/26/2026
Permit issued — Foundation
Q00793388-S7-GC-CX
05/18/2026
Special inspection requirement — Fenestration areas
NELSON LOPEZ
05/18/2026
Special inspection requirement — Insulation placement and R values
NELSON LOPEZ
05/15/2026
Filed — New Building
foundation and structural work for new field house at Q401.
Q00793388-A1
05/15/2026
Filed — No Work
Q08033892-P2
05/08/2026
Permit issued — Support of Excavation
Q01389707-I1-SE
04/24/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/24/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/24/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/21/2026
Filed — Alteration
SOE for Sanitary Service
Q01389707-I1
03/17/2026
Permit issued — General Construction
Q00793388-I1-GC
03/17/2026
Permit issued — Earth Work
Q00793388-Z5-GC-CX
02/25/2026
Filed — New Building
foundation and structural work for new field house at Q401.
Q00793388-P7
02/25/2026
Filed — New Building
foundation and structural work for new field house at Q401.
Q00793388-P6
02/25/2026
Filed — New Building
foundation and structural work for new field house at Q401.
Q00793388-P9
02/25/2026
Filed — New Building
foundation and structural work for new field house at Q401.
Q00793388-P8
12/18/2025
Permit issued — Mechanical Systems
Q00793388-Z4-MS
12/16/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/15/2025
Permit issued — Structural
Q00793388-S7-GC-CX
09/10/2025
Permit issued — General Construction
Q00793388-S8-GC
08/28/2025
Permit issued — Plumbing
Q00793388-S4-PL
Latest 60 of 97 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedDARCON CONSTRUCTION INC06/26/2026
DOB NOWFoundationPermit IssuedDARCON CONSTRUCTION INC06/26/2026
DOB NOWSupport of ExcavationSigned-offDARCON CONSTRUCTION INC05/08/2026
DOB NOWGeneral ConstructionPermit IssuedDARCON CONSTRUCTION INC03/17/2026
DOB NOWEarth WorkSigned-offDARCON CONSTRUCTION INC03/17/2026
DOB NOWMechanical SystemsPermit IssuedTAMEER INC12/18/2025
DOB NOWStructuralPermit IssuedDARCON CONSTRUCTION INC09/15/2025
DOB NOWGeneral ConstructionPermit IssuedDARCON CONSTRUCTION INC09/10/2025
DOB NOWPlumbingPermit IssuedEAGLE 1 MECHANICAL, INC08/28/2025
DOB NOWMechanical SystemsSigned-offTAMEER INC08/28/2025
DOB NOWSupport of ExcavationSigned-offDARCON CONSTRUCTION INC07/01/2025
DOB NOWConstruction FencePermit IssuedDARCON CONSTRUCTION INC05/22/2025
DOB NOWGeneral ConstructionPermit IssuedDARCON CONSTRUCTION INC03/28/2025
DOB NOWEarth WorkSigned-offDARCON CONSTRUCTION INC03/28/2025
DOB NOWEarth WorkSigned-offDARCON CONSTRUCTION INC09/24/2024
DOB NOWStructuralPermit IssuedDARCON CONSTRUCTION INC09/16/2024
DOB NOWGeneral ConstructionPermit IssuedDARCON CONSTRUCTION INC09/04/2024
DOB NOWMechanical SystemsSigned-offTAMEER INC09/03/2024
DOB NOWPlumbingPermit IssuedEAGLE 1 MECHANICAL, INC09/03/2024
DOB NOWMechanical SystemsPermit IssuedTAMEER INC09/03/2024
DOB NOWGeneral ConstructionPermit IssuedDARCON CONSTRUCTION INC08/30/2024
DOB NOWSupport of ExcavationSigned-offDARCON CONSTRUCTION INC06/26/2024
DOB NOWSupport of ExcavationSigned-offDARCON CONSTRUCTION INC06/24/2024
DOB NOWConstruction FencePermit IssuedDARCON CONSTRUCTION INC04/02/2024
1 project · most recent 07/20/2026
Associated Ducts and Piping Heating and Air Conditioning Systems Refrigeration Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
07/20/2026Permit IssuedDARCON CONSTRUCTION INCAssociated Ducts and Piping, Heating and Air Conditioning Systems, Refrigeration Systems, Ventilation Systems
Heat / Cool
Lg ARNU123TRD4 HEATING CAPACITY 13,600 12,300 BTU · Heat Pump Outdoor ×2
ARNU183TQD4 HEATING CAPACITY: 21,500 19,100 BTU · Heat Pump Outdoor ×2
ARNU183M2A4 Heating capacity 21,500 BTU Ventilation capacity 525 CFM 19,100 BTU · Heat Pump Outdoor ×1
ARNU183TQD4 HEATING CAPACITY: 21,500 Ventilation capacity 875 19,100 BTU · Vrf Indoor ×1
ARNU243M2A4 HEATING CAPACITY 27,300 VENTILATION CAPACITY 500 24,200 BTU · Heat Pump Outdoor ×1
ARNU243TAA4 HEATING CAPACITY:27,300 Ventilation capacity 75 24,200 BTU · Vrf Indoor ×1
ARNU283M3A4 HEATING CAPACITY 31,500 VENTILATION CAPACITY 875 28,000 BTU · Vrf Indoor ×1
ARNU483B8A4 HEATING CAPACITY 54,200 VENTILATION CAPACITY 1200 48,100 BTU · Vrf Indoor ×1
ARUM096BTE5 Heating capacity 108,000 BTU Ventilation capacity 11,300 CFM 96,000 BTU · Heat Pump Outdoor ×1
ARUM121BTE5 Heating capacity 135,000 BTU Ventilation capacity 11,300 CFM 19,700 BTU · Heat Pump Outdoor ×1
LSN243HLV3 HEATING CAPACITY: 25,260 btu 24,000 BTU · Heat Pump Outdoor ×1
LSU243HLV3 HEATING CAPACITY: 25,260 24,000 BTU · Heat Pump Outdoor ×1
Ventilation
Loren Cook 90C17DH VF 90 ACEH 350 CFM · Exhaust Fan ×1
Ducts & Piping
Lg ×20
Other
Obar ×2
4 projects · most recent 05/27/2026
General Wiring
FiledStatusContractorScope
05/27/2026Permit IssuedELDOR ELECTRIC LLCGeneral Wiring
04/01/2026Permit IssuedELDOR ELECTRIC LLCGeneral Wiring
03/18/2025CompleteELDOR ELECTRIC LLC—
02/24/2025Permit IssuedELDOR ELECTRIC LLCGeneral Wiring
2 projects · most recent 04/21/2026
FiledStatusContractorScope
04/21/2026Signed-offDARCON CONSTRUCTION INC2 scope_items
08/28/2024Signed-offDARCON CONSTRUCTION INC2 scope_items
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
07/22/2026Pass-Final CND-Occupancy InspectionPassView ↗
07/17/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/24/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/24/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/24/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/16/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
07/22/2026HVAC-R and service water piping design and insulationNELSON LOPEZenergy_progress
07/22/2026HVAC-R and service water heating system controlsNELSON LOPEZenergy_progress
07/22/2026Energy Code Compliance InspectionsNELSON LOPEZprogress
07/22/2026FinalNELSON LOPEZprogress
07/22/2026Fire-Resistant Penetrations and JointsNELSON LOPEZspecial
07/22/2026Mechanical SystemsNELSON LOPEZspecial
07/22/2026Maintenance informationNELSON LOPEZenergy_progress
07/22/2026HVAC-R and service water heating equipmentNELSON LOPEZenergy_progress
07/22/2026Duct leakage testing, insulation and designNELSON LOPEZenergy_progress
07/22/2026Shutoff dampersNELSON LOPEZenergy_progress
07/09/2026Shutoff dampersNELSON LOPEZenergy_progress
07/09/2026HVAC-R and service water heating system controlsNELSON LOPEZenergy_progress
07/09/2026Duct leakage testing, insulation and designNELSON LOPEZenergy_progress
07/09/2026FinalNELSON LOPEZprogress
07/09/2026Energy Code Compliance InspectionsNELSON LOPEZprogress
07/09/2026Mechanical SystemsNELSON LOPEZspecial
07/09/2026HVAC-R and service water piping design and insulationNELSON LOPEZenergy_progress
07/09/2026Maintenance informationNELSON LOPEZenergy_progress
07/09/2026Fire-Resistant Penetrations and JointsNELSON LOPEZspecial
07/09/2026HVAC-R and service water heating equipmentNELSON LOPEZenergy_progress
07/02/2026Post-installed AnchorsNELSON LOPEZspecial
07/02/2026Shutoff dampers—energy_progress
07/02/2026HVAC-R and service water piping design and insulation—energy_progress
07/02/2026HVAC-R and service water heating system controls—energy_progress
07/02/2026HVAC-R and service water heating equipment—energy_progress
Latest 25 of 150.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
August Martin H.SEducation—
Project Q08033892 No Work · Approved · 01/09/2023
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 259 on file (BIS + DOB NOW)
▸Plans & Drawings23
▸DOB NOWPlans/Sketch21
08/25/2026Q00793388-P5Request digital key ↗
08/25/2026Q00793388-P4Request digital key ↗
08/25/2026Q00793388-P3Request digital key ↗
Showing 3 of 21 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly2
08/16/2026Q08033892-P2Request digital key ↗
08/16/2026Q08033892-I1Request digital key ↗
▸Applications & Permits3
▸DOB NOWDEP Stormwater Construction Permit3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Zoning, Tax Lot & Property Records11
▸DOB NOWZoning Exhibit form (1-5)5
08/25/2026Q00793388-A1Open ↗
08/13/2026Q00793388-P5Open ↗
08/13/2026Q00793388-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWZD1: DOB Zoning Diagram5
08/25/2026Q00793388-A1Open ↗
08/13/2026Q00793388-P3Open ↗
08/13/2026Q00793388-P7Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00793388-I1Open ↗
▸Seals & Professional Certifications82
▸DOB NOWProgress Inspector Seal & Signature39
09/29/2026Q00793388-S8Open ↗
09/29/2026Q00793388-S8Open ↗
09/29/2026Q00793388-S8Open ↗
Showing 3 of 39 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature23
08/25/2026Q00793388-P4Open ↗
08/25/2026Q00793388-P3Open ↗
08/25/2026Q00793388-Z5Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature20
09/29/2026Q00793388-S8Open ↗
09/25/2026Q00793388-P8Open ↗
09/25/2026Q00793388-P8Open ↗
Showing 3 of 20 on file for this type
▸Trade Schedules & Equipment11
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)11
08/13/2026Q00793388-P4Open ↗
08/13/2026Q00793388-P3Open ↗
08/13/2026Q00793388-S8Open ↗
Showing 3 of 11 on file for this type
▸Safety & Tenant Protection19
▸DOB NOWStreet Tree Checklist12
08/25/2026Q00793388-A1Open ↗
08/13/2026Q00793388-P9Open ↗
08/13/2026Q00793388-S7Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWNYCSCA - Approved Site Safety Plans1
08/13/2026Q01013847-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026Q00793388-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports3
▸DOB NOWSOIL REPORT2
08/13/2026Q00793388-P8Open ↗
08/13/2026Q00793388-S7Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q00793388-S7Open ↗
▸Approvals, Objections & Sign-offs47
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter23
08/25/2026Q00793388-A2Open ↗
08/25/2026Q00793388-A1Open ↗
08/17/2026Q01389707-I1Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)20
08/25/2026Q00793388-Z4Open ↗
08/25/2026Q00793388-A2Open ↗
08/25/2026Q00793388-A1Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)4
08/21/2026Q01039519-I1Open ↗
08/17/2026Q01389707-I1Open ↗
08/13/2026Q00793388-S7Open ↗
Showing 3 of 4 on file for this type
▸Other Documents60
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal26
08/25/2026Q00793388-I1Open ↗
08/25/2026Q00793388-A2Open ↗
08/25/2026Q00793388-A1Open ↗
Showing 3 of 26 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone12
08/25/2026Q00793388-A1Open ↗
Showing 1 of 12 on file for this type
▸DOB NOWSite Survey: Initial12
08/25/2026Q00793388-A1Open ↗
08/13/2026Q00793388-P8Open ↗
08/13/2026Q00793388-P6Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWProperty Ownership Certification5
08/25/2026Q00793388-P3Open ↗
08/25/2026Q00793388-I1Open ↗
08/25/2026Q00793388-A1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWAdjoining Owners Notification3
08/17/2026Q01389707-I1Open ↗
08/13/2026Q00793388-Z5Open ↗
08/13/2026Q01039519-I1Open ↗
▸DOB NOWNYCSCA Exhibit 22
08/21/2026Q01039519-I1Open ↗
08/17/2026Q01389707-I1Open ↗