← Back
Shopping center, with or without parking
156-10 NORTHERN BOULEVARD
QUEENS · Murray Hill-Broadway Flushing · BIN 4445001
💬 Discuss this project
1966Year Built
1Stories
K6Building Class
R5BZoning
48,585 sfGross Floor Area
15Units
LL97 Covered8 Open Violations 2 unresolved · 6 paperwork only ▸FDNY Report ↗
Shopping center, with or without parking · Owner of record: KINGSLAND ASSOCS · 109,505 sf lot · 0.44 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Floor 15p · 2 filings · 18 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
KINGSLAND ASSOCIATES2207/08/2026
KINGSLAND ASSOCS103/22/2026
KINGSLANO ASSOCIATE203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CHONG ENGINEERING, P.C.305/12/2026
H ARCHITECTURE P.C111/04/2025
PROSPECT ENGINEERING P.C101/02/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CNC-DESIGN SPACE203/21/2026
CYAN PLANNING CONSULTING203/21/2026
BMB BUILDING CONSULTING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HC DESIGN GROUP INCGeneral Contractor204/09/2026
CK PLUMBING & MECH INCPlumbing207/08/2026
DC BUILDING SERVICES INCFire Protection107/08/2026
PRISTINE AIR CONDITIONINGGeneral Contractor107/08/2026
UNITECH DESIGNScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CHONG ENGINEERING P.C.7411405/12/2026
Building Lifecycle
All (43)Filed (5)Permit Issued (7)Signed Off (4)Violation (11)Inspection (5)Special Inspection (11)
06/11/2026
Signed off — Alteration
Q01297896-I1
06/05/2026
Signed off — Alteration
HEREWITH FILE PLANS FOR INSTALLATION OF NEW AIR CONDENSING UNIT, AIR HANDLERS AND DIFFUSER FOR EXISTING COMMERCIAL SPACE. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
Q01312235-S1
06/05/2026
Signed off — Alteration
HEREWITH FILE PLANS FOR INSTALLATION OF NEW AIR CONDENSING UNIT, AIR HANDLERS AND DIFFUSER FOR EXISTING COMMERCIAL SPACE. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
Q01312235-I1
05/12/2026
Filed — Alteration
HEREWITH FILE PLANS FOR INSTALLATION OF NEW AIR CONDENSING UNIT, AIR HANDLERS AND DIFFUSER FOR EXISTING COMMERCIAL SPACE. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
Q01312235-P1
05/12/2026
Special inspection requirement — HVAC-R and service water heating system controls
Tae Chong
05/12/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Tae Chong
05/12/2026
Special inspection requirement — Mechanical Systems
Tae Chong
05/12/2026
Special inspection requirement — Final
Tae Chong
05/12/2026
Special inspection requirement — Energy Code Compliance Inspections
Tae Chong
05/12/2026
Special inspection requirement — HVAC-R and service water heating equipment
Tae Chong
03/18/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/18/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/13/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
02/09/2026
Permit issued — Sprinklers
Q01312235-S1-PL
02/06/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
12/16/2025
Permit issued — General Construction
Q01297896-I1-GC
12/04/2025
Permit issued — Sprinklers
Q01312235-S1-EW-SP
12/03/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/26/2025
Permit issued — Plumbing
Q01312235-S1-PL
11/19/2025
Permit issued — Mechanical Systems
Q01312235-I1-MS
11/17/2025
Permit issued — General Construction
Q01297896-I1-GC
11/10/2025
Filed — Alteration
HEREWITH FILE PLANS FOR INSTALLATION OF NEW AIR CONDENSING UNIT, AIR HANDLERS AND DIFFUSER FOR EXISTING COMMERCIAL SPACE. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
Q01312235-S1
11/10/2025
Filed — Alteration
HEREWITH FILE PLANS FOR INSTALLATION OF NEW AIR CONDENSING UNIT, AIR HANDLERS AND DIFFUSER FOR EXISTING COMMERCIAL SPACE. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
Q01312235-I1
11/04/2025
Filed — Alteration
Q01297896-I1
11/03/2025
Special inspection requirement — Energy Code Compliance Inspections
Tae Chong
11/03/2025
Special inspection requirement — HVAC-R and service water heating equipment
Tae Chong
11/03/2025
Special inspection requirement — HVAC-R and service water heating system controls
Tae Chong
11/03/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Tae Chong
10/31/2025
Special inspection requirement — Sprinkler Systems
Tae Chong
06/12/2024
Violation issued (FDNY_NOV, closed)
01/24/2020
Signed off — Alteration
PROPOSE TO INSTALL ILLUMINATED, NON FLASHING ACCESSORY BUSINESS SIGN. WORDING: (LOGO H) MART. GROCERIES & MORE.
Q00288735-I1
01/03/2020
Permit issued — Sign
Q00288735-I1-SG
01/02/2020
Filed — Alteration
PROPOSE TO INSTALL ILLUMINATED, NON FLASHING ACCESSORY BUSINESS SIGN. WORDING: (LOGO H) MART. GROCERIES & MORE.
Q00288735-I1
05/31/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/15/2017
Violation issued (ECB, closed)
Construction
03/07/2017
Violation issued (ECB, closed)
Unknown
09/15/2010
Violation issued (ECB, open)
Construction
10/13/2009
Violation issued (ECB, closed)
Unknown
09/24/2008
Violation issued (ECB, open)
Boilers
02/13/2004
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/23/2002
Violation issued (ECB, closed)
Signs
04/19/1993
Violation issued (DOB, closed)
VP*-VIOLATION UNSERVED ECB- DISMISSED
02/25/1993
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offCK PLUMBING & MECH INC02/09/2026
DOB NOWGeneral ConstructionSigned-offHC DESIGN GROUP12/16/2025
DOB NOWSprinklersSigned-offDC BUILDING SERVICES INC12/04/2025
DOB NOWPlumbingSigned-offCK PLUMBING & MECH INC11/26/2025
DOB NOWMechanical SystemsSigned-offPRISTINE AIR CONDITIONING11/19/2025
DOB NOWGeneral ConstructionSigned-offHC DESIGN GROUP11/17/2025
DOB NOWSignSigned-offUNITECH DESIGN INC01/03/2020
BISEQISSUEDLEE & COMPANY OF NY, INC04/21/2016
BIS—ISSUEDLEE & COMPANY OF NY, INC04/21/2016
BISBLISSUEDSTEPHEN BRAUN11/19/2009
BISOTISSUEDSHC NEW YORK INC03/27/2008
BISFPISSUEDNY BUSINESS FIRE SYSTEM INC.11/03/2006
BISPLISSUEDPLUMBING & HTG DOCTOR INC08/21/2006
BIS—ISSUEDDAE DONG CONSTRUCTION06/07/2006
BISEQISSUEDDAE DONG CONSTRUCTION06/07/2006
BISEQISSUEDDAE DONG CONSTRUCTION04/26/2006
BISOTISSUEDDAE DONG CONSTRUCTION04/26/2006
BISFPISSUEDFIRE FOE SYSTEMS CORP.07/11/2003
BISOTISSUEDNEXTCOM CONSTRUCTION, INC.07/29/2002
BISMHISSUEDCONTROLLED ENERGY SERVICES04/12/2002
BISPLISSUEDALKLEM PLUMBING INC03/22/2002
BISMHISSUEDP.A.I. DESIGN GROUP, INC.12/11/2001
BISOTISSUEDDABOCO INC. & DUANE READE INC.12/10/1998
BISEQISSUEDDABOCO INC. & DUANE READE INC.12/10/1998
BISBLISSUEDBAYSIDE FO CO.02/24/1995
BISEQISSUEDNA07/20/1993
BISPLISSUEDM BURTON P & H CORP07/20/1993
BIS—RE-ISSUEDTOP RIDGE BLDRS. INC.01/07/1993
1 project · most recent 05/12/2026
Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
05/12/2026Signed-offPRISTINE AIR CONDITIONINGAir Conditioning Systems, Ventilation Systems
Cooling
Mitsubishi Electric MUZ-WX12NL 12,000 BTU · Condensing Unit ×1
MXZ-SM48NLHZ 48,000 BTU · Condensing Unit ×1
Ventilation
Broan Model: L100E 130 CFM · Exhaust Fan ×1
Panasonic Model: V-0510VS1 100 CFM · Exhaust Fan ×1
1 project · most recent 05/12/2026
FiledStatusContractorScope
05/12/2026Signed-offDC BUILDING SERVICES INC22 heads
1 project · most recent 05/12/2026
Water/Sanitary
FiledStatusContractorScope
05/12/2026Signed-offCK PLUMBING & MECH INCWater/Sanitary
2 projects · most recent 12/29/2025
General Wiring
FiledStatusContractorScope
12/29/2025Permit IssuedPM ELEC'L MAINTENANCE INCGeneral Wiring
01/13/2020CompleteATMOS ELECTRIC SVCE CORP—
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
03/18/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/18/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/13/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
02/06/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/03/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 11
DateRequirementInspectorRole
05/12/2026HVAC-R and service water heating system controlsTae Chongenergy_progress
05/12/2026Fire-Resistant Penetrations and JointsTae Chongspecial
05/12/2026Mechanical SystemsTae Chongspecial
05/12/2026FinalTae Chongprogress
05/12/2026Energy Code Compliance InspectionsTae Chongprogress
05/12/2026HVAC-R and service water heating equipmentTae Chongenergy_progress
11/03/2025Energy Code Compliance InspectionsTae Chongprogress
11/03/2025HVAC-R and service water heating equipmentTae Chongenergy_progress
11/03/2025HVAC-R and service water heating system controlsTae Chongenergy_progress
11/03/2025Fire-Resistant Penetrations and JointsTae Chongspecial
10/31/2025Sprinkler SystemsTae Chongspecial
▾Tenants in the building
TenantSpaceFloorsRenovation projects
CBB BankOfficeFloor 1
Project Q01312235 Alteration · LOC Issued · 11/10/2025
Project Q01297896 Alteration · LOC Issued · 11/04/2025
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 52 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch4
08/18/2026Q01297896-I1Request digital key ↗
08/16/2026Q01312235-P1Request digital key ↗
08/16/2026Q01312235-S1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Sign1
08/28/2026Q00288735-I1Request digital key ↗
▸Applications & Permits9
▸BISPLAN / WORK APPROVAL APPLICATION7
07/15/2016402394789Open ↗
06/24/2016402394789Open ↗
04/25/2016402394789Open ↗
Showing 3 of 7 on file for this type
▸BISWORK PERMIT APPLICATION2
11/19/2009420105512Open ↗
03/27/2008410089005Open ↗
▸Seals & Professional Certifications19
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/18/2026Q01297896-I1Open ↗
08/16/2026Q01312235-P1Open ↗
08/16/2026Q01312235-S1Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
12/31/2015420105512Open ↗
12/23/2015402394789Open ↗
11/19/2009420105512Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/23/2026Q01312235-I1Open ↗
09/23/2026Q01312235-I1Open ↗
08/24/2026Q01312235-S1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
11/19/2009420105512Open ↗
03/24/2008410089005Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
11/19/2009420105512Open ↗
03/24/2008410089005Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/23/2026Q01312235-I1Open ↗
08/24/2026Q01312235-S1Open ↗
▸Trade Schedules & Equipment2
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
02/03/2010420105512Open ↗
11/19/2009420105512Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/18/2026Q01297896-I1Open ↗
08/16/2026Q01312235-P1Open ↗
08/16/2026Q01312235-S1Open ↗
Showing 3 of 5 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
11/19/2009420105512Open ↗
03/24/2008410089005Open ↗
▸Approvals, Objections & Sign-offs6
▸BISSCHEDULE A - OCCUPANCY / USE3
07/15/2016402394789Open ↗
06/24/2016402394789Open ↗
04/25/2016402394789Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
11/19/2009420105512Open ↗
03/24/2008410089005Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
12/31/2015420105512Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
03/27/2008410089005Open ↗
▸Filing & Intake Forms3
▸BISEFILING COVER SHEET2
11/19/2009420105512Open ↗
03/24/2008410089005Open ↗
▸BISADDITIONAL INFORMATION1
07/15/2016402394789Open ↗