← Back
Two family brick
156 28 AVENUE
BROOKLYN · Gravesend (South) · BIN 3187288
💬 Discuss this project
1940Year Built
2Stories
B1Building Class
R5Zoning
2,595 sfGross Floor Area
2Units
Two family brick · 1,933 sf lot · 1.34 FAR built · Flood zone X500
Locations of Work
ArchitecturePlumbing
Floor 26p · 2 filings · 12 docs
Floor 15p · 2 filings · 12 docs
Sub-Basement5p · 2 filings · 12 docs
Site & exterior1 filing · 8 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/07/2025$998K—Private party → Private party$385/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
FARHAD BASSIRI-TEHRANI405/28/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ECDESIGN STUDIO803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KALE CONSTRUCTION INCGeneral Contractor107/08/2026
CATMAN PLUMBING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BASSIRI8394205/28/2025
Building Lifecycle
All (19)Filed (4)Permit Issued (2)Signed Off (2)Inspection (5)Special Inspection (6)
08/19/2025
Signed off — Alteration
RENOVATION OF EXISTING BASEMENT, FIRST AND SECOND FLOOR WITH PLUMBING WORK: RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW WASHER, DRYER, BOILERS AND HOT WATER HEATERS IN BASEMENT; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01212059-I1
07/16/2025
Signed off — Alteration
RENOVATION OF EXISTING BASEMENT, FIRST AND SECOND FLOOR WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK;REPLACE STAIR IN OSP. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01212057-I1
07/15/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
07/11/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
05/29/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FARHAD BASSIRI-TEHRANI
05/29/2025
Special inspection requirement — Energy Code Compliance Inspections
FARHAD BASSIRI-TEHRANI
05/29/2025
Special inspection requirement — Fire-Resistance Rated Construction
FARHAD BASSIRI-TEHRANI
05/28/2025
Filed — Alteration
RENOVATION OF EXISTING BASEMENT, FIRST AND SECOND FLOOR WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK;REPLACE STAIR IN OSP. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01212057-P1
05/28/2025
Filed — Alteration
RENOVATION OF EXISTING BASEMENT, FIRST AND SECOND FLOOR WITH PLUMBING WORK: RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW WASHER, DRYER, BOILERS AND HOT WATER HEATERS IN BASEMENT; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01212059-P1
05/28/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FARHAD BASSIRI-TEHRANI
05/28/2025
Special inspection requirement — Energy Code Compliance Inspections
FARHAD BASSIRI-TEHRANI
05/28/2025
Special inspection requirement — Fire-Resistance Rated Construction
FARHAD BASSIRI-TEHRANI
05/23/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
05/23/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/20/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/24/2025
Permit issued — General Construction
B01212057-I1-GC
04/22/2025
Permit issued — Plumbing
B01212059-I1-PL
04/18/2025
Filed — Alteration
RENOVATION OF EXISTING BASEMENT, FIRST AND SECOND FLOOR WITH PLUMBING WORK: RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW WASHER, DRYER, BOILERS AND HOT WATER HEATERS IN BASEMENT; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01212059-I1
04/18/2025
Filed — Alteration
RENOVATION OF EXISTING BASEMENT, FIRST AND SECOND FLOOR WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK;REPLACE STAIR IN OSP. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01212057-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offKALE CONSTRUCTION INC04/24/2025
DOB NOWPlumbingSigned-offCATMAN PLUMBING INC04/22/2025
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
07/15/2025Pass-Final General Construction Non-Directive 14PassView ↗
07/11/2025Fail-Final General Construction Non-Directive 14FailView ↗
05/23/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/23/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/20/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
05/29/2025Fire-Resistant Penetrations and JointsFARHAD BASSIRI-TEHRANIspecial
05/29/2025Energy Code Compliance InspectionsFARHAD BASSIRI-TEHRANIprogress
05/29/2025Fire-Resistance Rated ConstructionFARHAD BASSIRI-TEHRANIprogress
05/28/2025Fire-Resistant Penetrations and JointsFARHAD BASSIRI-TEHRANIspecial
05/28/2025Energy Code Compliance InspectionsFARHAD BASSIRI-TEHRANIprogress
05/28/2025Fire-Resistance Rated ConstructionFARHAD BASSIRI-TEHRANIprogress
▾Documents — 12 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/21/2026B01212057-I1Request digital key ↗
08/21/2026B01212057-P1Request digital key ↗
08/21/2026B01212059-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications8
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/21/2026B01212057-I1Open ↗
08/21/2026B01212057-P1Open ↗
08/21/2026B01212059-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
09/01/2026B01212057-I1Open ↗
08/23/2026B01212057-P1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026B01212057-I1Open ↗
08/23/2026B01212057-P1Open ↗