← Back
Condo, residential tower (mixed-use, multi-family elevator) [derived]
156 BEACH 9 STREET
QUEENS · BIN 4537516
💬 Discuss this project
2007Year Built
8Stories
RMBuilding Class
R6Zoning
69,416 sfGross Floor Area
88Units
LL97 CoveredRent Stabilized1 Open Violation ▸FISP: SAFEFDNY Report ↗
Condo, residential tower (mixed-use, multi-family elevator) [derived] · 22,490 sf lot · 3.09 FAR built · Flood zone X500
Locations of Work
ArchitectureMechanicalPlumbingFire Protection
Floor 231p · 3 filings · 20 docs
Floor 125p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
RED GROUP MANAGEMENT303/22/2026
GEEZMAN CO203/22/2026
EURO BUILDERS303/22/2026
EUROPEAN BUILDERS103/22/2026
BEACH 9TH REALTY103/22/2026
BEACH 9 REALTY2803/21/2026
EUROPEAN BUILDERS CONTRACTORS903/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
EP ENGINEERING LLC404/17/2023
HALSEY MCCORMACK HELMER INC204/17/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PAUL FUSCO CONSULTING1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CARO GROUP LTDGeneral Contractor207/08/2026
ARIANA CONTRACTING INCFire Protection107/08/2026
COPPER PLUMBING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
KALLASSY ENGINEERING PLLC5711312/05/2022
Building Lifecycle
All (86)Filed (6)Permit Issued (4)Facade (FISP) (6)Violation (35)Inspection (5)Special Inspection (30)
06/05/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/17/2024
Cycle 9 facade report signed — SAFE
03/29/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
03/26/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/26/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/22/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/14/2024
Permit issued — Plumbing
Q08023590-I1-EW-SP
03/12/2024
Permit issued — Plumbing
Q08023590-I1-PL
02/28/2024
Permit issued — Mechanical Systems
Q08023577-I1-MS
02/21/2024
Cycle 9 facade report submitted
02/21/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/19/2024
Cycle 9 facade inspection completed
02/16/2024
Permit issued — General Construction
Q08023569-I1-GC
11/02/2023
Violation issued (FDNY_NOV, closed)
04/22/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/18/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Joseph El-kallassy
04/18/2023
Special inspection requirement — Tenant Protection Plan Compliance
Joseph El-kallassy
04/18/2023
Special inspection requirement — Final
Joseph El-kallassy
04/18/2023
Special inspection requirement — Interior lighting power
Joseph El-kallassy
04/18/2023
Special inspection requirement — Lighting controls
Joseph El-kallassy
04/17/2023
Filed — Alteration
FILING FOR INTERIOR RENOVATION OF EXISTING OFFICES AND THERAPY ROOMS AND RELOCATION AND EXPANSION OF CONFERENCE ROOM ON THE SECOND FLOOR ONLY.NO CHANGE IN USE, EGRESS, OR OCCUPANCY
Q08023569-P1
04/17/2023
Filed — Alteration
Q08023577-P1
04/17/2023
Filed — Alteration
MODIFICATIONS TO EXISTING PLUMBING AND SPRINKLER SYSTEMS. NO CHANGE TO USE, OCCUPANCY OR EGRESS
Q08023590-P1
04/17/2023
Special inspection requirement — HVAC-R and service water heating equipment
04/17/2023
Special inspection requirement — Sprinkler Systems
04/17/2023
Special inspection requirement — Tenant Protection Plan Compliance
04/17/2023
Special inspection requirement — Maintenance information
04/17/2023
Special inspection requirement — HVAC-R and service water heating system controls
04/17/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
04/17/2023
Special inspection requirement — Post-installed Anchors
Joseph El-kallassy
04/17/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Joseph El-kallassy
04/17/2023
Special inspection requirement — Tenant Protection Plan Compliance
Joseph El-kallassy
04/17/2023
Special inspection requirement — Mechanical Systems
Joseph El-kallassy
04/17/2023
Special inspection requirement — Final
Joseph El-kallassy
04/17/2023
Special inspection requirement — Duct leakage testing, insulation and design
Joseph El-kallassy
04/17/2023
Special inspection requirement — Shutoff dampers
Joseph El-kallassy
04/17/2023
Special inspection requirement — HVAC-R and service water heating system controls
Joseph El-kallassy
04/17/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Joseph El-kallassy
04/17/2023
Special inspection requirement — HVAC-R and service water heating equipment
Joseph El-kallassy
04/17/2023
Special inspection requirement — Maintenance information
Joseph El-kallassy
04/17/2023
Special inspection requirement — Sprinkler Systems
Joseph El-kallassy
04/17/2023
Special inspection requirement — Post-installed Anchors
Joseph El-kallassy
04/17/2023
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
Giovanni Melendez
04/17/2023
Special inspection requirement — Tenant Protection Plan Compliance
Joseph El-kallassy
04/17/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Joseph El-kallassy
04/17/2023
Special inspection requirement — HVAC-R and service water heating equipment
Joseph El-kallassy
04/17/2023
Special inspection requirement — Maintenance information
Joseph El-kallassy
04/17/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Joseph El-kallassy
03/30/2023
Violation issued (HPD, closed)
A
12/05/2022
Filed — Alteration
FILING FOR INTERIOR RENOVATION OF EXISTING OFFICES AND THERAPY ROOMS AND RELOCATION AND EXPANSION OF CONFERENCE ROOM ON THE SECOND FLOOR ONLY.NO CHANGE IN USE, EGRESS, OR OCCUPANCY
Q08023569-I1
12/05/2022
Filed — Alteration
Q08023577-I1
12/05/2022
Filed — Alteration
MODIFICATIONS TO EXISTING PLUMBING AND SPRINKLER SYSTEMS. NO CHANGE TO USE, OCCUPANCY OR EGRESS
Q08023590-I1
06/02/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/09/2022
Violation issued (HPD, closed)
A
11/30/2021
Violation issued (ECB, closed)
Construction
10/15/2021
Violation issued (ECB, closed)
Construction
01/27/2020
Violation issued (ECB, closed)
Elevators
02/17/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/13/2017
Cycle 8 facade report submitted
12/12/2017
Cycle 8 facade report signed — SWARMP
Latest 60 of 86 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offARIANA CONTRACTING INC03/14/2024
DOB NOWPlumbingSigned-offCOPPER MECHANICAL INC03/12/2024
DOB NOWMechanical SystemsPermit IssuedCARO GROUP02/28/2024
DOB NOWGeneral ConstructionSigned-offCARO GROUP02/16/2024
BISMHISSUEDEURO BUILDERS LLC09/06/2007
BISPLISSUEDMMI PLUMBING & HEATING INC.04/11/2007
BISSPISSUEDFIREQUEST CORP04/11/2007
BISEQISSUEDEURO BUILDERS LLC02/05/2007
BIS—ISSUEDEURO BUILDERS LLC02/05/2007
BISEQISSUEDEURO BUILDERS LLC01/16/2007
BIS—ISSUEDEURO BUILDERS LLC01/03/2007
BISEQISSUEDEUROPEAN BUILDERS & CONT. CORP01/03/2007
BISEQISSUEDEURO BUILDERS LLC01/03/2007
BISPLISSUEDMMI PLUMBING & HEATING INC.11/08/2006
BISEQISSUEDEURO BUILDERS LLC08/31/2006
BIS—ISSUEDEURO BUILDERS LLC01/03/2006
BISEQISSUEDEURO BUILDERS LLC01/03/2006
BISPLISSUEDARIEL SERVICES INC08/17/2005
BISEQISSUEDEURO BUILDERS LLC03/23/2005
BIS—ISSUEDEURO BUILDERS LLC03/23/2005
BISEQISSUEDEURO BUILDERS LLC03/08/2005
BISEQISSUEDEUROPEAN BUILDERS & CONT. CORP01/03/2005
BISEQISSUEDEUROPEAN BUILDERS & CONT. CORP01/30/2004
BISEQISSUEDEUROPEAN BUILDERS & CONT. CORP09/29/2003
1 project · most recent 04/17/2023
FiledStatusContractorScope
04/17/2023Signed-offARIANA CONTRACTING INC23 heads
1 project · most recent 04/17/2023
Water/Sanitary
FiledStatusContractorScope
04/17/2023Signed-offCOPPER PLUMBING INCWater/Sanitary
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
06/05/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/29/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/26/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/26/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/22/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 39
DateRequirementInspectorRole
04/18/2023Fire-Resistant Penetrations and JointsJoseph El-kallassyspecial
04/18/2023Tenant Protection Plan ComplianceJoseph El-kallassyspecial
04/18/2023FinalJoseph El-kallassyprogress
04/18/2023Interior lighting powerJoseph El-kallassyenergy_progress
04/18/2023Lighting controlsJoseph El-kallassyenergy_progress
04/17/2023HVAC-R and service water heating equipment—energy_progress
04/17/2023Sprinkler Systems—special
04/17/2023Tenant Protection Plan Compliance—special
04/17/2023Maintenance information—energy_progress
04/17/2023HVAC-R and service water heating system controls—energy_progress
04/17/2023HVAC-R and service water piping design and insulation—energy_progress
04/17/2023Post-installed AnchorsJoseph El-kallassyspecial
04/17/2023Fire-Resistant Penetrations and JointsJoseph El-kallassyspecial
04/17/2023Tenant Protection Plan ComplianceJoseph El-kallassyspecial
04/17/2023Mechanical SystemsJoseph El-kallassyspecial
04/17/2023FinalJoseph El-kallassyprogress
04/17/2023Duct leakage testing, insulation and designJoseph El-kallassyenergy_progress
04/17/2023Shutoff dampersJoseph El-kallassyenergy_progress
04/17/2023HVAC-R and service water heating system controlsJoseph El-kallassyenergy_progress
04/17/2023HVAC-R and service water piping design and insulationJoseph El-kallassyenergy_progress
04/17/2023HVAC-R and service water heating equipmentJoseph El-kallassyenergy_progress
04/17/2023Maintenance informationJoseph El-kallassyenergy_progress
04/17/2023Sprinkler SystemsJoseph El-kallassyspecial
04/17/2023Post-installed AnchorsJoseph El-kallassyspecial
04/17/2023Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)Giovanni Melendezspecial
Latest 25 of 39.
▾Documents — 37 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/25/2026Q08023590-I1Request digital key ↗
08/25/2026Q08023590-P1Request digital key ↗
08/24/2026Q08023569-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications31
▸DOB NOWProgress Inspector Seal & Signature14
09/01/2026Q08023569-I1Open ↗
09/01/2026Q08023569-I1Open ↗
09/01/2026Q08023569-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
09/01/2026Q08023569-I1Open ↗
09/01/2026Q08023569-I1Open ↗
08/26/2026Q08023590-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/25/2026Q08023590-I1Open ↗
08/24/2026Q08023569-P1Open ↗
08/24/2026Q08023569-I1Open ↗
Showing 3 of 6 on file for this type