← Back
Zoned commercial or Manhattan residential
156 BOWERY
MANHATTAN · BIN 1007154
💬 Discuss this project
0Year Built
—Stories
V1Building Class
C6-1GZoning
0 sfGross Floor Area
0Units
Rent Stabilized33 Open Violations ▸
Zoned commercial or Manhattan residential · Owner of record: 156-166 BOWERY L.P. · 2,508 sf lot · 0 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Roof6p · 1 filing · 17 docs
Bulkhead1p · 1 filing · 17 docs
Floor 71p · 1 filing · 17 docs
Floor 61p · 1 filing · 17 docs
Floor 51p · 1 filing · 17 docs
Floor 4
Floor 3
Floor 2
Floor 1
Cellar6p · 1 filing · 17 docs
1 job · most recent 02/13/2023
Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
02/13/2023——Air Conditioning Systems, Ventilation Systems
Cooling
Carrier 36MN-61W 1,854,000 BTU ×2
Greenheck SQ-99-VG 550 CFM · Exhaust Fan ×1
Ventilation
Greenheck SAF-118-50 8,000 CFM · Makeup Air ×2
USF-40 25,000 CFM · Makeup Air ×2
CUE-160-VG 4,500 CFM · Exhaust Fan ×1
SQ-130-VG 5 CFM · Exhaust Fan ×1
USF-27 7,500 CFM · Exhaust Fan ×1
VEKTOR-MH-27-9-70 20,000 CFM · Exhaust Fan ×1
1 job · most recent 11/18/2024
FiledStatusContractorScope
11/18/2024CompleteHIGH QUALITY ELECTRIC OF—
1 job · most recent 02/13/2023
FiledStatusContractorScope
02/13/2023——2 scope_items
1 job · most recent 01/17/2025
Fence Sidewalk Shed
FiledStatusContractorScope
01/17/2025Signed-offCELTIC SERVICES NYC INCFence, Sidewalk Shed
Building Lifecycle
All (157)Filed (16)Permit Issued (8)Signed Off (2)Violation (43)Objection (59)Special Inspection (29)
04/29/2026
Violation issued (HPD, open)
A
02/17/2026
Permit issued — General Construction
M01282062-I1-GC
11/17/2025
Violation issued (HPD, open)
I
11/10/2025
Permit issued — General Construction
M01282062-I1-GC
10/01/2025
Filed — Alteration
M01282062-I1
06/04/2025
Violation issued (HPD, open)
A
04/24/2025
Signed off — Full Demolition
INSTALL 8' HIGH PLYWOOD CONSTRUCTION FENCE ALONG 156, 158, 160, 162, 164, 166 BOWERY, LOTS 39, 38, 37, 36, 35, 34, 33 IN CONJUNCTION WITH DEMOLITION OF ALL BUILDINGS ON THESE LOTS
M01114497-I1
03/05/2025
Objection resolved — Addressed
03/05/2025
Special inspection requirement — Structural Stability – Alterations of existing Buildings
JOHN MCMONAGLE
02/28/2025
Objection raised — Fire_Protection
02/21/2025
Objection resolved — Addressed
01/31/2025
Objection raised — Other
01/17/2025
Filed — Full Demolition
INSTALL 8' HIGH PLYWOOD CONSTRUCTION FENCE ALONG 156, 158, 160, 162, 164, 166 BOWERY, LOTS 39, 38, 37, 36, 35, 34, 33 IN CONJUNCTION WITH DEMOLITION OF ALL BUILDINGS ON THESE LOTS
M01114497-P3
01/15/2025
Special inspection requirement — Structural Stability – Alterations of existing Buildings
JOHN MCMONAGLE
11/22/2024
Violation issued (HPD, open)
I
11/20/2024
Permit issued — Full Demolition
M01114497-I1-FD
11/12/2024
Permit issued — Supported Scaffold
M01114497-S4-SF
11/11/2024
Filed — Full Demolition
INSTALL 8' HIGH PLYWOOD CONSTRUCTION FENCE ALONG 156, 158, 160, 162, 164, 166 BOWERY, LOTS 39, 38, 37, 36, 35, 34, 33 IN CONJUNCTION WITH DEMOLITION OF ALL BUILDINGS ON THESE LOTS
M01114497-S4
11/11/2024
Special inspection requirement — Post-installed Anchors
GURVINDER SINGH
11/11/2024
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
GURVINDER SINGH
11/07/2024
Permit issued — Protection and Mechanical Methods
M01114497-S3-PMM
11/05/2024
Filed — Full Demolition
INSTALL 8' HIGH PLYWOOD CONSTRUCTION FENCE ALONG 156, 158, 160, 162, 164, 166 BOWERY, LOTS 39, 38, 37, 36, 35, 34, 33 IN CONJUNCTION WITH DEMOLITION OF ALL BUILDINGS ON THESE LOTS
M01114497-S3
10/24/2024
Permit issued — Construction Fence
M01114497-S1-FN
10/21/2024
Filed — Full Demolition
INSTALL 8' HIGH PLYWOOD CONSTRUCTION FENCE ALONG 156, 158, 160, 162, 164, 166 BOWERY, LOTS 39, 38, 37, 36, 35, 34, 33 IN CONJUNCTION WITH DEMOLITION OF ALL BUILDINGS ON THESE LOTS
M01114497-S1
10/15/2024
Permit issued — Sidewalk Shed
M01114497-S2-SH
10/10/2024
Filed — Full Demolition
INSTALL 8' HIGH PLYWOOD CONSTRUCTION FENCE ALONG 156, 158, 160, 162, 164, 166 BOWERY, LOTS 39, 38, 37, 36, 35, 34, 33 IN CONJUNCTION WITH DEMOLITION OF ALL BUILDINGS ON THESE LOTS
M01114497-S2
09/30/2024
Filed — Full Demolition
INSTALL 8' HIGH PLYWOOD CONSTRUCTION FENCE ALONG 156, 158, 160, 162, 164, 166 BOWERY, LOTS 39, 38, 37, 36, 35, 34, 33 IN CONJUNCTION WITH DEMOLITION OF ALL BUILDINGS ON THESE LOTS
M01114497-I1
04/01/2024
Violation issued (HPD, open)
A
11/15/2023
Violation issued (HPD, open)
I
03/15/2023
Violation issued (HPD, open)
A
03/06/2023
Objection resolved — Resolved
03/06/2023
Objection resolved — Resolved
03/06/2023
Objection resolved — Resolved
03/06/2023
Objection resolved — Resolved
03/03/2023
Signed off — Alteration
M00789697-I1
02/21/2023
Objection raised — Structural
02/21/2023
Objection raised — Scope
02/21/2023
Objection raised — Other
02/21/2023
Objection raised — Admin
02/21/2023
Objection raised — Energy
02/21/2023
Objection raised — Scope
02/21/2023
Objection raised — Scope
02/21/2023
Objection raised — Structural
02/21/2023
Objection raised — Fire_Protection
02/21/2023
Objection raised — Admin
02/17/2023
Objection raised — Energy
02/17/2023
Objection raised — Scope
02/17/2023
Objection raised — Admin
02/17/2023
Objection raised — Zoning
02/13/2023
Filed — New Building
Foundation/Earthwork in conjunction with 7 Story Commercial building filed under M00703761-I1. Structural work for reference is under M00703761-I5.
M00703761-S7
02/13/2023
Filed — New Building
Foundation/Earthwork in conjunction with 7 Story Commercial building filed under M00703761-I1. Structural work for reference is under M00703761-I5.
M00703761-S8
02/13/2023
Filed — New Building
Foundation/Earthwork in conjunction with 7 Story Commercial building filed under M00703761-I1. Structural work for reference is under M00703761-I5.
M00703761-S6
01/24/2023
Filed — Alteration
M00740319-I1
11/02/2022
Violation issued (HPD, open)
I
11/01/2022
Filed — New Building
Foundation/Earthwork in conjunction with 7 Story Commercial building filed under M00703761-I1. Structural work for reference is under M00703761-I5.
M00703761-S5
09/12/2022
Permit issued — General Construction
M00789697-I1-GC
08/31/2022
Filed — Alteration
M00789697-I1
08/23/2022
Special inspection requirement — Final
ROBESPIERRE ARISTILDE
05/31/2022
Special inspection requirement — High-Pressure Fuel-Gas Piping (Welding)
05/31/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Latest 60 of 157 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CELTIC SERVICES NYC1607/08/2026
REEC 156 BOWERY203/21/2026
JD HOROWITZ TRUST203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PVE ENGINEERING110/01/2025
AGE ENGINEERING, LLC801/17/2025
PERKINS&WILL ARCHITECTS, PC402/13/2023
SULLIVAN GROUP DESIGN LLC101/24/2023
GACE DPC211/01/2022
GEODESIGN INC. PC104/26/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ARCHI PRO GROUP603/21/2026
NORTHEAST EXPEDITING203/21/2026
A1 EXPEDITING SERVICE CORP.803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CELTIC SERVICES NYC INCGeneral Contractor1707/08/2026
HIGH QUALITY ELECTRIC OFElectrical103/22/2026
4 BROTHERS & SONS FENCEGeneral Contractor104/09/2026
GOLDSTONE HOME IMPROVEMENGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DOMANI INSPECTION SERVICE843201/17/2025
AP PROFESSIONAL ENGINEERI5974111/11/2024
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedGOLDSTONE HOME IMPROVEMEN02/17/2026
DOB NOWGeneral ConstructionPermit Issued4 BROTHERS SONS FENCE11/10/2025
DOB NOWFull DemolitionSigned-offCELTIC SERVICES NYC INC11/20/2024
DOB NOWSupported ScaffoldSigned-offCELTIC SERVICES NYC INC11/12/2024
DOB NOWProtection and Mechanical MethodsSigned-offCELTIC SERVICES NYC INC11/07/2024
DOB NOWConstruction FenceSigned-offCELTIC SERVICES NYC INC10/24/2024
DOB NOWSidewalk ShedSigned-offCELTIC SERVICES NYC INC10/15/2024
DOB NOWGeneral ConstructionSigned-offCELTIC SERVICES NYC INC09/12/2022
DOB NOWFull DemolitionSigned-offCELTIC SERVICES NYC INC—
BISOTISSUEDVARDO CONSTRUCTION CORP03/06/2003
BISOTISSUEDL.G.B.DEVELOPMENT,INC.04/28/1993
▾Special Inspection Requirements (DOB NOW) — 29
DateRequirementInspectorRole
03/05/2025Structural Stability – Alterations of existing BuildingsJOHN MCMONAGLEspecial
01/15/2025Structural Stability – Alterations of existing BuildingsJOHN MCMONAGLEspecial
11/11/2024Post-installed AnchorsGURVINDER SINGHspecial
11/11/2024Alternative Materials - OTCR Buildings Bulletin NumberGURVINDER SINGHspecial
08/23/2022FinalROBESPIERRE ARISTILDEprogress
05/31/2022High-Pressure Fuel-Gas Piping (Welding)—special
05/31/2022Fire-Resistant Penetrations and Joints—special
05/31/2022Heating Systems—special
05/31/2022High-Pressure Steam Piping (Welding)—special
05/31/2022Post-installed Anchors—special
05/31/2022Smoke Control Systems Testing—special
05/31/2022Final—progress
05/31/2022HVAC-R and service water heating equipment—energy_progress
05/31/2022HVAC-R and service water piping design and insulation—energy_progress
05/31/2022Duct leakage testing, insulation and design—energy_progress
05/31/2022Shutoff dampers—energy_progress
05/31/2022HVAC-R and service water heating system controls—energy_progress
05/31/2022Mechanical Systems—special
05/27/2022Post-installed Anchors—special
05/27/2022Structural Steel - Welding—special
05/27/2022Structural Steel - High Strength Bolting—special
05/27/2022Structural Steel - Details—special
05/27/2022Post-installed Anchors—special
05/27/2022Sprinkler Systems—special
05/27/2022Standpipe Systems—special
Latest 25 of 29.
▾Documents — 69 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
09/01/2026M00789697-I1Request digital key ↗
09/01/2026M00740319-I1Request digital key ↗
08/25/2026M01114497-P3Request digital key ↗
Showing 3 of 10 on file for this type
▸Applications & Permits4
▸BISPLAN / WORK APPROVAL APPLICATION4
10/02/2025123908290Open ↗
06/06/2025141019065Open ↗
06/08/2022141019065Open ↗
Showing 3 of 4 on file for this type
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026M00703761-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026M00703761-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026M00703761-I1Open ↗
▸Seals & Professional Certifications25
▸DOB NOWDPL-1: Design Professional Seal & Signature17
08/25/2026M01114497-I1Open ↗
08/25/2026M01114497-S1Open ↗
08/21/2026M01282062-I1Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/30/2026M01114497-P3Open ↗
08/23/2026M01114497-S4Open ↗
08/23/2026M01114497-S4Open ↗
Showing 3 of 4 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
06/08/2022141019065Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
06/08/2022141019065Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
06/07/2021123908290Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
09/02/2026M00789697-I1Open ↗
▸Trade Schedules & Equipment4
▸DOB NOWElectric Cut-Off1
08/13/2026M01114497-I1Open ↗
▸DOB NOWWater Cut-Off1
08/13/2026M01114497-I1Open ↗
▸DOB NOWGas Cut-Off1
08/13/2026M01114497-I1Open ↗
▸DOB NOWSewer Cut-Off1
08/13/2026M01114497-I1Open ↗
▸Safety & Tenant Protection4
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
06/07/2021123908290Open ↗
▸BISBPP: STREET TREES SITE PLAN1
06/08/2022141019065Open ↗
▸BISSRO MD ANTI-HARASSMENT CHECKLIST1
06/07/2021123908290Open ↗
▸DOB NOWStreet Tree Checklist1
08/13/2026M00703761-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026M00789697-I1Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/13/2026M01114497-I1Open ↗
▸DOB NOWRodent Control1
08/13/2026M01114497-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸BISLETTERS - SUPPORTING DOCUMENTATION1
10/03/2025123908290Open ↗
▸Filing & Intake Forms3
▸BISEFILING JOB APPLICATION COVER SHEET1
06/08/2022141019065Open ↗
▸BISBOROUGH INTAKE FORM1
06/07/2021123908290Open ↗
▸BISEFILING COVER SHEET1
06/07/2021123908290Open ↗
▸Other Documents12
▸DOB NOWProperty Ownership Certification3
08/25/2026M01114497-I1Open ↗
08/13/2026M01114497-P3Open ↗
08/13/2026M00703761-I1Open ↗
▸DOB NOWAdjoining Owners Notification2
08/13/2026M00703761-S2Open ↗
08/13/2026M00703761-S1Open ↗
▸DOB NOWStructure Photographs2
08/25/2026M01114497-I1Open ↗
08/13/2026M01114497-P3Open ↗
▸BISVERIFY DOB PLAN NAMING STANDARD IS MET1
06/08/2022141019065Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
06/08/2022141019065Open ↗
▸DOB NOWFull Demo: 10-Day Notice1
08/13/2026M01114497-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026M00703761-I1Open ↗
▸DOB NOWCommunity Board Notification1
08/13/2026M01114497-I1Open ↗