← Back
BuildNYC
One story - permanent living quarter
156 JEROME ROAD
STATEN ISLAND · BIN 5049727
💬 Discuss this project
1955Year Built
1Stories
A2Building Class
R3XZoning
1,152 sfGross Floor Area
1Units
One story - permanent living quarter · 4,000 sf lot · 0.29 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof1p · 1 filing · 20 docs
Floor 218p · 1 filing · 20 docs
Floor 118p · 1 filing · 20 docs
Cellar20p · 1 filing · 20 docs
Site & exterior1p · 1 filing · 2 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Jahmal Sabaha PE Consulting Engineering1103/09/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
KMS Drafting2203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Expert MaintenanceGeneral Contractor104/09/2026
Goldstone General ConstructionGeneral Contractor104/09/2026
Expert MaintenanceScaffold104/09/2026
Goldstone General ConstructionScaffold104/09/2026
Goldstone General Constructionspecialty_contractor107/08/2026
John Fitzgerald Plumbing & HeatingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A Tech Engineering NYC, P6738603/09/2026
Arc Consulting Engineers4083303/12/2025
Building Lifecycle
04/08/2026
Signed off — Alteration CO
Propose vertical enlargement. Interior renovation with exterior restoration. New finishes and trims. Obtain certificate of occupancy for two(2) family dwelling
S00818158-I1
03/26/2026
Special inspection requirement — Masonry
anthony santoro
03/26/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
anthony santoro
03/26/2026
Special inspection requirement — Construction Operations Influencing Adjacent Structures
anthony santoro
03/26/2026
Special inspection requirement — Air barrier - visual inspection
anthony santoro
70 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offGoldstone General Construction05/19/2025
DOB NOWGeneral ConstructionPermit IssuedGoldstone General Construction06/21/2024
DOB NOWConstruction FenceSigned-offGoldstone General Construction06/10/2024
DOB NOWPlumbingSigned-offJohn Fitzgerald Plumbing & Heating03/04/2024
DOB NOWGeneral ConstructionPermit IssuedExpert Maintenance12/29/2023
DOB NOWConstruction FenceSigned-offExpert Maintenance11/13/2023
1 project · most recent 03/09/2026
Heating and Air Conditioning Systems
FiledStatusContractorScope
03/09/2026Signed-offGoldstone General ConstructionHeating and Air Conditioning Systems
1 project · most recent 03/09/2026
Gas Water/Sanitary
FiledStatusContractorScope
03/09/2026Signed-offJohn Fitzgerald Plumbing & HeatingGas, Water/Sanitary
1 project · most recent 02/05/2024
General Wiring
FiledStatusContractorScope
02/05/2024CompleteRidge ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
06/24/2025Pass-Final CND-Occupancy InspectionPassView ↗
07/01/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/01/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 78
DateRequirementInspectorRole
03/26/2026Subsurface Investigations (Borings/Test Pits)anthony santorospecial
03/26/2026Fire-Resistant Penetrations and Jointsanthony santorospecial
03/26/2026Construction Operations Influencing Adjacent Structuresanthony santorospecial
03/26/2026Subgrade Inspectionsanthony santorospecial
03/26/2026Masonryanthony santorospecial
03/26/2026Energy Code Compliance Inspectionsanthony santoroprogress
03/26/2026Fire-Resistance Rated Constructionanthony santoroprogress
03/26/2026Permanent certificateanthony santoroenergy_progress
03/26/2026Maintenance informationanthony santoroenergy_progress
03/26/2026Fenestration and door U-factor and product ratingsanthony santoroenergy_progress
03/26/2026Meteringanthony santoroenergy_progress
03/26/2026Air barrier - visual inspectionanthony santoroenergy_progress
03/26/2026Insulation placement and R valuesanthony santoroenergy_progress
03/26/2026Fenestration air leakageanthony santoroenergy_progress
03/26/2026Structural Stability – Alterations of existing buildingsanthony santorospecial
03/26/2026Interior lighting poweranthony santoroenergy_progress
03/26/2026Fenestration areasanthony santoroenergy_progress
03/04/2026Masonryanthony santorospecial
03/04/2026Insulation placement and R valuesanthony santoroenergy_progress
03/04/2026Fenestration air leakageanthony santoroenergy_progress
03/04/2026Fenestration and door U-factor and product ratingsanthony santoroenergy_progress
03/04/2026Air barrier - visual inspectionanthony santoroenergy_progress
03/04/2026Maintenance informationanthony santoroenergy_progress
03/04/2026Interior lighting poweranthony santoroenergy_progress
03/04/2026Meteringanthony santoroenergy_progress
Latest 25 of 78.
105 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account