← Back
Miscellaneous two family
156 REGIS DRIVE
STATEN ISLAND · Mariner's Harbor-Arlington-Graniteville · BIN 5032571
💬 Discuss this project
1974Year Built
2Stories
B9Building Class
R3-2Zoning
1,912 sfGross Floor Area
2Units
Miscellaneous two family · 3,300 sf lot · 0.58 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC105/20/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNRUN INSTALLATION SVCGeneral Contractor106/27/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272105/20/2026
Building Lifecycle
All (8)Filed (1)Permit Issued (1)Signed Off (1)Special Inspection (5)
06/26/2026
Signed off — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01404623-I1
05/28/2026
Permit issued — Solar
S01404623-I1-SL
05/20/2026
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01404623-I1
05/20/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
05/20/2026
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
05/19/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
05/19/2026
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
05/19/2026
Special inspection requirement — Final
Walid Abdulla
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC05/28/2026
2 projects · most recent 09/21/2026
General Wiring
FiledStatusContractorScope
09/21/2026Permit IssuedHIGH BEAM ELECTRIC CORP.General Wiring
05/20/2026CompleteSUNRUN SOLAR ELECTL CORPGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
05/20/2026Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
05/20/2026Air barrier - visual inspectionWalid Abdullaenergy_progress
05/19/2026Fire-Resistant Penetrations and JointsWalid Abdullaspecial
05/19/2026Energy Code Compliance InspectionsWalid Abdullaprogress
05/19/2026FinalWalid Abdullaprogress
▾Documents — 5 on file (BIS + DOB NOW)
▸Seals & Professional Certifications5
▸DOB NOWProgress Inspector Seal & Signature3
09/14/2026S01404623-I1Open ↗
09/14/2026S01404623-I1Open ↗
09/14/2026S01404623-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/14/2026S01404623-I1Open ↗
09/14/2026S01404623-I1Open ↗